Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed project of dyes Intermediates @ 100 MT /M by M/s. Earth Intermediate Pvt Ltd. located at Block No. 905, sub plot No. 3 & 4, Opp. Golden Estate, Chhatral - Kadi Road, Village - Chhatral, Ta - Kalol, Dist - Gandhinagar, Gujarat
(b)Name of the Company / Organisation EARTH INTERMEDIATE PRIVATE LIMITED
(c)Registered Address Plot No: 3 & 4, Opp. Golden Estate, Chharal-Kadi Road, Village: Chhatral, Ta: Kalol, Dist: Gandhinagar.,,Gandhinagar,Gujarat-382729
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Nishit P Prajapati
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address 15-A, Vrundavan Co. Op. Ho. Soc., B/s. Cosmos Casal School, Maninagar, Ahmedabad-380008,,Kalol,Gandhinagar,Gujarat-382729
(d)Pin code 382729
(e)E-mail nishitprajapati5181@gmail.com
(f)STD Code. 79(f)Telephone No. 25321401
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND3/204225/2018
(d)Master Proposal Number(Single Window) SW/204210/2021
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Block No. 905, Sub Plot No. 3 & 4, Opp. Golden Est
(b)Pincode 382729
(c)Bounded Latitudes (North)
From
Degree 23.275558
Minutes
Second
From
Degree 23.276256
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.415183
Minutes
Second
From
Degree 72.415961
Minutes
Second
(e)Survey of India Topo Sheet No. (1)F43A07 (2)F43A08 (3)F43A11 (4)F43A12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 71
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 90
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/49/2018-IA-II(I)
(b)Date of Apply of TOR 09 Feb 2018
(c)Date of Issue of TOR / Standard ToR 23 Mar 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :18 Jan 2020
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :25 Feb 2020
Distance of Public Hearing Venue from the Proposed Project :0
Project Site of M/s. Earth Intermediate
State :Gujarat
District :Gandhinagar
Tehsil :Kalol
Village :Chhatral
34Regarding Air Pollution Control, CER activity, Trees Plantation, Employment generation etc.OthersAdditional District Magisrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Ball mill – 1 2000 Kgs1 Nos
(2.)Vessel (1) MSRL 5000 Ltr4 Nos
(3.)Filter Press SS 200 Ltr / Hour2 Nos
(4.)Tray Dryer (MS) 200Tray3
(5.)Hot Air Generator (10 Lac k cal/hr)1 Nos
(6.)Crystallizer (100 kg/hr)1 Nos
(7.)Spray Dryer (1 KL/Hr)1 Nos
(8.)Vessel (2) MSRL 10000 Ltr3 Nos
(9.)Steam Boiler (2 TPH)1 Nos
(10.)Vessel (3) MSRL 20000 Ltr2 Nos
(11.)Ball mill – 2 500 Kgs1 Nos
(12.)Vessel (4) MSRL 30000 Ltr1 Nos
(13.)D. G. Set (125 KVA)1 Nos
(14.)Pulverizer (100 kg/hr)1 Nos
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)PAPSA, C Acid, Sulpho C Acid, 2R Acid, K Acid, PNCBOSA, 4-NADPSA, 4-NAP, 4-CAP, Metanilic Acid, Peri Acid100OthersMT/MonthRoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 3.96
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.585
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.081
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 3.1325
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 744
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 744
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)C Acid50OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail150 Open MarketCopy of Linkage
(2.)Calcium Hydroxide30OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail150 Open MarketCopy of Linkage
(3.)Caustic Lye25OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail100 Open MarketCopy of Linkage
(4.)Iron powder60OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail150 Open MarketCopy of Linkage
(5.)Liq. Ammonia15OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail150 Open MarketCopy of Linkage
(6.)B Naphthol25OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail150 Open MarketCopy of Linkage
(7.)Oleum (23%)35OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail150 Open MarketCopy of Linkage
(8.)PNA20OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail150 Open MarketCopy of Linkage
(9.)PNCBSA20OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail150 Open MarketCopy of Linkage
(10.)Salt20OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail100 Open MarketCopy of Linkage
(11.)Soda Ash20OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail100 Open MarketCopy of Linkage
(12.)Sodium Bi Sulphate5OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail150 Open MarketCopy of Linkage
(13.)Sodium Bi Carbonate20OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail150 Open MarketCopy of Linkage
(14.)Sodium hydrosulfide20OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail150 Open MarketCopy of Linkage
(15.)Sodium Nitrite10OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail100 Open MarketCopy of Linkage
(16.)Sulphuric Acid100OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail100 Open MarketCopy of Linkage
(17.)2,4 Dinitrochloro benzene30OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail150 Open MarketCopy of Linkage
(18.)Caustic Flakes20OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail100 Open MarketCopy of Linkage
(19.)Hydrochloric Acid35OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail100 Open MarketCopy of Linkage
(20.)PNCB52OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail150 Open MarketCopy of Linkage
(21.)K Acid25OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail150 Open MarketCopy of Linkage
(22.)Napthalene25OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail150 Open MarketCopy of Linkage
(23.)Aniline15OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail150 Open MarketCopy of Linkage
(24.)Formaldehyde10OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail150 Open MarketCopy of Linkage
(25.)Lime stone Powder4OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail100 Open MarketCopy of Linkage
(26.)Magnesium oxide8OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail150 Open MarketCopy of Linkage
(27.)Nitro Benzene30OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail150 Open MarketCopy of Linkage
(28.)Nitric Acid15OthersMT/MonthDahej, Ankleshwar, Panoli, Ahmedabad, JagdiyaRoad,Rail150 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube88.6665.6688.02100
(2.)NOxMicro Gram per Meter Cube49.9212.9946.7980
(3.)SO2Micro Gram per Meter Cube30.8711.7429.1480
(4.)PM2.5Micro Gram per Meter Cube45.1330.2844.9160
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.17.36.58.5
(2.)TSSmg/l1100
(3.)TDSmg/l10098055002000
(4.)Total Hardnessmg/l274220300600
(5.)Chloridesmg/l388285.42501000
(6.)Fluoridemg/l0.890.61.01.5
(7.)Heavy MetalsCoppermg/l0.010.011.01.5
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.82.6E
(2.)BODmg/l122E
(3.)CODmg/l48.816.2E
(4.)pHNA8.27.8E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))514470
(2.)Leq(Day)A-weighted decibels(dB(A))585375
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.57.8
(2.)P(Phosphorus)Milligram per Kilogram11.078.19
(3.)N(Nitrogen)Milligram per Kilogram0.040.02
(4.)K(Potassium)Milligram per Kilogram6847
(5.)Electric ConductivityOthersOhm/cm279181
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 40
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 20
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersCGWA480Copy of Permission LetterPipelineOthersBore well6235511 Feb 202148
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic2.00Septic TankOtherssoak pit via septic tank02.0
(2.)Industrial33.550Primary treatmentOthersCommon Spray Dryer facility for Spray Drying033.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 35.5
(b)Total Discharged Water (Kilolitre per Day) 35.5
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.02Kilolitre50RoadOthersSend to Registered recycler
(2.)Iron SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)600Tons150Road,RailOtherssell to Rule 9 authorized Industries
(3.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)240Tons45RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Discarded Container Bags/Barrel/DrumHazardous Waste (as per Hazardous and Other Waste Management rules 2016)30Tons30RoadAuthorized Recyclers
(5.)Gypsum SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)600Tons150Road,RailOtherssell to Rule 9 authorized Industries
(6.)Ferric Chloride SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)600Tons150Road,RailOtherssell to Rule 9 authorized Industries
(7.)Spent Sulphuric Acid (45-50%)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)1200Kilolitre0RoadOthersTotaly Reuse in mfg. process within premises
(8.)Sodium bisulfiteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2064Tons150Road,RailOtherssell to Rule 9 authorized Industries
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube43.870.10.2944.1760
(2.)SO2Microgram per Meter Cube22.320.10.3422.6780
(3.)NOxMicrogram per Meter Cube45.050.10.2545.3180
(4.)PM10Microgram per Meter Cube84.870.10.8985.77100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Hot Air Generator (10 Lac K cal/hr)Agro Waste/Briquettes/Bio Coal150.4PM100.23125 g/s
(2.)DG Set (125 KVA)Diesel110.3PM100.000046 g/s
(3.)Spray Dryer (1 KL/Hr)NA300.9PM100.002 g/s
(4.)Reaction VesselNA180.35SO20.0012 g/s
(5.)Steam Boiler (2 TPH)Agro Waste/Briquettes/Bio Coal150.4PM100.185 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 250
(b)Source Uttar Gujarat Vij Company Ltd.
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) D.G. Set (125 KVA)
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.6118
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.6118
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Habitation, Vegetation, River, Land without scrub, 31750.01
    Total (ha.) 31750.0100
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.2020
(2.)Built Up Area0.2780
(3.)OthersETP, Road & Open Area0.1318ETP, Road & Open Area
Total (ha.) 0.6118
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsNone within 10 km radius0No ESZs in study area
(2.)Critically Polluted AreaNone within 10 km radius0No Critically Polluted Area with in 10 km
(3.)CorridorsNone within 10 km radius0No Corridors in study area
(4.)Wildlife CorridorsNone within 10 km radius0No Wildlife Corridors in study area
(5.)WLSNone within 10 km radius0No WLS in study area
(6.)ESAsNone within 10 km radius0No ESAs in study area
(7.)NPANone within 10 km radius00No NPA in study area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone within 10 km radius0No Forest in study area
(2.)Defence InstallationsNone within 10 km radius0No Defence Installations in study area
(3.)Archaeological SitesNone within 10 km radius0No Archaeological Sites in study area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.61
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Peacock (Indian Peafowl/Pavocristatus)
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 1,78,000
(iii)Period of Implementation December 2020
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Chhatral Pond
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 3.38
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 9
(c)Temporary Employment- During Construction 3
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 12
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.20
(b)Percentage of Total Project Area 32.69
(c)No. of Plants to be Planted 100
(d)Funds Allocated for Plantation 150000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment increases in nearby villages.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1921/RA0156
(ii)Name of the EIA Consultant Bhagwati Enviro Care Pvt. Ltd.
(iii)Address Plot No. 28, 29, 30, Parmeshwar Estate II, Opp. AMCO Bank, Phase-I, GIDC Estate, Vatva, Ahmedabad, Gujarat.
(iv)Mobile No. 9824051541
(v)Landline No. 0794008305
(vi)Email Id tech5@bhagwatienviro.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 23 May 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAYour proposal has been examined and following are the deficiencies needs to be submitted: 1. Details of products (Complete Name) with proposed production capacity for which EC is required needs to be mentioned in Form 2 (S No. 8.1) 2. Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2. Kindly upload the action plan in S.No. 7.1 of Form 2 alongwith other requisite details. 3. TOR granted in 2018, however water approval is still not taken. Please upload the status of water approval. 4. Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2). PP mentioned Not Applicable. 5. As per s.no. 28 of form 2, Schedule I species reported. Details of approval regarding to conservation plan needs to be uploaded. 6. PP in form 2 (S.No. 27) has not adequately mentioned the details of R&R. Everything mentioned NA. 7. TOR granted in 2018, however water approval is still not taken. Please upload the status of water approval. 8. It is noted that PP has prepared TOR compliance with vogue answers. Detailed TOR compliance needs to submitted 9. Effluent treatment mechanism with plan needs to be submitted 10. Membership of TSDF, if any please upload on portal 11. Details of land conversion from agricultural to industrial purpose needs to be submitted. 12. Proposed Green belt development program along-with time line and budgetary allocation needs to be provided. 13. It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. 01 Apr 2021
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantNishit P Prajapati
DesignationPartner
Name of Company (Applicant Name should not be given here)EARTH INTERMEDIATE PRIVATE LIMITED
AddressPlot No: 3 & 4, Opp. Golden Estate, Chharal-Kadi Road, Village: Chhatral, Ta: Kalol, Dist: Gandhinagar.