| 1.  |  | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? |  No |   | Details of Project:  |     | (a)Name of the project(s) |  Mahulsukha Iron and Manganese Ore Block by Ms Patnaik Minerals Private Ltd. over an area of 390.317 Ha in village Randa, Rantha and Bhutunda under Bonai Sub-Division and Lahunipada Tahasil of Sundergarh District, Odisha of of M/s Patnaik Minerals Pvt. Ltd  |   | (b)Name of the Company / Organisation |  PATNAIK MINERALS PRIVATE LTD.  |   | (c)Registered Address |  AT/PO. BANEIKALA, JODA, KEONJHAR, ODISHA,758038,,Kendujhar,Orissa-758038  |   | (d)Legal Status of the Company |  Private  |   | (e)Joint Venture |   No  |      |  
  | 
| 2.  |  | Address for the correspondence:  |   | (a)Name of the Applicant  |  SAROJ KUMAR PATNAIK |   | (b)Designation (Owner/ Partner/ CEO)  |  DIRECTOR |   | (c)Address  |  AT/PO. BANEIKALA, JODA, KEONJHAR,ODISHA,758038,,Barbil,Kendujhar,Orissa-758038 |   | (d)Pin code  |  758038 |   | (e)E-mail  |  mahulsukhamines@rungtasons.com |   | (f)STD Code. |  6767(f)Telephone No. |  240105 |   | (g)Fax No.  |   |   | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency .  |  Annexure-Uploaded Copy of documents in support of the competence/authority |      |  
  | 
   | 3.  | | Category of the Project/Activity as per Schedule of EIA Notification,2006:  |  | (a.I)Project/Activity | 1(a) Mining of minerals
  |   | Minor Activity |  |   | (b)Category |  A  |    | (c)Proposal Number  |  IA/OR/MIN/180360/2020 |    | (d)Master Proposal Number(Single Window)  |  SW/272977/2022 |   | (e)EAC concerned (for category A Projects only) |  Non-Coal Mining  |   | (f)Project Type |  Fresh EC  |   
  |  
  | 
| 4.  |  | Location of the Project:  |  | (a)Plot/Survey/Khasra No. |  Khata no: 5,8,11,22,23,24,31,18,16,38,39,40 |   | (b)Pincode |  770040 |   | (c)Bounded Latitudes (North) |   |   | From |   |   | Degree |  21 |   | Minutes |  46 |   | Second |  52.12 |   | From |   |   | Degree |  21 |   | Minutes |  49 |   | Second |  04.55 |   | (d)Bounded Longitudes (East) |   |   | From |   |   | Degree |  85 |   | Minutes |  07 |   | Second |  55.43 |   | From |   |   | Degree |  85 |   | Minutes |  09 |   | Second |  10.42 |   | (e)Survey of India Topo Sheet No. |  73G/1 |   | (f)Uploaded Topo Sheet File |  Copy of Topo Sheet File |   | (g)Maximum Elevation Above Means Sea Level(AMSL) |  880 |   | (h)Uploaded (kml) File |  Copy of Kml File        |   | (i)Distance of Nearest HFL from the project boundary within the study area |  16 |   | (j)Seismic Zone |  3 |      |  
  | 
   | 5.  |  | (a)Number of States in which Project will be Executed |  1  |   | (b)Main State of the project |  Orissa  |     |  
  | 
   | 
| Details of State(s) of the project | 
|---|
 | S. No. |  State Name   |  District Name |  Tehsil Name   |  Village Name   | 
|---|
 | (1.) | Orissa | Sundargarh | Lahunipara | Randa, Rantha and Bhutunda |   | (2.) | Orissa | Sundargarh | Lahunipara | Randa, Rantha and Bhutuda |      | 
   | 
| 6.  |  | Details of Terms of Reference (ToR):  |  | (a)MoEF&CC / SEIAA File Number |  J-11015/75/2020-IA-II(M) |   | (b)Date of Apply of TOR |  03 Dec 2020 |   | (c)Date of Issue of TOR / Standard ToR |  20 Jan 2021 |   | (d)Previous TOR Letter |  Copy of Previous TOR letter |      |  
  | 
   | 7.  |  | Details of Public Consultation:  |  | (a)Whether the Project Exempted from Public Hearing? | No  |  | (b)Whether details of Public Hearing available? |  Yes  |   | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above |  Yes  |     |  
  | 
|      7.1.       Details of Public Hearing | 
|---|
 |
 | S. No. | Details of Advertisement  | Details of Public Hearing  | Venue  | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer | 
|---|
 | (1.) |  | | Copy of Public Hearing : | Copy of Public Hearing |   | Date : | 08 Oct 2021 |  | Distance of Public Hearing Venue from the Proposed Project : | 1 |  
  | Bhutuda Gram Panchayat office under Lahunipada Block of Sundargarh District | | State : | Orissa |  | District : | Sundargarh |  | Tehsil : | Lahunipara |  | Village : | Bhutuda |  
  | 97 | Impact on agriculture, supply of drinking water, transport facility, employment, Health facility | Others | Additional District Magistrate, Sundergarh |     | 
| 8.  |  | Details of Project Configuration/Product:  |     |  
  | 
|      8.1.       Project Configuration | 
|---|
 | S. No. | Plant/Equipment/Facility | Configuration | Remarks | 
|---|
 | (1.) | Shovel | 2.5 Cu.m | 3 Nos |  | (2.) | Rock Breaker | -- | 1 No |  | (3.) | Diesel Browser | -- | 2 Nos |  | (4.) | Mobile maintenance van | -- | 4 Nos |  | (5.) | Staff Bus | -- | 1 No |  | (6.) | Water tanker | 20 KL | 2 Nos |  | (7.) | Water Tanker | 10 KL | 2 Nos |  | (8.) | Shovel | 2.5 Cu.m | 2 Nos |  | (9.) | Loader | 2.5 Cu.m | 3 Nos |  | (10.) | Dumper | 20 T | 4 Nos |  | (11.) | Dumper | 35 T | 14 No |  | (12.) | Drill Machine | 100mm | 2 Nos |  | (13.) | Loaders | 1.5 Cu.m | 2 Nos |  | (14.) | Drill Machine | 85mm | 3 Nos |  | (15.) | Shovel | 3.2 Cu.m | 3 Nos |  | (16.) | Dozer | 400-440 HP | 1 No |  | (17.) | Crane | -- | 1 No. |  | (18.) | Excavator for Quick Dispatch System | 1 Cu.m | 3 Nos |  | (19.) | Grader | 120 HP | 1 Nos |     | 
|      8.2.       Product | 
|---|
 | S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product | 
|---|
 | (1.) | Manganese Ore | 150000 | Tons per Annum |  | Road,Rail |  |  | (2.) | Iron Ore | 1000000 | Tons per Annum |  | Road,Rail |  |  | (3.) | Area | 390.32 | Hectares |  | Road,Rail |  |     | 
   | 
| 9.  |  | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):  |  | Details Not Applicable |     |  
  | 
| 9.1.  |  | Details of Consent to Operate  |  | (i)Whether Consent to operate obtained ? |  Obtained  |   | (ii)Copies of all Consent to operate obtained since inception |  Copy of Consent to Operate |   | (iii)Date of Issue |  31 Mar 2022 |   | (iv)Valid Upto |  31 Mar 2023 |   | (v)File No. |  2948 |   | (vi)Application No. |  3183624 |   | (vii)Copy of Consent to operate valid as on date |  Copy of Consent to Operate |      |  
  | 
   | 
| 10.  |  | Project Cost:  |   | (a)Total Cost of the Project at current price level (in Crores) |  20  |   | (b) Funds Allocated for Environment Management (Capital) (in Crores) |  1.38  |   | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) |  2.4250  |   | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) |  0.29  |      |  
  | 
  | 11.  |  | Whether project attracts the General Condition specified in the Schedule of EIA Notification ?  |  No  |       |       |  
   | 12.  | | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ?  | No |      |       |  
| 13.  |  | Raw Material / Fuel Requirement:  |   | (a)Proposed quantity of raw material/fuel |  0  |   | (b)Existing quantity of raw material/fuel |   N/A  |   | (c)Total quantity of raw material/fuel |  0  |      |  
  | 
|     13.1.        Raw Material / Fuel Profile | 
|---|
 | S. No. | Raw Material / Fuel  | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage  | Other Type of Linkage  | Uploaded Copy of Linkage  | 
|---|
 | (1.) | Deisel | 9222 | Others | Cu.m per annum | Open market | Road |  | 25 |  Open Market |  | Copy of Linkage |  | (2.) | EXPLOSIVE | 95 | Tons per Annum |  | Trimurti Explosive | Road |  | 50 |  Linkage |  | Copy of Linkage |     | 
   | 
| 14.  |  | Baseline Data :  |  | (a)Period of Base Line Data Collection |  FROM 01 Dec 2020 To 28 Feb 2021 |   | (b)Season |  Winter |      |  
  | 
|     14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9 | 
|---|
 | S. No. | Criteria Pollutants  | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard | 
|---|
 | (1.) | PM10 |  | Micro Gram per Meter Cube | 69.3 | 33.6 | 68.9 | 100 |   | (2.) | NOx |  | Micro Gram per Meter Cube | 19.5 | 11.7 | 18.3 | 80 |   | (3.) | Others | CO | Mili Gram per Meter Cube | 0.4 | 0.1 | 0.4 | 4 |   | (4.) | PM2.5 |  | Micro Gram per Meter Cube | 32.5 | 16.7 | 32.4 | 60 |   | (5.) | SO2 |  | Micro Gram per Meter Cube | 11.5 | 4.3 | 10.9 | 80 |      | 
|     14.2.     No. of Ground Water monitoring locations : 7 | 
|---|
 | S. No. | Criteria Pollutants  | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit | 
|---|
 | (1.) | pH |  |  | NA |  | 7.5 | 6.9 | 6.5 | 8.5 |  | (2.) | Total Hardness |  |  | mg/l |  | 180 | 44 | 200 | 600 |  | (3.) | Others | Alkalinity |  | mg/l |  | 108 | 19 | 200 | 600 |  | (4.) | Heavy Metals |  | Mercury | mg/l |  | 0 | 0 | 0 | 0 |  | (5.) | TSS |  |  | mg/l |  | 0 | 0 | 0 | 0 |  | (6.) | Chlorides |  |  | mg/l |  | 10 | 2 | 250 | 1000 |  | (7.) | Fluoride |  |  | mg/l |  | 0.05 | 0 | 1.0 | 1.5 |  | (8.) | TDS |  |  | mg/l |  | 220 | 50 | 500 | 2000 |     | 
|     14.3.     No. of Surface Water monitoring locations : 9 | 
|---|
 | S. No. | Criteria Pollutants  | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body | 
|---|
 | (1.) | pH |  | NA |  | 7.45 | 7.0 | C |   | (2.) | Others | Total Coliform | Others | MPN/100ml | 50 | 11 | C |   | (3.) | DO |  | mg/l |  | 7.5 | 6.4 | C |   | (4.) | BOD |  | mg/l |  | 2 | 2 | C |   | (5.) | COD |  | mg/l |  | 5 | 5 | C |      | 
|     14.4.     No. of Ambient Noise monitoring locations : 9 | 
|---|
 | S. No. | Parameter  | Unit | Maximum Value | Minimum Value | Prescribed Standard | 
|---|
 | (1.) | Leq(Day) | A-weighted decibels(dB(A)) | 55.2 | 30.8 | 75 |   | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 43.6 | 24.6 | 70 |      | 
|     14.5.     No. of Soil Sample Monitored locations : 9 | 
|---|
 | S. No. | Parameter  | Unit | Other Unit | Maximum Value | Minimum Value | 
|---|
 | (1.) | P(Phosphorus) | Kilogram per hectare |  | 82 | 12.5 |  | (2.) | N(Nitrogen) | Kilogram per hectare |  | 339 | 151 |  | (3.) | K(Potassium) | Kilogram per hectare |  | 430 | 202 |  | (4.) | Electric Conductivity | Millisiemens per Centimetre |  | 0.11 | 0.04 |  | (5.) | pH |  |  | 6.9 | 6.1 |     | 
   | 
| 14.6.  |  | Details of Ground Water Table:  |  | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) |   From 16 To 20 |   | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) |   From 10 To 14 |   | (c)Whether Ground Water Intersection will be there ? |  No |      |  
  | 
|      15.      Details of Water Requirement (During Operation) | 
|---|
 | S. No. | Source  | Source Other  | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority  | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity | 
|---|
 | (1.) | GroundWater |  | 84 | 2 | Copy of Permission Letter | Pipeline |  | Others | Bore well | CGWA/NOC/IND/ORIG/2022/15067 | 09 Apr 2022 | 84 |  | (2.) | Surface |  | 64 | 2 | Copy of Permission Letter | modeOthers | Tanker | Others | Rain water harvesting | Nil | 05 May 2022 | 84 |     | 
   | 
| 15.1.  |  | (a)Whether Desalination is proposed |  No |      |  
  | 
|     16.       Waste Water Management(During Operation) | 
|---|
 | S. No. | Type/Source  | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day)	 | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged  Water (Kilolitre per Day) | 
|---|
 | (1.) | 0 | 0 | 0 | 0 | Green Belt Renewal Plant |  | 0 |  |      | 
   | 
| 16.1.  |  | (a)Total Waste Water Generation (Kilolitre per Day) |  0 |   | (b)Total Discharged Water (Kilolitre per Day) |  0 |   | (c)Total Reused Water (Kilolitre per Day) |  0 |      |  
  | 
|     17.       Solid Waste Generation/Management | 
|---|
 | S. No. | Name of Waste  | Item  | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal | 
|---|
 | (1.) | Over burden and insitu waste | Others | Waste from Iron ore Zone | 994446 | Tons | 1 | Road |  | Others | Dumping, Backfilling and road maitenance |   | (2.) | Overburden and insitu waste | Others | Waste from Manganeseore Zone | 1571880 | Tons | 1 | Road |  | Others | Dumping, Backfilling and road maitenance |      | 
   | 
 | 
|     18.1.     Air Quality Impact Prediction | 
|---|
 | S. No. | Criteria Pollutants  | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard | 
|---|
 | (1.) | NOx |  | Microgram per Meter Cube | 18.3 | 1 | 0 | 18.3 | 80 |   | (2.) | SO2 |  | Microgram per Meter Cube | 11.5 | 1 | 0 | 11.5 | 80 |   | (3.) | PM10 |  | Microgram per Meter Cube | 68.9 | 1 | 2.58 | 71.48 | 100 |   | (4.) | PM2.5 |  | Microgram per Meter Cube | 32.5 | 1 | 0 | 32.5 | 60 |      | 
   | 
|     18.2.     Stack Details | 
|---|
 | S. No. | Source  | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) | 
|---|
 | (1.) | 0 | 0 | 0 | 0 | PM10 |  | 0 |      | 
   | 
| 19.  |  | Power Requirement:  |  | (a)Quantity (Kilo Volt Amps (kVA)) |  63 |   | (b)Source |  WESCO |   | (c)Uploaded Copy of Agreement |  Copy of Agreement |   | (d)Standby Arrangement (Details of DG Sets) |  DG Set 30 KVA |   | (e)Stack Height (in m) |  1.5 |      |  
  | 
| 20.  |  | Land Ownership Pattern:  |  | (a)Forest Land (ha.) |  382.437 |   | (b)Private Land (ha.) |  1.081 |   | (c)Government Land (ha.) |  6.799 |   | (d)Revenue Land (ha.) |  0 |   | (e)Other Land (ha.) |  0 |   |     Total Land (ha.) |  390.317 |      |  
  | 
| 21.  |  | Present Land Use Breakup of the Study Area in Ha:  |  | (a)Agriculture Area (ha.) |  5182.53 |   | (b)Waste/Barren Land (ha.) |  15895 |   | (c)Grazing/ Community Land (ha.) |  0 |   | (d)Surface Water Bodies (ha.) |  70.59 |   | (e)Settlements (ha.) |  28.3 |   | (f)Industrial (ha.) |  705 |   | (g)Forest (ha.) |  21370.8 |   | (h)Mangroves (ha.) |  0 |   | (i)Marine Area (ha.) |  0 |   | (j)Others (ha.) : Nil  |  0 |   |     Total  (ha.) |  43252.2200 |      |  
  | 
|     22.     Land requirement for various activities | 
|---|
 | S. No. | Description of Activity / Facility / Plant / Others  | Others | Land Requirement (ha.) | Remarks | 
|---|
 | (1.) | Quarry Area |  | 112.39 | -- |  | (2.) | OB Dump Area |  | 21.094 | -- |  | (3.) | Area for Solid Waste Management |  | 29.854 | Top Soil and mineral storage |  | (4.) | Built Up Area |  | 17.7 | Road and infrastructure |  | (5.) | Green belt |  | 52.9 | -- |  | (6.) | Others | Other land use | 156.379 | Settling tank, RWH, Untouched area |     | 
 | 
   | 
| 23.  |  | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :  |     |  
  | 
|     23.1.     Details of Ecological Sensitivity :  | 
|---|
 | S. No. | Details of Ecological Sensitivity  | Name | Distance from the Project (Km) | Remarks | 
|---|
 | (1.) | Critically Polluted Area | Nil | 0 | No Critically polluted area located within 10 Km radius |  | (2.) | WLS | Nil | 0 | No WLS exists within 10 Km radius |  | (3.) | NPA | Nil | 0 | No NPAs present within 10 Km radius |  | (4.) | ESAs | Nil | 0 | No ESAs exists within 10 Km radius |  | (5.) | ESZs | Nil | 0 | No ESZs exists within 10 Km radius |  | (6.) | Corridors | Nil | 0 | No Corridors exists within 10 Km radius |  | (7.) | Wildlife Corridors | Nil | 0 | No wildlife corridors exists withon 10 Km radius |     | 
|     23.2.     Details of Environmental Sensitivity :  | 
|---|
 | S. No. | Details of Environmental Sensitivity  | Other Details of Environmental Sensitivity  | Name | Distance from the Project (Km) | Remarks | 
|---|
 | (1.) | Forest |  | Sarkanda PF | 0 | Lease area is the part of Sarkanda PF |  | (2.) | Archaeological Sites |  | Nil | 0 | No archeological site exists within 10 Km |  | (3.) | Defence Installations |  | Nil | 0 | No Defense installation exists within 10 Km |     | 
   | 
| 23.3.  |  | (a)Whether Noc / Permission from the competent authority is required?  |  No |   | (b)Whether NBWL recommendation is required?  |  No |      |  
  | 
| 24.  |  | Forest Land:  |  | Whether any Forest Land involved? |  Yes |   | (a)Forests Clearance Status |  Under Process(Stage-II) |   | (b)Legal Status of Forest Land |  Protected |      |  
  | 
| 25.  |  |  Tree Cutting:  |  | (a)No. of Trees Cut for the Project (if Forest Land not Involved) |  0 |   | (b)Details of Tree Cutting and Planting of Trees |  Not Applicable |      |  
  | 
| 26.  |  | Land Acquisition Status:  |  | (a)Acquired Land(Ha) |  390.32 |   | (b)Land yet to be acquired(Ha) |  0 |   | (c)Status of Land acquisition if not acquired |  0 |      |  
  | 
| 27.  |  |  Rehabilitation and Resettlement (R&R):  |  | (a)No. of Villages |   |   | (b)No. of Households |   |   | (c)No. of PDFs (Project Displaced Families) |   |   | (d)No. of PAFs (Project Affected Families) |   |   | (e)Funds Allocated for R&R(in INR) (in Lacs) |   |   | (f)Status of R&R |  NA |      |  
  | 
| 28.  |  |  Details of Presence of Schedule-I Species:  |  | (a)Whether there is Presence of Schedule-I Species ?  |  Yes |   | (i)Details of Schedule-I Species  |  One schedule I fauna found in core zone and 6 Schedule I fauna found in buffer zone |   | (b)Whether conservation plan for Schedule-I Species has been prepared ?  |  Yes |   | (i)Uploaded copy of conservation plan |  Copy of conservation plan |   | (ii)Fund Provision made  |  515.52 lakhs |   | (iii)Period of Implementation  |  10 Years |   | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ?  |  No |      |  
  | 
| 29.  |  |  Details of Presence of Water Bodies in Core Area:  |  | (a)Whether there is Presence of Water Bodies in Core Area ?  |  Yes |   | (i)Details of Water Bodies in Core Area  |  Bhutuda nala flows within the lease area |   | (b)Whether there is Diversion Required ?  |  No |   | (c)Whether permission has been obtained from competent authority ?  |  No |      |  
  | 
| 30.  |  |  Details of Presence of Water Bodies in Buffer Area:  |  | (a)Whether there is Presence of Water Bodies in Buffer Area ?  |  Yes |   | (i)Details of Water Bodies in Buffer Area  |  Kurarhi Nala |   | (ii)Direction of Water Bodies in Buffer Area  |  North |   | (iii)Distance of Water Bodies in Buffer Area  |  0.5 |      |  
  | 
| 31.  |  |  Manpower Requirement:  |  | (a)Permanent Employment-During Construction  |  0 |   | (b)Permanent Employment-During Operation  |  304 |   | (c)Temporary Employment- During Construction  |  100 |   | (d)Temporary Employment- During Operation  |  596 |   | (e)No. of working days  |  300 |   | (f)Total Manpower  |  1000 |      |  
  | 
| 32.  |  |  Green Belt in Ha:  |  | (a)Total Area of Green Belt  |  70.17 |   | (b)Percentage of Total Project Area  |  17.98 |   | (c)No. of Plants to be Planted  |  196746 |   | (d)Funds Allocated for Plantation  |  200000 |   | (e)Uploaded Green Belt plan |  Copy of Green Belt Plan |      |  
  | 
|     33.         Project Benefits | 
|---|
 | S. No. | Type of Project Benefits  | Details of Project Benefits  | 
|---|
 | (1.) | Environmental | Water sprinkling for dust supression, Plantation, Protection of Nala |  | (2.) | Social | Peripheral Developmental activities includes health, education, drinking water supply, solar light etc. |  | (3.) | Financial | Employment generation for the local people |     | 
   | 
 |    34.   CRZ Specific Details : Not Applicable  | 
 |    35.   Sector Specific Details For Non-Coal Mining  | 
 | 
|      1.       No. of Mineral(s) to be Mined : 2 | 
|---|
 | S. No. | Mineral(s) to be Mined  | Major or Minor Mineral | 
|---|
 | (1.) | Iron Ore | Major |   | (2.) | Manganese Ore | Major |      | 
   | 
| 2.  |  | Mine Capacity in ROM (Run of Mine)  |  1150000 |      |  
  | 
 | 
| 4.  |  | Mining Plan: |  | (a)Approval Letter No.  |  MP/A/17-ORI/BHU/2020-21 |   | (b)Date of Approval  |  01 Oct 2020 |   | (c)Approved Letter |  Copy of Approved Letter |   | (d)Approved By State Mining and Geology Department |  IBM |   | (e)Approved Mining Lease Area  |  390.317 |   | (f)Approved Capacity |  1150000 |      |  
  | 
| 5.  |  | Technical Details: |  | (a)Total Geological Reserves (Million Ton)  |  33.54 |   | (b)Mineable Reserves (Million Ton)   |  27.45 |   | (c)Extractable Reserves(Million Ton)  |  27.45 |   | (d)Percent(%) of Extraction  |  100 |   | (e)Grade of Coal /Ore /Mineral  |  +55% Fe - Iron Ore; +35% Mn - Manganese Ore |   | (f)Stripping Ratio |  1 : 6 |   | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) |  NA |   | (h)Average Gradient(Degree) |  31 |   | (i)Mining Method |  Opencast |   | (j)Life of Mine (Years) |  Iron ore  - 29 years; Manganese Ore - 7 Years |      |  
  | 
| 6.  |  | Details of Beneficiations: |  | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area  |  No |   | (b)Whether it is proposed to install crusher within the mining lease area |  No |      |  
  | 
| 7.  |  | Details of Seams: |  | (a)Whether details of seam applicable  |  No |      |  
  | 
| 8.  |  | Details of Mining Lease: |  | (a)Mining Lease Area (in Hectare)  |  390.317 |   | (b)Whether obtained Letter of Intent (LOI) from the state government ? |  Yes |   | (i)Copy of Letter of Intent |  Copy of Letter of Intent |   | (ii)Date of issue of LOI |  18 Mar 2020 |   | (iii)Validity of LOI |  50 |   | (iv)Reference No. of LOI |  3013/SM, Bhubaneswar |   | (c)Whether Lease Deed Executed  ? |  Yes |   | (i)Copy of Executed Lease deed valid as on Date |  Copy of Executed Lease deed |   | (ii)Provide area in Hectare as per executed lease deed (initial) document |  390.317 |   | (iii)Validity of the lease deed |  From : 29 Jun 2020 To : 28 Jun 2070 |   | (iv)Date of Execution of Mining Lese |  29 Jun 2020 |   | (v)Reference Number |  IN-OD01084308552938S |   | (d)Whether Lease Deed Renewed  ? |  No |   | (i)Reason thereof |  New Auctioned Mines |      |  
  | 
| 9.  |  | OB (Over Burden) Management: |  | (a) Details of External Dumps: |  | (i)No. of OB Dumps |  6 |   | (ii)Total Area (in Hectare) |  21.094 |   | (iii)Height (in meter) |  20 |   | (iv)Quantity (in Million Cubic meter) |  1.80 |   | (v)No. of year back fill up |  5 |   | (b) Details of Internal Dumps: |  | (i)No. of Internal Dumps  |  0 |   | (ii)Total Area (in Hectare) |  0 |   | (iii)Height (in meter) |  0 |   | (iv)Quantity (in Million Cubic meter) |  0 |      |  
  | 
| 10.  |  | Details of Topsoil Management: |  | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) |  0 |   | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) |  0 |   | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) |  0 |      |  
  | 
| 11.  |  | Details of Final Mine Void: |  | (a)Area (in Hectare) |  89.308 |   | (b)Depth (in meter) |  60 |   | (c)Volume (in Million Cubic meter) |  10.41 |      |  
  | 
| 12.  |  | Details of Quarry: |  | (a)Final Void of 0 (hectare) at a Depth of 0  meter which is Proposed to be Converted into a Water Body. |   | (b)Total Quarry Area (ha) |  0 |      |  
  | 
| 13.  |  | Details of Transportation: |  | (a)In Pit/Underground to Surface |  Mining pit to surface |   | (b)Surface to Siding/Loading |  Loading will be done by excavators and loaders |   | (c)Transportation / Conveyor Details |  Transported through Trucks/ Dumper |      |  
  | 
   | 
|      14.      Details of Land Usage (Pre-Mining) | 
|---|
 | S. No. | LAND USE  | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) | 
|---|
 | (1.) | FOREST LAND |  | 382.437 | 0 | 382.437 |   | (2.) | WASTE LAND |  | 6.799 | 0 | 6.799 |   | (3.) | AGRICULTURE LAND |  | 1.081 | 0 | 1.081 |   | (4.) | GRAZING LAND |  | 0 | 0 | 0 |   | (5.) | SETTLEMENTS |  | 0 | 0 | 0 |   | (6.) | SURFACE WATER BODIES |  | 0 | 0 | 0 |   |
 TOTAL | 390.317 | 0 | 390.317 |    | 
   | 
|      15.      Details of Land Usage (Post-Mining) | 
|---|
 | S. No. | LAND USE  | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total | 
|---|
 | (1.) | ROADS |  | 0 | 0 | 12.2 |  | 12.2 |   | (2.) | BUILT UP AREA (COLONY/OFFICE) |  | 0 | 0 | 5.5 |  | 5.5 |   | (3.) | TOP SOIL STORAGE |  | 1.05 | 0 | 0 |  | 1.05 |   | (4.) | EXTERNAL OB DUMPS |  | 21.094 | 0 | 0 |  | 21.094 |   | (5.) | GREEN BELT |  | 52.9 | 0 | 0 |  | 52.9 |   | (6.) | EXCAVATION/QUARRY |  | 112.39 | 0 | 0 |  | 112.39 |   | (7.) | VIRGIN AREA |  | 155.749 | 0 | 0 |  | 155.749 |   | (8.) | INTERNAL OB DUMPS |  | 0 | 0 | 0 |  | 0 |   | (9.) | Other | Mineral storage & Settling tank | 29.434 | 0 | 0 |  | 29.434 |   |
 TOTAL | 372.617 | 0 | 17.7 | 0 | 390.317 |    | 
| 16.  |  |  Details of Reclamation:  |  |  Total Afforestation Plan shall be Implemented Covering of Mining.This will Include:  |  | (a)External OB Dump(in hectare) |  21.094 |   | (b)Internal Dump(in hectare) |  0 |   | (c)Quarry(in hectare) |  112.39 |   | (d)Safety Zone(in hectare) |  52.9 |   | (e)Final Void of 0 (hectare) at a Depth of 0  meter which is Proposed to be Converted into a Water Body. |   | (f)Density of Tree Plantation per ha (in no.) |  2500 |   | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) |  0 |   | (h)Total afforestation plant (in hectare) |  372.615 |      |  
  | 
| 17.  |  | Status of progressive Mining Closure Plan: |  | Details Not Applicable |     |  
  | 
|      18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: | 
|---|
 | S. No. | Financial Year  | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production  | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) | 
|---|
 | (1.) | 2021 | 0.04 | 0.04 | 1.15 | 0.04 | 0 |      | 
 | 
| 36.  |  |  Details of Court Cases:  |  | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ?  |  No |      |  
  | 
| 37.  |  |  Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:  |  | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ?  |  No |      |  
  | 
| 38.  |  |  Details of EIA Consultant:  |  | (a)Have you hired Consultant for preparing document?  |  Yes |   | (i)Accreditation No. |  NABET/EIA/2023/SA0149 |   | (ii)Name of the EIA Consultant |  Kalyani Laboratories Private Limited |   | (iii)Address |  Plot. no. 78/944, Millenium city, Pahala, Bhubaneswar |   | (iv)Mobile No. |  9437306091 |   | (v)Landline No. |  0674297504 |   | (vi)Email Id |  kalyanilab@yahoo.co.in |   | (vii)Category of Accreditation |  A |   | (viii)Sector of Accreditation |  Non-Coal Mining |   | (ix)Validity of Accreditation |  02 Mar 2023 |   | (x)Uploaded Certificate of Accreditation certified by QCI/NABET  |  Copy of Certificate of Accreditation |      |  
  | 
 | 
 |       Essential Detail Sought : NIL  | 
|             Additional Detail Sought: | 
|---|
 |  Sno.  |  ADS Letter  |  Remarks |  Date of ADS | 
|---|
 | 1. |  ADS Reply Letter | Sir,
This has reference to the online proposal stated above for expansion of Mahulsukha Iron & Mn. Ore Block by M/s. Rungta Sons Pvt. Ltd. over an area of 390.317 ha.(as per DGPS) /399.838 ha. (As per ROR) in Villages; Randa, Rantha & Bhutuda under Bonai Sub-Division & Lahunipara Tehsil of Sundargarh district, Odisha. In this context, we would like to bring the followings to your kind perusal  that;
1.	The Mining lease of Mahulsukha Iron & Manganese block is an auction mine vested to M/s Patnaik Minerals Pvt. Ltd. from M/s Aryan Mining & Trading Corporation Ltd.  The Govt. of Odisha vide Letter NO.4246/IV(B)SM-23/2020/SM dated 30.05.2020 issued orders vesting all the valid rights, approvals, cleare3nces, licenses and the like  vested in the previous lessee in favour of M/s Patnaik minerals Pvt. Ltd.. Then, the Govt. Of Odisha vide Order No. 5518/IV(B)SM-23/2020/SM dated 29.06.2020 granted mining lease for Iron & Manganese ore in favour of M/s Patnaik Minerals Pvt. Ltd for  Mahulsukha Iron & Manganese Ore block over an area  of 390.317(as per DGPS)/399.838ha ( as per ROR) for a period of 50 years and accordingly mining lease deed was executed on 29.06.2020. (Copy of both the orders are enclosed as Annexure-I & II)
2.	M/s. Patnailk Minerals Pvt. Ltd. Prepared the mining plan along with progressive mine closure plan which was approved by Indian Bureau of mines vide letter no. MP/A/17-ORI/BHU/2020-21, dated 01.10.2022 approved for the period from 2020-21to 2024-25. 
3.	The total mine lease area is 390.317 ha out of which 382.437 ha is forest land , private land is 1.081 ha and Govt.non forest land is 6.799 ha. Stage-II Forest clearance granted vide F.No.8-93/2004-FC dated 18.08.2008 for diversion of 227.0 ha of forest land in favour of M/s Aryan Mining and Trading Corporation Ltd was transferred to M/s Patnaik Minerals Pvt. Ltd as per the provision of Mines and Minerals (Development and Regulation)  Amendment Act, 2021 aligned with Forest Conservation Act ,1980. 
4.	 (a) The Patnaik minerals Pvt. Ltd. submitted Form-I and PFR in the Parivesh portal vide proposal no. IA/OR/MIN/180360/2020 on 23.10.2020 for  the above said production. Subsequently the MoEF & CC   (IA division), Govt. of India granted TOR on dated 20th January,2021  vide letter no.J-110105/75/2020-IA.II (M). 
(b) The public hearing for the said production was conducted on 08.21.2021.
(c) Post TOR final EIA/EMP along with form -2 was submitted on 15.05.2022 
(d) The Project was appraised by the EAC on 15.06.2022, wherein the proposal was deferred for want of additional information. 
(e) The PP then submitted the replies to the above said queries on 25.08.2022 in Parivesh portal. Further the EAC asked for complete information, and the PP submitted the complete information on 22.09.2022 in Parivesh Portal. The proposal was reconsidered in the 5th EAC meeting on 18th October. (Agenda no. 3.2). Since the deliberation by the consultant was not continuous due to recurring poor connectivity, the EAC deferred the proposal. 
(f) During the 7th EAC conducted on 5th -6th December 2022,( Agenda no 2.2) the Committee deferred  the proposal stating that the proposal may be considered only after the submission of the site visit report by  a  sub-committee constituted by The MoEF &CC , Govt. of India vide order dated 30.01.2023. 
(g) The proposal was again appraised during the 11th EAC meeting held during 1-2 March 2023 (Additional Agenda no 2.5) after the submission of report by EAC subcommittee after the field visit during 18-21 February 2023.The committee recommended to submit status of compliances  to 21 points query. 
(h)   The PP submitted the reply to the above 21 point queries.  . The proposal was put for reconsideration during the 24th EAC (Non –coal mining) held during 26-28 December 2023 and the PP vide letter dated 12.12.2023 informed that they are not in a position to present the technical presentation and based on this, the proposal was deferred by the EAC.  
(g) The proposal was delisted on 5th April 2024.  . 
5.	In between these, the lease of Mahulsukha Iron & Mn. Ore Block has been transferred in the name of M/s Rungta Sons Pvt. Ltd. vide proceedings no. 12975/SN dated 28.12.2023 of Steel & Mines Department, Govt. of Odisha under the provision of  Mines and Minerals (Development and Regulation)  Amendment Act, 2021. (Copy of the transfer deed and vesting order is enclosed as Annexure-III).
In a sequel to the above, the present lessee intends to relay   the aforementioned EC proposal further. For this purpose,  we have obtained NOC from the former lessee ( M/s Patnaik minerals Pvt. Ltd) in the shape of an affidavit on 09.05.2024 that, they have no objection for transfer of the final EIA report prepared by them and the accredited consultant ( M/s Kalyani Laboratory Pvt. Ltd)  and all other documents/proceedings of public hearings for expansion of the project in case these are being transferred in the name of M/s Rungta Sons Pvt. Ltd. and they have relinquished all claims/rights/ownership over the said document/proceedings in favour of M/s Rungta Sons Pvt. Ltd. (A copy of the affidavit is enclosed as Annexure-IV).
Since the record of submission of the above said 21 points query, , we are submitting herewith the point wise compliances to the recommendations of the 11th EAC meeting (Non Coal Mining) held on 1-2 March 2023. 
We would therefore request your good self to kindly process the said application in our favour and grant Environment clearance for production of Iron Ore: total Excavation: 1662977 TPA, ROM: 10,00,000 MTPA, Manganese Ore: Total Excavation: 1407519 TPA, ROM: 150000 TPA from Mahulsukha Iron & Mn. Ore Block in favour of  M/s. Rungta Sons Pvt. Ltd. over a lease area of 390.317 ha. in Village; Randa, Rantha & Bhutuda under Bonai Sub-Division & Lahunipara Tehsil of Sundargarh district, Odisha . 
Thanking you,   
       
Yours faithfully,  | 15 May 2024  |  | 2. | NA | Deferred   | 05 Jan 2024  |  | 3. |  ADS Reply Letter | Sir,
Please find herewith the attached compliance to ADS.  | 27 Nov 2023  |  | 4. | NA | Deferred   | 13 Dec 2022  |  | 5. |  ADS Reply Letter | We are hereby submitting the compliance to ADS  | 15 Nov 2022  |  | 6. | NA | Deferred   | 31 Oct 2022  |  | 7. |  ADS Reply Letter | Sir, We are submitting the Compliance to ADS as per the ADS raised for Mahulsukha Iron and Manganese ore mines.  | 22 Sep 2022  |  | 8. | NA | •	The proposal was earlier considered in the 52nd EAC meeting (Non-Coal Mining) held during 14th -15th June, 2022 and the EAC deferred the proposal for want of additional information for 16 points.
•	The Project Proponent submitted the information for the 13 points only.
PP is requested to submit complete information on Parivesh portal.  | 12 Sep 2022  |  | 9. |  ADS Reply Letter | Compliance to ADS submitted  | 25 Aug 2022  |  | 10. | NA | Deferred   | 21 Jun 2022  |     | 
   |     |   Undertaking  |  
  |  I hereby give undertaking that the data and information given in the application   and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the  project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.   In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. | 
 
 |   |  | Name of Applicant | SAROJ KUMAR PATNAIK |  | Designation | DIRECTOR |  | Name of Company (Applicant Name should not be given here) | PATNAIK MINERALS PRIVATE LTD. |   | Address | AT/PO. BANEIKALA, JODA, KEONJHAR, ODISHA,758038 |  
  |