1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | testing Proposal | (b)Name of the Company / Organisation | Kali Mandal | (c)Registered Address | ,, , ,,East,Delhi-0 | (d)Legal Status of the Company | State Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Kali kumar mandal | (b)Designation (Owner/ Partner/ CEO) | programmer | (c)Address | 55 56 rajat vihar,khora noida,Gandhi Nagar,East,Delhi-123456 | (d)Pin code | 123456 | (e)E-mail | rupeshyadav12@gmail.com | (f)STD Code. | 11(f)Telephone No. | 1234567 | (g)Fax No. | 11123456 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5g(a)-Grain Based distilleries for Ethanol Blended Petrol
| Minor Activity | | (b)Category | B2 | Reason for Applying at Ministry | Select | Zero Liqued Discharged | Yes | (c)Proposal Number | IA/BR/IND2/222231/2021 | (d)Master Proposal Number(Single Window) | SW/222230/2021 | (e)EAC concerned (for category A Projects only) | NIL | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 11 | (b)Pincode | 853202 | (c)Bounded Latitudes (North) | | From | | Degree | 22 | Minutes | 23 | Second | 24 | From | | Degree | 66 | Minutes | 68 | Second | 69 | (d)Bounded Longitudes (East) | | From | | Degree | 25 | Minutes | 26 | Second | 27 | From | | Degree | 70 | Minutes | 71 | Second | 72 | (e)Survey of India Topo Sheet No. | 22 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 22 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 22 | (j)Seismic Zone | 1 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Bihar | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Project Configuration/Product: | |
|
6.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | 222 | 333 | 444 | |
6.2. Product |
---|
S. No. | Product/Activity (Capacity) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 22 | 55 | Kilo Litre per Day | | Road | | |
|
7. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
7.1. | Details of CTE | (i)Whether CTE obtained ? | NA | (ii)Copies of all CTE obtained since inception | NA | (iii)Date of Issue | 28 Jun 2021 | (iv)Valid Upto | 03 Jul 2021 | (v)File No. | 222 | (vi)Application No. | 333 | (vii)Copy of CTE valid as on date | Copy of Consent to Operate | |
|
7.2. | Details of Consent to Operate | (iii)Date of Issue | 01-01-1900 00:00:00 | (iv)Valid Upto | 01-01-1900 00:00:00 | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
8. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 20 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 10 | (c) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 10 | |
|
| Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | | | |
  9. Raw Material / Fuel Profile |
---|
S. No. | Type | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) |
---|
(1.) | New | 70% Per Chloric Acid (Acid) | 22 | Tons per Annum | | 22 | Road | | 33 | |
|
10. Details of Water Requirement |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 11 | 22 | Copy of Permission Letter | Pipeline | | Barrage | | 44 | 02 Jul 2021 | 33 | |
|
11. | (a)Total Waste Water Generation | | (b)Total Discharged Water | | (c)Total Reused Water | | |
|
11.1. Waste Water Management |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Quantity of Treated water & Resives or Recycle (Kilolitre per Day) | Mode of Disposal | ZLD Plan Letter |
---|
(1.) | 112 | 2 | 33 | 44 | ZLD | | Copy of ZLD Plan | |
|
12. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | ww | Municipal Solid Waste | | 22 | Tons | 33 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
13. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 111 | (b)Source | 222 | (c)Standby Arrangement (Details of DG Sets) | Yes | (d)Stack Height (in m) | 22 | |
|
14. | Land Ownership Pattern: | (a)Forest Land (ha.) | 11 | (b)Private Land (ha.) | 22 | (c)Government Land (ha.) | 33 | (d)Revenue Land (ha.) | 44 | (e)Other Land (ha.) | 55 | Total Land (ha.) | 20 | |
|
15. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 11 | (b)Waste/Barren Land (ha.) | 222 | (c)Grazing/ Community Land (ha.) | 33 | (d)Surface Water Bodies (ha.) | 44 | (e)Settlements (ha.) | 66 | (f)Industrial (ha.) | 77 | (g)Forest (ha.) | 55 | (h)Mangroves (ha.) | 88 | (i)Marine Area (ha.) | 99 | (j)Others (ha.) : ss | 22 | Total (ha.) | 717.0000 | |
|
16. | Details of Ecological & Environmental Sensitivity : - | |
|
16.1. Details of Ecological Sensitivity : No |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
NIL | |
16.2. Details of Environmental Sensitivity : No |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
NIL | |
|
17. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
18. | Forest Land: | Whether any Forest Land involved? | No | |
|
19. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 11 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
20. | Land Acquisition Status: | (a)Acquired Land(Ha) | 22 | (b)Land yet to be acquired(Ha) | 33 | (c)Status of Land acquisition if not acquired | 44 | |
|
21. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | | (b)No. of Households | | (c)No. of PDFs (Project Displaced Families) | | (d)No. of PAFs (Project Affected Families) | | (e)Funds Allocated for R&R(in INR) (in Lacs) | | (f)Status of R&R | NA | |
|
22. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
23. | Manpower Requirement: | (a)Permanent Employment | 11 | (b)Temporary /Contractual Employment | 11 | (c)Total Manpower | 22 | (d)No. of working days | 1 | |
|
24. | Green Belt in Ha: | (a)Total Area of Green Belt | 11 | (b)Percentage of Total Project Area | 55.00 | (c)No. of Plants to be Planted | 33 | (d)Funds Allocated for Plantation | 22 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
25. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | en | |
|
27. CRZ Specific Details : Not Applicable |
28. Sector Specific Details : NOT APPLICABLE |
30. Sector Specific Details For Industrial Projects - 2 |
|
|
30. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
31. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
32. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | No | (i)Reason for not Hiring the Consultant | asasas | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Kali kumar mandal | Designation | programmer | Name of Company (Applicant Name should not be given here) | Kali Mandal | Address | Delhi |
|