Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Maliparbat Bauxite Mine of M/s Hindalco Industries Ltd for a Production Capacity of 0.6 MTPA over an Mining Lease Area of 268.110 ha at Aligaon, Kankaramba, Sorishpadar Village, Pottangi Tehsil, Koraput District, Odisha
(b)Name of the Company / Organisation HINDALCO INDUSTRIES LIMITED
(c)Registered Address Ahura Centre, 1st Floor, B -Wing, Mahakali Caves Road, Andheri (East), Mumbai-400093,,Koraput,Orissa-400093
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Pratap Kumar Patra
(b)Designation (Owner/ Partner/ CEO) Agent Maliparbat Mines
(c)Address Mines Division, 42/1041, Satya Nagar, College Road, Semiliguda, Koraput, Odisha,,Similiguda,Koraput,Orissa-764036
(d)Pin code 764036
(e)E-mail pratap.patra@adityabirla.com
(f)STD Code. 22(f)Telephone No. 225026
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/OR/MIN/250275/2020
(d)Master Proposal Number(Single Window) SW/250252/2022
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 367/P, 368/P,372/P, 375/P, 376/P,379/P, 380/P, 381
(b)Pincode 764036
(c)Bounded Latitudes (North)
From
Degree 18
Minutes 38
Second 32.810
From
Degree 18
Minutes 40
Second 28.384
(d)Bounded Longitudes (East)
From
Degree 82
Minutes 53
Second 22.815
From
Degree 82
Minutes 55
Second 50.244
(e)Survey of India Topo Sheet No. 65J/13,65J/14,65N/2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1403
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 4.2
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaKoraputPottangiAligaon, Kankaramba, Sorishpadar Village
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11015/79/2020-IA.II(M)
(b)Date of Apply of TOR 28 Dec 2020
(c)Date of Issue of TOR / Standard ToR 08 Feb 2021
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :19 Oct 2021
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :22 Nov 2021
Distance of Public Hearing Venue from the Proposed Project :3.0
Khata No. 27, Plot No. 40 (P) in Kankaramba village under Semiliguda tehsil, Koraput district
State :Orissa
District :Koraput
Tehsil :Pottangi
Village :Kankaramba
115Protection of air and water environment, employment, development of education facilities etcOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Crusher200TPH
(2.)Weigh bridge50 T1
(3.)Road grader200 HP1 no.
(4.)Repair and maintenance Van3 t1 No. for miscellaneous activities
(5.)Bauxite Mine0.6MTPA
(6.)DTH drill for drilling100 mm1 No
(7.)Bull Dozer (Crawler mounted)275 HP1 No
(8.)Water Tanker8 KL2 No.s for miscellaneous activities
(9.)Jack Hammers for drilling32 mm2 No.s
(10.)Compressor for drilling100 Cfm1 No.
(11.)Compressor for drilling450 cfm1 No.
(12.)Excavator for excavation and loading1.2 m33 no.s
(13.)Bull dozer for excavation & loading275 HP1 No
(14.)Wheel loader1.7 m32
(15.)Diesel tanker8 KL1 No. for miscellaneous activities
(16.)Explosive van8 t1 No for miscellaneous activities
(17.)ANFO mixing and loading truck10 t1 no. for miscellaneous activities
(18.)Mobile crane-1 No.s for miscellaneous activities
(19.)Fire Tender-1 No.
(20.)DG sets (tower mounted)100 KVA2 No.s for miscellaneous activities
(21.)Rock breaker for breaking125 tph2
(22.)Bull dozer for excavation & loading200 HP1
(23.)Tippers for transportation10 T17 No.s
(24.)Good transportation truck10 t1 No. for miscellaneous activities
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Bauxite Mine0.6OthersMTPARoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? Obtained
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 27 Mar 2021
(iv)Valid Upto 31 Mar 2022
(v)File No. 3833/IND-I-CON-5437
(vi)Application No. 2824875
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 23.72
(b) Funds Allocated for Environment Management (Capital) (in Crores) 3.79
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.53
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.2
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)EXPLOSIVE55473OtherskgDomesticRoad100 LinkageCopy of Linkage
(2.)Diesel660000OthersLitresDomesticRoad20 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2020 To 31 Dec 2020
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube30.912.830.660
(2.)PM10Micro Gram per Meter Cube87.728.887.4100
(3.)NOxNano Gram per Meter Cube46.76.346.680
(4.)SO2Micro Gram per Meter Cube28.36.128.380
(5.)OthersCOMicro Gram per Meter Cube8391268312000
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l296.3187.73200600
(2.)Fluoridemg/l0.70.41.01.5
(3.)OthersCalciummg/l69.818.375200
(4.)TSSmg/l0000
(5.)TDSmg/l693.31725002000
(6.)Chloridesmg/l178.640.82501000
(7.)Heavy MetalsArsenicmg/l0.010.010.050.01
(8.)pHNA7.627.066.58.5
    14.3.     No. of Surface Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.566.82B
(2.)CODmg/l54.9B
(3.)OthersCalciummg/l12.88.6A
(4.)DOmg/l6.25.6A
(5.)BODmg/l32.9C
    14.4.     No. of Ambient Noise monitoring locations : 11
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))58.932.145
(2.)Leq(Day)A-weighted decibels(dB(A))66.338.155
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.245.74
(2.)N(Nitrogen)Kilogram per hectare173.285.4
(3.)P(Phosphorus)Kilogram per hectare46.828.9
(4.)K(Potassium)Kilogram per hectare214.8108.4
(5.)Electric ConductivityOthersmicrosiemens per centimeter16438
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3 To 7
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.5 To 4.6
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface613.7Copy of Permission LettermodeOthersBy tankersWeirDB-17411 Jan 202161
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic710Oil Grease CatchersOthersGrenbelt70
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 7
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 7
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Top soil in m3OthersTop soil10300Tons0RoadOthersBackfilling
(2.)Overburden in m3OthersOverburden21500Tons0RoadOthersDumping and backfilling
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube14.20.274.9119.1160
(2.)PM10Microgram per Meter Cube50.10.2716.466.5100
(3.)NOxMicrogram per Meter Cube9.50.012.7212.380
(4.)SO2Microgram per Meter Cube7.40.016.291480
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG setDiesel300.5PM100.002
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 145
(b)Source DG sets of 45 kVA and 100 kVA
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2 DG sets of 45 kVA and 100 kVA
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 268.110
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 268.110
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 14940
(b)Waste/Barren Land (ha.) 21331
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1909
(e)Settlements (ha.) 2158
(f)Industrial (ha.) 249
(g)Forest (ha.) 871.5
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Nil 0
    Total (ha.) 41458.5000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Township0
(2.)OB Dump Area1.420
(3.)Water Reservoir0.138
(4.)Main Plant0
(5.)Safety Zone9
(6.)Ash Pond0
(7.)Desalination Plant0
(8.)Built Up Area0
(9.)Green belt8.350
(10.)LandFill0
(11.)Area for Solid Waste Management0
(12.)Quarry Area1.70At the end of mine area under mining is 109 ha
(13.)OthersBalance area247.502Balance area included final quarry area of 109 ha
Total (ha.) 268.11
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNil0Not applicable
(2.)Wildlife CorridorsNil0Not applicable
(3.)WLSNil0Not applicable
(4.)Critically Polluted AreaNil0Not applicable
(5.)ESZsNil0Not applicable
(6.)CorridorsNil0Not applicable
(7.)NPANil0Not applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestPitagurha8.9WSW
(2.)Archaeological SitesNil0NA
(3.)Defence InstallationsNil0NA
(4.)OthersNilNil0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 268.11
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kukurhagat nala
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 1.1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 20
(e)No. of working days 300
(f)Total Manpower 120
32.
Green Belt in Ha:
(a)Total Area of Green Belt 8.35
(b)Percentage of Total Project Area 3.11
(c)No. of Plants to be Planted 12500
(d)Funds Allocated for Plantation 12.5
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialDirect and Indirect employment
(2.)EnvironmentalSustainable development
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)BauxiteMajor
2.
Mine Capacity in ROM (Run of Mine) 0.6
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. MPM/A/06-ORI/BHU/2021-22
(b)Date of Approval 04 Aug 2021
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Office of Regional Controller of Mines,IBM, Bhaban
(e)Approved Mining Lease Area 268.110
(f)Approved Capacity 0.6
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 15.06
(b)Mineable Reserves (Million Ton) 14.74
(c)Extractable Reserves(Million Ton) 14.74
(d)Percent(%) of Extraction 97.8
(e)Grade of Coal /Ore /Mineral Metal grade of bauxite
(f)Stripping Ratio 1(m3) : 0.039(m3)
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) NA
(i)Mining Method Opencast
(j)Life of Mine (Years) 25
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area Yes
(c)No. of crushers 1
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)1200
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 268.110
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 30 Apr 2005
(iii)Validity of LOI 20
(iv)Reference No. of LOI Letter No.4788
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 268.11
(iii)Validity of the lease deed From : 08 Nov 2007 To : 08 Nov 2027
(iv)Date of Execution of Mining Lese 08 Nov 2007
(v)Reference Number 2145
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof validity not completed
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 1
(ii)Total Area (in Hectare) 1.42
(iii)Height (in meter) 6
(iv)Quantity (in Million Cubic meter) 16145
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0.0756
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0.0756
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0.0756
11.
Details of Final Mine Void:
(a)Area (in Hectare) 109
(b)Depth (in meter) 24
(c)Volume (in Million Cubic meter) 26160000
12.
Details of Quarry:
(a)Final Void of 109 (hectare) at a Depth of 24 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 109
13.
Details of Transportation:
(a)In Pit/Underground to Surface Inpit within 2km by truck
(b)Surface to Siding/Loading Surface to siding Within 25 km by road
(c)Transportation / Conveyor Details Transportation By trucks
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND000
(2.)WASTE LAND000
(3.)OTHERS(Specify)Mining, infrastructure etc268.1100268.11
(4.)GRAZING LAND000
(5.)FOREST LAND000
(6.)SETTLEMENTS000
(7.)SURFACE WATER BODIES000
TOTAL268.110268.11
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)TOP SOIL STORAGE0000
(2.)EXTERNAL OB DUMPS0000
(3.)INTERNAL OB DUMPS0000
(4.)GREEN BELT8.350008.35
(5.)EXCAVATION/QUARRY10900109
(6.)ROADS0000
(7.)BUILT UP AREA (COLONY/OFFICE)0000
(8.)VIRGIN AREA0000
(9.)Othersafety zone ,Steep slopes & scarp faces150.7600150.76
TOTAL268.11000268.11
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 109
(d)Safety Zone(in hectare) 9
(e)Final Void of 0.138 (hectare) at a Depth of 2 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 117.35
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)20100.60.6474320329000
(2.)20130.60.67500064500
(3.)20070.60.6000
(4.)20160.60.690000000
(5.)20150.60.690000000
(6.)20190.60.145000000
(7.)20120.60.65916754500
(8.)20180.60.145000000
(9.)20060.60..6000
(10.)20170.60.690000000
(11.)20110.60.65512504800
(12.)20080.60.6423360337840
(13.)20090.60.643120000
(14.)20140.60.684999600
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/ENV/ACO/21/2194
(ii)Name of the EIA Consultant Vimta Labs Ltd
(iii)Address 142, IDA, Phase II, Cherlapally Hyderabad - 500 051
(iv)Mobile No. 9000711309
(v)Landline No. 0402726414
(vi)Email Id janardhan@vimta.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 27 May 2023
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) Copy of Uploaded Proposal Presentation
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NASir, The Hon’ble Supreme Court vide its order dated 02.01.2024 in Writ Petition(s) (Civil) No(s). 1394/2023 in the matter of Vanashakti versus Union of India directed that “Until further orders, there shall be stay of operation of the Office Memoranda dated 7th July, 2021 and 28th January, 2022 issued by the Ministry of Environment, Forest and Climate Change”. The Ministry also issued an Office Memorandum dated 08.01.2024 regarding the stay imposed by the Hon’ble Supreme Court with reference to the SOP dated 7th July, 2021 and OM dated 28.01.2022. 12 Apr 2024
2. ADS Reply LetterSir, we are herewith submitting the ADS Reply for your kind consideration. With Regards 06 Mar 2024
3.NASir, The Hon’ble Supreme Court vide its order dated 02.01.2024 in Writ Petition(s) (Civil) No(s). 1394/2023 in the matter of Vanashakti versus Union of India directed that “Until further orders, there shall be stay of operation of the Office Memoranda dated 7th July, 2021 and 28th January, 2022 issued by the Ministry of Environment, Forest and Climate Change”. The Ministry also issued an Office Memorandum dated 08.01.2024 regarding the stay imposed by the Hon’ble Supreme Court with reference to the SOP dated 7th July, 2021 and OM dated 28.01.2022 17 Jan 2024
4. ADS Reply LetterSir, We are herewith submitting the ADS Reply, With Regards 21 Nov 2023
5.NASir, complete information not received. The mine lease is in question, the Project Proponent needs to submit the current status of the mine lease from the State Govt. for further necessary action in the matter. Thanks. 27 Oct 2023
6. ADS Reply LetterSir, We are herewith submitting the ADS Reply. With Regards 19 Oct 2023
7.NASir, The Project Proponent vide letter dated 11.07.2023 has informed that no any direct communication received from Department of Mining and Geology to Hindalco after receiving the proceeding of lapse of mines lease dated 12.10.2022 from Dept. of Steel & Mines Govt. of Odisha. Subsequently Hindalco has filed a writ petition on 28.12.2022 to Hon’ble High Court to quash and set aside order bearing dated 12.10.2022 passed by Additional Secretary Steel & Mines Department, Government of Odisha. Hon’ble High Court of Odisha On 30.01.2023 passed an order, directed that “the impugned order dated 12th October, 2022 will be treated as being kept in abeyance till such time, the pending process before the MoEF&CC and the Expert Appraisal Committee (EAC) regarding grant of environmental clearance is not complete. The effect of this will be that during the said process, no steps will be taken by the Department of Steel and Mines, Government of Odisha to grant the lease in question to any other third party”. However, the Environmental Clearance (EC) shall be granted to a project having valid mine lease as on date. Since the mine lease is in question, the Project Proponent needs to submit the current status of the mine lease from the State Govt. for further necessary action in the matter. 25 Sep 2023
8.NASir, The Project Proponent vide letter dated 11.07.2023 has informed that no any direct communication received from Department of Mining and Geology to Hindalco after receiving the proceeding of lapse of mines lease dated 12.10.2022 from Dept. of Steel & Mines Govt. of Odisha. Subsequently Hindalco has filed a writ petition on 28.12.2022 to Hon’ble High Court to quash and set aside order bearing dated 12.10.2022 passed by Additional Secretary Steel & Mines Department, Government of Odisha. Hon’ble High Court of Odisha On 30.01.2023 passed an order, directed that “the impugned order dated 12th October, 2022 will be treated as being kept in abeyance till such time, the pending process before the MoEF&CC and the Expert Appraisal Committee (EAC) regarding grant of environmental clearance is not complete. The effect of this will be that during the said process, no steps will be taken by the Department of Steel and Mines, Government of Odisha to grant the lease in question to any other third party”. However, the Environmental Clearance (EC) shall be granted to a project having valid mine lease as on date. Since the mine lease is in question, the Project Proponent needs to submit the current status of the mine lease from the State Govt. for further necessary action in the matter. 25 Sep 2023
9. ADS Reply LetterWe are herewith submitting the ADS Reply for your Kind Consideration 11 Jul 2023
10.NAPlease provide chronology of the case, court orders and present lease status from DMG. 28 Jun 2023
11. ADS Reply LetterSubmission of compliance to ADS raised by MOEFCC dated 13 July 2022 24 Sep 2022
12.NAPl. inform status of action taken as per Ministry's letter J-110105/79/2020-IA.II(M) dated 08.02.2021 by the State Government for initiating the necessary action under Environment (Protection) Act, 1986. 13 Jul 2022
13. ADS Reply LetterSir, The step-wise compliance of the SoP dated 7th July,2021 for violation, along with the details of payment is submitted herewith. 21 Jun 2022
14.NAPl. provide step-wise compliance of the SoP dated 7th July,2021 for violation, along with the penalty amount. 30 May 2022
15. ADS Reply LetterSir, Please find the attachment of ADS Replies 13 Mar 2022
16.NA

Deferred

28 Feb 2022
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPratap Kumar Patra
DesignationAgent Maliparbat Mines
Name of Company (Applicant Name should not be given here)HINDALCO INDUSTRIES LIMITED
AddressAhura Centre, 1st Floor, B -Wing, Mahakali Caves Road, Andheri (East), Mumbai-400093