| 1. | | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | | Details of Project: | | (a)Name of the project(s) | SPAC STARCH PRODUCTS INDIA PRIVATE LIMITED | | (b)Name of the Company / Organisation | SPAC STARCH PRODUCTS (INDIA) PRIVATE LIMITED | | (c)Registered Address | D4/2, Vijayaraghava Manor,
Vijayaraghava Road,
Teynampet
Chennai
,,Chennai,Tamil Nadu-600018 | | (d)Legal Status of the Company | Private | | (e)Joint Venture | No | |
|
| 2. | | Address for the correspondence: | | (a)Name of the Applicant | Balamurugan Sidha Gounder | | (b)Designation (Owner/ Partner/ CEO) | Associate Vice President | | (c)Address | SPAC Starch Products (India) Private Limited,
S.F No: 65,66,67, Mugasipudur Post, Poonachi, Anthiyur Taluk ,,,Erode,Tamil Nadu-638314 | | (d)Pin code | 638314 | | (e)E-mail | gm@spacstarch.com | | (f)STD Code. | 0(f)Telephone No. | | | (g)Fax No. | | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
| 3. | | Category of the Project/Activity as per Schedule of EIA Notification,2006: | | (a.I)Project/Activity | 5g(a)-Grain Based distilleries for Ethanol Blended Petrol
| | Minor Activity | | | (b)Category | B2 | | Reason for Applying at Ministry | Select | | Zero Liqued Discharged | Yes | | (c)Proposal Number | IA/TN/IND2/288266/2022 | | (d)Master Proposal Number(Single Window) | SW/288262/2022 | | (e)EAC concerned (for category A Projects only) | NIL | | (f)Project Type | Fresh EC |
|
|
| 4. | | Location of the Project: | | (a)Plot/Survey/Khasra No. | S.F. No: 118/2, 118/3, 118/4, 118/7, 118/8, 118/9, | | (b)Pincode | 638314 | | (c)Bounded Latitudes (North) | | | From | | | Degree | 11 | | Minutes | 35 | | Second | 48.75 | | From | | | Degree | 11 | | Minutes | 35 | | Second | 52.82 | | (d)Bounded Longitudes (East) | | | From | | | Degree | 77 | | Minutes | 40 | | Second | 22.33 | | From | | | Degree | 77 | | Minutes | 40 | | Second | 44.00 | | (e)Survey of India Topo Sheet No. | 58E10 & 58E14 | | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | | (g)Maximum Elevation Above Means Sea Level(AMSL) | 196 | | (h)Uploaded (kml) File | Copy of Kml File  | | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | | (j)Seismic Zone | 2 | |
|
| 5. | | (a)Number of States in which Project will be Executed | 1 | | (b)Main State of the project | Tamil Nadu | |
|
|
| Details of State(s) of the project |
|---|
| S. No. | State Name | District Name | Tehsil Name | Village Name |
|---|
| (1.) | Tamil Nadu | Erode | Erode | Mugasipudur | |
|
| 6. | | Details of Project Configuration/Product: | |
|
| 6.1. Project Configuration |
|---|
| S. No. | Plant/Equipment/Facility | Configuration | Remarks |
|---|
| (1.) | Fuel Grade Bio-Ethanol | 160 KLPD | | |
| 6.2. Product |
|---|
| S. No. | Product/Activity (Capacity) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
|---|
| (1.) | DDGS (For Maize) | 17844 | Others | TPA | Road | | | (2.) | Captive Power Plant | 4.6 | Others | MW | Others | Transmission Lines | | (3.) | Absolute Alcohol | 160 | Kilo Litre per Day | | Road | | | (4.) | Technical Alcohol | 5.24 | Kilo Litre per Day | | Road | | | (5.) | DDGS (for Broken Rice) | 10320 | Others | TPA | Road | | | (6.) | CO2 | 14549.54 | Others | TPA | Road | | | (7.) | Fusel Oil | 0.16 | Kilo Litre per Day | | Road | | |
|
| 7. | | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | | Details Not Applicable | |
|
| 7.1. | | Details of CTE | | (i)Whether CTE obtained ? | NA | | (ii)Copies of all CTE obtained since inception | NA | | (iii)Date of Issue | N/A | | (iv)Valid Upto | N/A | | (v)File No. | NA | | (vi)Application No. | NA | | (vii)Copy of CTE valid as on date | NA | |
|
| 7.2. | | Details of Consent to Operate | | (iii)Date of Issue | 01-01-1900 00:00:00 | | (iv)Valid Upto | 01-01-1900 00:00:00 | | (v)File No. | NA | | (vi)Application No. | NA | | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
| 8. | | Project Cost: | | (a)Total Cost of the Project at current price level (in Crores) | 231.09 | | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 52.34 | | (c) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 10.11 | |
|
| | | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | -1 | | |
|   9. Raw Material / Fuel Profile |
|---|
| S. No. | Type | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) |
|---|
| (1.) | New | Broken Rice | 58778 | Tons per Annum | | Nearby farmers, rice mills and agencies | Road | | 200 | | (2.) | New | Maize | 66644 | Tons per Annum | | Nearby farmers, rice mills and agencies | Road | | 200 | | (3.) | New | Imported Coal | 29304 | Tons per Annum | | Open Market | Road | | 400 | | (4.) | New | Rice Husk | 86328 | Tons per Annum | | Open Market | Road | | 200 | |
|
| 10. Details of Water Requirement |
|---|
| S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
|---|
| (1.) | Surface | | 1036 | 6.34 | Copy of Permission Letter | Pipeline | | Others | Pipeline | G.O 282 | 26 Oct 2018 | 4380 | |
|
| 11. | | (a)Total Waste Water Generation | 0 | | (b)Total Discharged Water | 0 | | (c)Total Reused Water | 0 | |
|
| 11.1. Waste Water Management |
|---|
| S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Quantity of Treated water & Resives or Recycle (Kilolitre per Day) | Mode of Disposal | ZLD Plan Letter |
|---|
| (1.) | Sewage | 20 | 25 | 20 | ZLD | | Copy of ZLD Plan | |
| (2.) | From Process | 1543 | 1600 | 1467 | ZLD | | Copy of ZLD Plan |