Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Granite Building Stone Quarry of M/s Morayoor Granites Pvt Ltd
(b)Name of the Company / Organisation MORAYOOR GRANITES PVT LTD
(c)Registered Address Morayoor Granites Pvt Ltd, Kondotty, Malappuram,,Malappuram,Kerala-673638
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ummer Kutty K
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Mutcheth House, Elambra, NEllikuzhy, Ernakulam,,Tirur,Malappuram,Kerala-673638
(d)Pin code 673638
(e)E-mail morayoorec01@gmail.com
(f)STD Code. 0(f)Telephone No.
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/KL/MIN/232178/2021
(d)Master Proposal Number(Single Window) SW/232177/2021
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Re Sy No:152/1-1,152/1,159/1-1,159/1-2,159
(b)Pincode 673638
(c)Bounded Latitudes (North)
From
Degree 11
Minutes 06
Second 25.44
From
Degree 11
Minutes 06
Second 40.96
(d)Bounded Longitudes (East)
From
Degree 76
Minutes 0
Second 36.26
From
Degree 76
Minutes 0
Second 43.68
(e)Survey of India Topo Sheet No. C43D16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 310
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Kerala
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)KeralaMalappuramEranadMorayur
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number na
(b)Date of Apply of TOR 30 Sep 2021
(c)Date of Issue of TOR / Standard ToR 30 Sep 2021
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason The project area is less than 5Ha
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)ROCK BREAKER-1
(2.)JACK HAMMER32MM1
(3.)COMPRESSORCHICAGO1
(4.)BACK HOE0.9M31
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)BUILDING STONE QUARRY OF 4.9797HA1576694OthersMTRoad,Pipe Conveyor
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 3.5
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.285
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.18
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.105
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Diesel2Kilo Litre per DayOPEN MARKETRoad2 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 29 Apr 2019 To 30 Apr 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube6.82.66.880
(2.)NOxMicro Gram per Meter Cube6.12.96.180
(3.)PM2.5Micro Gram per Meter Cube2118.42160
(4.)PM10Micro Gram per Meter Cube50.449.650.4100
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l31.0831.08250300
(2.)FluorideNA0000
(3.)pHNA7.057.0578.5
(4.)Total Hardnessmg/l30.3030.30200500
(5.)Heavy MetalsIRONmg/l0.070.0711
(6.)TDSmg/l92925001000
(7.)TSSmg/l0000
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODNA00A
(2.)CODNA00A
(3.)pHNA00A
(4.)DONA00A
    14.4.     No. of Ambient Noise monitoring locations : 4
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))47.544.155
(2.)Leq(Night)A-weighted decibels(dB(A))36.933.545
    14.5.     No. of Soil Sample Monitored locations : 0
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)00
(2.)K(Potassium)00
(3.)pH00
(4.)Electric Conductivity00
(5.)N(Nitrogen)00
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 25
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 25 To 30
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTANKER SUPPLY62 Not Appliacble PipelineOthersPIPENA24 Aug 20216
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)DOMESTIC WASTE0.81SEPTIC TANK WITH SOAKPITOthersPERCOLATES TO SOAK PIT0.80
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0.8
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0.8
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)TOPSOILOthersTOPSOIL20701Tons0.2RoadOthersRECLAMATION/BACKFILLING
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube49.61554.6100
(2.)SO2Microgram per Meter Cube6.8128.880
(3.)NOxMicrogram per Meter Cube6.1128.180
(4.)PM2.5Microgram per Meter Cube18.41523.460
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SETDIESEL30.2PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 125
(b)Source DG
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) DG 125KVA
(e)Stack Height (in m) 3
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 4.9797
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 4.9797
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : LEASE AREA 4.9797
    Total (ha.) 4.9797
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.6195
(2.)Quarry Area4.3602
Total (ha.) 4.9797
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNIL0NONE WITHIN 10KM
(2.)NPANIL0NONE WITHIN 10KM
(3.)CorridorsNIL0NONE WITHIN 10KM
(4.)ESAsNIL0NONE WITHIN 10KM
(5.)ESZsNIL0NONE WITHIN 10KM
(6.)WLSNIL0NONE WITHIN 10KM
(7.)Wildlife CorridorsNIL0NONE WITHIN 10KM
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNIL0NONE WITHIN 10KM
(2.)Archaeological SitesNIL0NONE WITHIN 10KM
(3.)Defence InstallationsNIL0NONE WITHIN 10KM
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 365
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 4.97
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area KADALUNDI RIVER
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 11
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 11
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.61
(b)Percentage of Total Project Area 12.25
(c)No. of Plants to be Planted 1000
(d)Funds Allocated for Plantation 150000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialMineral benefication
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)graniteMinor
2.
Mine Capacity in ROM (Run of Mine) 1576694
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. DOM/M-4211/2018
(b)Date of Approval 12 Jul 2021
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department DEPT OF MINING AND GEOLOGY,MALAPPURAM
(e)Approved Mining Lease Area 4.9797
(f)Approved Capacity 1576694
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 4681408.8
(b)Mineable Reserves (Million Ton) 1576694
(c)Extractable Reserves(Million Ton) 1576694
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral 0
(f)Stripping Ratio 0 : 0
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 0
(i)Mining Method Opencast
(j)Life of Mine (Years) 10
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 4.9797
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 30 May 2019
(iii)Validity of LOI 1
(iv)Reference No. of LOI 4072/M3/2019
(c)Whether Lease Deed Executed ? No
(i)Reason thereof EC NOT GRANTED
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof EC NOT GRANTED
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 1
(ii)Total Area (in Hectare) 0.04
(iii)Height (in meter) 3
(iv)Quantity (in Million Cubic meter) 20701
(v)No. of year back fill up 5
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 20701
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 20701
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 1.8587
(b)Depth (in meter) 5
(c)Volume (in Million Cubic meter) 18587
12.
Details of Quarry:
(a)Final Void of 1.8587 (hectare) at a Depth of 5 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 4.9797
13.
Details of Transportation:
(a)In Pit/Underground to Surface NA
(b)Surface to Siding/Loading LOADING
(c)Transportation / Conveyor Details TRUCKS/TIPPERS
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)WASTE LAND000
(2.)SURFACE WATER BODIES000
(3.)OTHERS(Specify)QUARRY4.979704.9797
(4.)AGRICULTURE LAND000
(5.)FOREST LAND000
(6.)SETTLEMENTS000
(7.)GRAZING LAND000
TOTAL4.979704.9797
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)BUILT UP AREA (COLONY/OFFICE)0000
(2.)VIRGIN AREA0000
(3.)TOP SOIL STORAGE0000
(4.)EXTERNAL OB DUMPS0000
(5.)ROADS000.20.2
(6.)OtherDRAINAGE00.2200.22
(7.)EXCAVATION/QUARRY2.08151.858703.9402
(8.)INTERNAL OB DUMPS0000
(9.)GREEN BELT0.6195000.6195
TOTAL2.7012.07870.204.9797
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0.04
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 4.9797
(d)Safety Zone(in hectare) 0.6195
(e)Final Void of 1.8587 (hectare) at a Depth of 5 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 300
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 1000
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/ENV/ACO/21/1640
(ii)Name of the EIA Consultant SBA ENVIRO SYSTEMS PVT LTD
(iii)Address VISAKAPURI, NEW DELHI
(iv)Mobile No. 8089085335
(v)Landline No. 000000
(vi)Email Id arunkram4@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 31 May 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report Copy of District Survey Report
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data Copy of Replenishment Study Report & Baseline Survey Data
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC meeting) Copy of Uploaded Proposal Presentation
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NASir, The comments from the Ministry of Law regarding District Survey Report (DSR) is yet to be received. 07 Feb 2024
2. ADS Reply LetterADS submission of environmental clearance application for Granite Building Stone Quarry of M/s Morayoor Granites Private Limited, for an extent of 4.9797Ha. 19 Jan 2024
3.NASir, The Project Proponent is requested to submit the point wise reply to the recommendations of the subcommittee. 01 Jan 2024
4. ADS Reply LetterADS submission of environmental clearance application for Granite Building Stone Quarry of M/s Morayoor Granites Private Limited, for an extent of 4.9797 Ha.Due to the delay in getting forest concerned letter from forest department, we were not able to upload the ADS on time, please consider this ADS and grant the environmental clearance, at your earlier convenience 23 Dec 2023
5.NA

Deferred

10 Mar 2023
6. ADS Reply LetterReply Letter for the Additional Details Sought 06 Feb 2023
7.NA

Deferred

25 Jan 2023
8. ADS Reply LetterReply Letter-Additional Details sought in 6th EAC (Non-Coal Mining) Meeting 05 Jan 2023
9.NA

Deferred

16 Nov 2022
10. ADS Reply LetterNA 21 Jan 2022
11.NA

Deferred

07 Jan 2022
12. ADS Reply LetterClarification regarding the DSR is attached. 20 Dec 2021
13.NA

deferred

26 Nov 2021
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantUmmer Kutty K
DesignationDirector
Name of Company (Applicant Name should not be given here)MORAYOOR GRANITES PVT LTD
AddressMorayoor Granites Pvt Ltd, Kondotty, Malappuram
Print