Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Mahulsukha Iron and Manganese Ore Block by Ms Patnaik Minerals Private Ltd. over an area of 390.317 Ha in village Randa, Rantha and Bhutunda under Bonai Sub-Division and Lahunipada Tahasil of Sundergarh District, Odisha of of M/s Patnaik Minerals Pvt. Ltd
(b)Name of the Company / Organisation PATNAIK MINERALS PRIVATE LTD.
(c)Registered Address AT/PO. BANEIKALA, JODA, KEONJHAR, ODISHA,758038,,Kendujhar,Orissa-758038
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant SAROJ KUMAR PATNAIK
(b)Designation (Owner/ Partner/ CEO) DIRECTOR
(c)Address AT/PO. BANEIKALA, JODA, KEONJHAR,ODISHA,758038,,Barbil,Kendujhar,Orissa-758038
(d)Pin code 758038
(e)E-mail mahulsukhamines@rungtasons.com
(f)STD Code. 6767(f)Telephone No. 240105
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/OR/MIN/180360/2020
(d)Master Proposal Number(Single Window) SW/272977/2022
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khata no: 5,8,11,22,23,24,31,18,16,38,39,40
(b)Pincode 770040
(c)Bounded Latitudes (North)
From
Degree 21
Minutes 46
Second 52.12
From
Degree 21
Minutes 49
Second 04.55
(d)Bounded Longitudes (East)
From
Degree 85
Minutes 07
Second 55.43
From
Degree 85
Minutes 09
Second 10.42
(e)Survey of India Topo Sheet No. 73G/1
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 880
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 16
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaSundargarhLahuniparaRanda, Rantha and Bhutunda
(2.)OrissaSundargarhLahuniparaRanda, Rantha and Bhutuda
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11015/75/2020-IA-II(M)
(b)Date of Apply of TOR 03 Dec 2020
(c)Date of Issue of TOR / Standard ToR 20 Jan 2021
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :05 Sep 2021
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :08 Oct 2021
Distance of Public Hearing Venue from the Proposed Project :1
Bhutuda Gram Panchayat office under Lahunipada Block of Sundargarh District
State :Orissa
District :Sundargarh
Tehsil :Lahunipara
Village :Bhutuda
97Impact on agriculture, supply of drinking water, transport facility, employment, Health facilityOthersAdditional District Magistrate, Sundergarh
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Shovel2.5 Cu.m3 Nos
(2.)Rock Breaker--1 No
(3.)Diesel Browser--2 Nos
(4.)Mobile maintenance van--4 Nos
(5.)Staff Bus--1 No
(6.)Water tanker20 KL2 Nos
(7.)Water Tanker10 KL2 Nos
(8.)Shovel2.5 Cu.m2 Nos
(9.)Loader2.5 Cu.m3 Nos
(10.)Dumper20 T4 Nos
(11.)Dumper35 T14 No
(12.)Drill Machine100mm2 Nos
(13.)Loaders1.5 Cu.m2 Nos
(14.)Drill Machine85mm3 Nos
(15.)Shovel3.2 Cu.m3 Nos
(16.)Dozer400-440 HP1 No
(17.)Crane--1 No.
(18.)Excavator for Quick Dispatch System1 Cu.m3 Nos
(19.)Grader120 HP1 Nos
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Manganese Ore150000Tons per AnnumRoad,Rail
(2.)Iron Ore1000000Tons per AnnumRoad,Rail
(3.)Area390.32HectaresRoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? Obtained
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 31 Mar 2022
(iv)Valid Upto 31 Mar 2023
(v)File No. 2948
(vi)Application No. 3183624
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 20
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.38
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.4250
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.29
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Deisel9222OthersCu.m per annumOpen marketRoad25 Open MarketCopy of Linkage
(2.)EXPLOSIVE95Tons per AnnumTrimurti ExplosiveRoad50 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2020 To 28 Feb 2021
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube69.333.668.9100
(2.)NOxMicro Gram per Meter Cube19.511.718.380
(3.)OthersCOMili Gram per Meter Cube0.40.10.44
(4.)PM2.5Micro Gram per Meter Cube32.516.732.460
(5.)SO2Micro Gram per Meter Cube11.54.310.980
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.56.96.58.5
(2.)Total Hardnessmg/l18044200600
(3.)OthersAlkalinitymg/l10819200600
(4.)Heavy MetalsMercurymg/l0000
(5.)TSSmg/l0000
(6.)Chloridesmg/l1022501000
(7.)Fluoridemg/l0.0501.01.5
(8.)TDSmg/l220505002000
    14.3.     No. of Surface Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.457.0C
(2.)OthersTotal ColiformOthersMPN/100ml5011C
(3.)DOmg/l7.56.4C
(4.)BODmg/l22C
(5.)CODmg/l55C
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))55.230.875
(2.)Leq(Night)A-weighted decibels(dB(A))43.624.670
    14.5.     No. of Soil Sample Monitored locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare8212.5
(2.)N(Nitrogen)Kilogram per hectare339151
(3.)K(Potassium)Kilogram per hectare430202
(4.)Electric ConductivityMillisiemens per Centimetre0.110.04
(5.)pH6.96.1
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 16 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 14
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater842Copy of Permission LetterPipelineOthersBore wellCGWA/NOC/IND/ORIG/2022/1506709 Apr 202284
(2.)Surface642Copy of Permission LettermodeOthersTankerOthersRain water harvestingNil05 May 202284
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)0000Green Belt Renewal Plant0
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Over burden and insitu wasteOthersWaste from Iron ore Zone994446Tons1RoadOthersDumping, Backfilling and road maitenance
(2.)Overburden and insitu wasteOthersWaste from Manganeseore Zone1571880Tons1RoadOthersDumping, Backfilling and road maitenance
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube18.31018.380
(2.)SO2Microgram per Meter Cube11.51011.580
(3.)PM10Microgram per Meter Cube68.912.5871.48100
(4.)PM2.5Microgram per Meter Cube32.51032.560
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 63
(b)Source WESCO
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) DG Set 30 KVA
(e)Stack Height (in m) 1.5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 382.437
(b)Private Land (ha.) 1.081
(c)Government Land (ha.) 6.799
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 390.317
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 5182.53
(b)Waste/Barren Land (ha.) 15895
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 70.59
(e)Settlements (ha.) 28.3
(f)Industrial (ha.) 705
(g)Forest (ha.) 21370.8
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Nil 0
    Total (ha.) 43252.2200
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area112.39--
(2.)OB Dump Area21.094--
(3.)Area for Solid Waste Management29.854Top Soil and mineral storage
(4.)Built Up Area17.7Road and infrastructure
(5.)Green belt52.9--
(6.)OthersOther land use156.379Settling tank, RWH, Untouched area
Total (ha.) 390.317
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNil0No Critically polluted area located within 10 Km radius
(2.)WLSNil0No WLS exists within 10 Km radius
(3.)NPANil0No NPAs present within 10 Km radius
(4.)ESAsNil0No ESAs exists within 10 Km radius
(5.)ESZsNil0No ESZs exists within 10 Km radius
(6.)CorridorsNil0No Corridors exists within 10 Km radius
(7.)Wildlife CorridorsNil0No wildlife corridors exists withon 10 Km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestSarkanda PF0Lease area is the part of Sarkanda PF
(2.)Archaeological SitesNil0No archeological site exists within 10 Km
(3.)Defence InstallationsNil0No Defense installation exists within 10 Km
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Under Process(Stage-II)
(b)Legal Status of Forest Land Protected
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 390.32
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species One schedule I fauna found in core zone and 6 Schedule I fauna found in buffer zone
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 515.52 lakhs
(iii)Period of Implementation 10 Years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Bhutuda nala flows within the lease area
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kurarhi Nala
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 0.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 304
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 596
(e)No. of working days 300
(f)Total Manpower 1000
32.
Green Belt in Ha:
(a)Total Area of Green Belt 70.17
(b)Percentage of Total Project Area 17.98
(c)No. of Plants to be Planted 196746
(d)Funds Allocated for Plantation 200000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalWater sprinkling for dust supression, Plantation, Protection of Nala
(2.)SocialPeripheral Developmental activities includes health, education, drinking water supply, solar light etc.
(3.)FinancialEmployment generation for the local people
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 2
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)Iron OreMajor
(2.)Manganese OreMajor
2.
Mine Capacity in ROM (Run of Mine) 1150000
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. MP/A/17-ORI/BHU/2020-21
(b)Date of Approval 01 Oct 2020
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 390.317
(f)Approved Capacity 1150000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 33.54
(b)Mineable Reserves (Million Ton) 27.45
(c)Extractable Reserves(Million Ton) 27.45
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral +55% Fe - Iron Ore; +35% Mn - Manganese Ore
(f)Stripping Ratio 1 : 6
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 31
(i)Mining Method Opencast
(j)Life of Mine (Years) Iron ore - 29 years; Manganese Ore - 7 Years
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 390.317
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 18 Mar 2020
(iii)Validity of LOI 50
(iv)Reference No. of LOI 3013/SM, Bhubaneswar
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 390.317
(iii)Validity of the lease deed From : 29 Jun 2020 To : 28 Jun 2070
(iv)Date of Execution of Mining Lese 29 Jun 2020
(v)Reference Number IN-OD01084308552938S
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof New Auctioned Mines
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 6
(ii)Total Area (in Hectare) 21.094
(iii)Height (in meter) 20
(iv)Quantity (in Million Cubic meter) 1.80
(v)No. of year back fill up 5
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 89.308
(b)Depth (in meter) 60
(c)Volume (in Million Cubic meter) 10.41
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 0
13.
Details of Transportation:
(a)In Pit/Underground to Surface Mining pit to surface
(b)Surface to Siding/Loading Loading will be done by excavators and loaders
(c)Transportation / Conveyor Details Transported through Trucks/ Dumper
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)FOREST LAND382.4370382.437
(2.)WASTE LAND6.79906.799
(3.)AGRICULTURE LAND1.08101.081
(4.)GRAZING LAND000
(5.)SETTLEMENTS000
(6.)SURFACE WATER BODIES000
TOTAL390.3170390.317
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)ROADS0012.212.2
(2.)BUILT UP AREA (COLONY/OFFICE)005.55.5
(3.)TOP SOIL STORAGE1.05001.05
(4.)EXTERNAL OB DUMPS21.0940021.094
(5.)GREEN BELT52.90052.9
(6.)EXCAVATION/QUARRY112.3900112.39
(7.)VIRGIN AREA155.74900155.749
(8.)INTERNAL OB DUMPS0000
(9.)OtherMineral storage & Settling tank29.4340029.434
TOTAL372.617017.70390.317
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 21.094
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 112.39
(d)Safety Zone(in hectare) 52.9
(e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 372.615
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)20210.040.041.150.040
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2023/SA0149
(ii)Name of the EIA Consultant Kalyani Laboratories Private Limited
(iii)Address Plot. no. 78/944, Millenium city, Pahala, Bhubaneswar
(iv)Mobile No. 9437306091
(v)Landline No. 0674297504
(vi)Email Id kalyanilab@yahoo.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 02 Mar 2023
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) Copy of Uploaded Proposal Presentation
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterSir, This has reference to the online proposal stated above for expansion of Mahulsukha Iron & Mn. Ore Block by M/s. Rungta Sons Pvt. Ltd. over an area of 390.317 ha.(as per DGPS) /399.838 ha. (As per ROR) in Villages; Randa, Rantha & Bhutuda under Bonai Sub-Division & Lahunipara Tehsil of Sundargarh district, Odisha. In this context, we would like to bring the followings to your kind perusal that; 1. The Mining lease of Mahulsukha Iron & Manganese block is an auction mine vested to M/s Patnaik Minerals Pvt. Ltd. from M/s Aryan Mining & Trading Corporation Ltd. The Govt. of Odisha vide Letter NO.4246/IV(B)SM-23/2020/SM dated 30.05.2020 issued orders vesting all the valid rights, approvals, cleare3nces, licenses and the like vested in the previous lessee in favour of M/s Patnaik minerals Pvt. Ltd.. Then, the Govt. Of Odisha vide Order No. 5518/IV(B)SM-23/2020/SM dated 29.06.2020 granted mining lease for Iron & Manganese ore in favour of M/s Patnaik Minerals Pvt. Ltd for Mahulsukha Iron & Manganese Ore block over an area of 390.317(as per DGPS)/399.838ha ( as per ROR) for a period of 50 years and accordingly mining lease deed was executed on 29.06.2020. (Copy of both the orders are enclosed as Annexure-I & II) 2. M/s. Patnailk Minerals Pvt. Ltd. Prepared the mining plan along with progressive mine closure plan which was approved by Indian Bureau of mines vide letter no. MP/A/17-ORI/BHU/2020-21, dated 01.10.2022 approved for the period from 2020-21to 2024-25. 3. The total mine lease area is 390.317 ha out of which 382.437 ha is forest land , private land is 1.081 ha and Govt.non forest land is 6.799 ha. Stage-II Forest clearance granted vide F.No.8-93/2004-FC dated 18.08.2008 for diversion of 227.0 ha of forest land in favour of M/s Aryan Mining and Trading Corporation Ltd was transferred to M/s Patnaik Minerals Pvt. Ltd as per the provision of Mines and Minerals (Development and Regulation) Amendment Act, 2021 aligned with Forest Conservation Act ,1980. 4. (a) The Patnaik minerals Pvt. Ltd. submitted Form-I and PFR in the Parivesh portal vide proposal no. IA/OR/MIN/180360/2020 on 23.10.2020 for the above said production. Subsequently the MoEF & CC (IA division), Govt. of India granted TOR on dated 20th January,2021 vide letter no.J-110105/75/2020-IA.II (M). (b) The public hearing for the said production was conducted on 08.21.2021. (c) Post TOR final EIA/EMP along with form -2 was submitted on 15.05.2022 (d) The Project was appraised by the EAC on 15.06.2022, wherein the proposal was deferred for want of additional information. (e) The PP then submitted the replies to the above said queries on 25.08.2022 in Parivesh portal. Further the EAC asked for complete information, and the PP submitted the complete information on 22.09.2022 in Parivesh Portal. The proposal was reconsidered in the 5th EAC meeting on 18th October. (Agenda no. 3.2). Since the deliberation by the consultant was not continuous due to recurring poor connectivity, the EAC deferred the proposal. (f) During the 7th EAC conducted on 5th -6th December 2022,( Agenda no 2.2) the Committee deferred the proposal stating that the proposal may be considered only after the submission of the site visit report by a sub-committee constituted by The MoEF &CC , Govt. of India vide order dated 30.01.2023. (g) The proposal was again appraised during the 11th EAC meeting held during 1-2 March 2023 (Additional Agenda no 2.5) after the submission of report by EAC subcommittee after the field visit during 18-21 February 2023.The committee recommended to submit status of compliances to 21 points query. (h) The PP submitted the reply to the above 21 point queries. . The proposal was put for reconsideration during the 24th EAC (Non –coal mining) held during 26-28 December 2023 and the PP vide letter dated 12.12.2023 informed that they are not in a position to present the technical presentation and based on this, the proposal was deferred by the EAC. (g) The proposal was delisted on 5th April 2024. . 5. In between these, the lease of Mahulsukha Iron & Mn. Ore Block has been transferred in the name of M/s Rungta Sons Pvt. Ltd. vide proceedings no. 12975/SN dated 28.12.2023 of Steel & Mines Department, Govt. of Odisha under the provision of Mines and Minerals (Development and Regulation) Amendment Act, 2021. (Copy of the transfer deed and vesting order is enclosed as Annexure-III). In a sequel to the above, the present lessee intends to relay the aforementioned EC proposal further. For this purpose, we have obtained NOC from the former lessee ( M/s Patnaik minerals Pvt. Ltd) in the shape of an affidavit on 09.05.2024 that, they have no objection for transfer of the final EIA report prepared by them and the accredited consultant ( M/s Kalyani Laboratory Pvt. Ltd) and all other documents/proceedings of public hearings for expansion of the project in case these are being transferred in the name of M/s Rungta Sons Pvt. Ltd. and they have relinquished all claims/rights/ownership over the said document/proceedings in favour of M/s Rungta Sons Pvt. Ltd. (A copy of the affidavit is enclosed as Annexure-IV). Since the record of submission of the above said 21 points query, , we are submitting herewith the point wise compliances to the recommendations of the 11th EAC meeting (Non Coal Mining) held on 1-2 March 2023. We would therefore request your good self to kindly process the said application in our favour and grant Environment clearance for production of Iron Ore: total Excavation: 1662977 TPA, ROM: 10,00,000 MTPA, Manganese Ore: Total Excavation: 1407519 TPA, ROM: 150000 TPA from Mahulsukha Iron & Mn. Ore Block in favour of M/s. Rungta Sons Pvt. Ltd. over a lease area of 390.317 ha. in Village; Randa, Rantha & Bhutuda under Bonai Sub-Division & Lahunipara Tehsil of Sundargarh district, Odisha . Thanking you, Yours faithfully, 15 May 2024
2.NA

Deferred

05 Jan 2024
3. ADS Reply LetterSir, Please find herewith the attached compliance to ADS. 27 Nov 2023
4.NA

Deferred

13 Dec 2022
5. ADS Reply LetterWe are hereby submitting the compliance to ADS 15 Nov 2022
6.NA

Deferred

31 Oct 2022
7. ADS Reply LetterSir, We are submitting the Compliance to ADS as per the ADS raised for Mahulsukha Iron and Manganese ore mines. 22 Sep 2022
8.NA• The proposal was earlier considered in the 52nd EAC meeting (Non-Coal Mining) held during 14th -15th June, 2022 and the EAC deferred the proposal for want of additional information for 16 points. • The Project Proponent submitted the information for the 13 points only. PP is requested to submit complete information on Parivesh portal. 12 Sep 2022
9. ADS Reply LetterCompliance to ADS submitted 25 Aug 2022
10.NA

Deferred

21 Jun 2022
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSAROJ KUMAR PATNAIK
DesignationDIRECTOR
Name of Company (Applicant Name should not be given here)PATNAIK MINERALS PRIVATE LTD.
AddressAT/PO. BANEIKALA, JODA, KEONJHAR, ODISHA,758038
Print