1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | NAINI COAL MINE (OPENCAST PROJECT) | (b)Name of the Company / Organisation | The Singareni Collieries Company Limited | (c)Registered Address | M/s. Singareni Collieries Company Limited
PO: Kothagudem Collieries - 507 101
Dist: KHAMMAM, T.Sr,,Khammam,Telangana-507101 | (d)Legal Status of the Company | State Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Shri G Venkateswara Reddy | (b)Designation (Owner/ Partner/ CEO) | Director (Planning & Projects) | (c)Address | Kothagudem P.O -507101 Bhadradri Kothagudem District,,,Bhadradri Kothagudem,Telangana-507101 | (d)Pin code | 507101 | (e)E-mail | gm_env@scclmines.com | (f)STD Code. | 8744(f)Telephone No. | 243059 | (g)Fax No. | 08744244115 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 2(a) Coal washeries 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/OR/CMIN/102794/2019 | (d)Master Proposal Number(Single Window) | SW/201731/2021 | (e)EAC concerned (for category A Projects only) | Coal Mining | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 73 C/16 and Special Topo sheet Nos. L-11 and M-11 | (b)Pincode | 759124 | (c)Bounded Latitudes (North) | | From | | Degree | 210321 | Minutes | | Second | | From | | Degree | 210523 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 845256 | Minutes | | Second | | From | | Degree | 845517 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 73 C/16 , L-11 and M-11 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 159 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.1 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Orissa | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Orissa | Angul | Chhendipada | CHHENDIPADA | (2.) | Orissa | Angul | Chhendipada | Kardabahal | (3.) | Orissa | Angul | Chhendipada | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11015/49/2019-IA-II(M) | (b)Date of Apply of TOR | 13 Jun 2019 | (c)Date of Issue of TOR / Standard ToR | 26 Nov 2019 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 20 Jan 2021 | Distance of Public Hearing Venue from the Proposed Project : | 0.46 |
| Karada Bahal Village, Angul | State : | Orissa | District : | Angul | Tehsil : | Chhendipada | Village : | Karada Bahal |
| 204 | Generation of local employment opportunity, education, drinking water facility, development of village roads, cleaning of village ponds, pension for senior citizen, adequate air pollution control. Ade | Others | Additional District Magistrate (Revenue) | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Opencast Mining | 10 MTPA | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 912.799 ha | 10 | Others | MTPA | Road,Rail | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 494.30 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 20.85 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.71 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 10540 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 10540 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Explosives | 10540 | Tons per Annum | | Purchase form explosive companies | Road | | 250 | MoU | | Copy of Linkage | (2.) | Water | 4000 | Kilo Litre per Day | | From the project itself | Others | Pipeline | 1.0 | Others | Pumping | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2019 To 28 Feb 2020 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 63 | 40 | 62.5 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 9.8 | 5.6 | 9.7 | 80 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 32.2 | 20.4 | 32.2 | 60 | (4.) | NOx | | Micro Gram per Meter Cube | 15.4 | 13.3 | 15.4 | 80 | |
14.2. No. of Ground Water monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Chlorides | | | mg/l | | 375 | 30 | 250 | 1000 | (2.) | Fluoride | | | mg/l | | 0.85 | 0.18 | 1.0 | 1.5 | (3.) | Heavy Metals | | Lead | mg/l | | 0 | 0 | 0.01 | 0 | (4.) | Total Hardness | | | mg/l | | 445 | 35 | 200 | 600 | (5.) | TSS | | | NA | | 0 | 0 | 0 | 0 | (6.) | pH | | | NA | | 7.8 | 6.9 | 8.5 | 0 | (7.) | TDS | | | mg/l | | 1200 | 114 | 500 | 2000 | |
14.3. No. of Surface Water monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.2 | 7.5 | A | (2.) | DO | | mg/l | | 6.4 | 5.9 | B | (3.) | BOD | | mg/l | | 3 | 2 | B | (4.) | Others | Total Coliforms | Others | MPN/100ml | 540 | 110 | C | (5.) | COD | | mg/l | | 18 | 14 | A | |
14.4. No. of Ambient Noise monitoring locations : 10 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 50.4 | 35.2 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 41.5 | 30.9 | 45 | |
14.5. No. of Soil Sample Monitored locations : 7 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | Electric Conductivity | Millisiemens per Centimetre | | 0.24 | 0.13 | (2.) | N(Nitrogen) | Kilogram per hectare | | 201 | 163 | (3.) | pH | | | 8.3 | 7.1 | (4.) | K(Potassium) | Kilogram per hectare | | 371 | 271 | (5.) | P(Phosphorus) | Kilogram per hectare | | 19.7 | 10.7 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 26.50 To 4.25 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.11 To 20.35 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | 21-4/2524/OR/MIN/2020, dated 22.07.2020 | (f)Date of Issue | 22 Jul 2020 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 4000 | 1.0 | Copy of Permission Letter | Pipeline | | Others | Pumping | 21-4/2524/OR/MIN/2020, dated 22.07.2020 | 22 Jul 2020 | 4000 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Water pumped out from mine | 5183 | 5183 | Settling ponds, Slow sand filters and ETPs | Others | Discharged into nearby water tanks | 4000 | 1183 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 5183 | (b)Total Discharged Water (Kilolitre per Day) | 1183 | (c)Total Reused Water (Kilolitre per Day) | 4000 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Overburden&Topsoil | Others | Overburden&Topsoil | 55124500 | Tons | 3.0 | Others | Dumpers | Others | Storage in dumps | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 57 | 0 | 40.98 | 97.98 | 250 | (2.) | PM2.5 | | Microgram per Meter Cube | 32.2 | 0.9 | 1.9 | 34.1 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 9.8 | 0.9 | 0.14 | 9.95 | 80 | (4.) | NOx | | Microgram per Meter Cube | 14.5 | 0 | 6.44 | 20.94 | 120 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | NA | NA | 0 | 0 | Others | NA | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 12900 | (b)Source | 132 KV OSTRANSCO electrical sub-station located ne | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | Nil | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 783.275 | (b)Private Land (ha.) | 111.827 | (c)Government Land (ha.) | 17.697 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 912.799 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 112.762 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 4.514 | (d)Surface Water Bodies (ha.) | 6.892 | (e)Settlements (ha.) | 3.591 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 783.275 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Road and others | 1.765 | Total (ha.) | 912.7990 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Quarry Area | | 762.414 | | (2.) | Safety Zone | | 45.939 | | (3.) | Built Up Area | | 40.893 | Coal washery,CHP,Roads | (4.) | Green belt | | 28.006 | | (5.) | Others | Nallah diversion, Garland drains and Embankment | 35.547 | | (6.) | Township | | 0 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Corridors | nil | 0 | Nil | (2.) | Critically Polluted Area | nil | 0 | Nil | (3.) | WLS | nil | 0 | Nil | (4.) | NPA | nil | 0 | Nil | (5.) | ESZs | nil | 0 | Nil | (6.) | ESAs | nil | 0 | Nil | (7.) | Wildlife Corridors | nil | 0 | Nil | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Kosala RF, Brahmanibil, | 3.2 | Nil | (2.) | Defence Installations | | nil | 0 | nil | (3.) | Archaeological Sites | | 0 | 0 | 0 | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | Under Process(Stage-II) | (b)Legal Status of Forest Land | Reserved | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 129.52 | (c)Status of Land acquisition if not acquired | In process | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 1 | (b)No. of Households | 14 | (c)No. of PDFs (Project Displaced Families) | 30 | (d)No. of PAFs (Project Affected Families) | 640 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 14198 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Elephant, Indian python, Indian peafowl and Indian Monitor Lizard | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 122 Lakhs | (iii)Period of Implementation | 10 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Kudaposi nalla flows from south to north across the project area. Two more seasonal nallas viz., Shiarimalia and Ullani nalla flow across the block towards north and join the Gauduni nalla which flows northern boundary of the block flows from south – west to north – east. . All these are seasonal streams of 3rd and 4th order | (b)Whether there is Diversion Required ? | Yes | (i)Details of Diversion Required | It is proposed to divert Kudaposi, Shiarimalia and Ullani nallas along the southern boundary of ML and drain into the existing Gauduni nalla. These three streams are planned to be diverted in consulta | (ii)Details of Study Conducted | AsK Architects & Builders Pvt. Ltd has prepared D | (c)Whether permission has been obtained from competent authority ? | Yes | (i)Uploaded copy of permission | Copy of permission | (ii)Letter No. | Engineer in Cheif WP BP-41/2011/2 9527 | (iii)Date of issue | 22 Mar 2021 | (iv)Recommendation | NA | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | 1. The Gauduni nalla flows along north boundary of ML area. It flows from south – west to north – east. This is the main drainage in the mining lease area. 2.Atundi nallah flowing at a distance of 1.9 km-East | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 0.1 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 92 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 1188 | (e)No. of working days | 330 | (f)Total Manpower | 1280 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 593.78 | (b)Percentage of Total Project Area | 65.05 | (c)No. of Plants to be Planted | 1484467 | (d)Funds Allocated for Plantation | 59300000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Infrastructure facilities like drinking water supply, sanitation, roads, culverts, community halls, street lighting, Education, Medical, Recreation , Business establishments etc., will be improved in the surrounding villages through CSR activities. Excess mine discharge water will be utilized for irrigation and ground water recharge. | (2.) | Environmental | Of the total project area of 912.799 ha, 593.787 ha will be reclaimed with plantation by the end of post closure stage.
About 210.68 Mm3 volume of the project will be converted in to water body at post closure stage which will augment ground water recharge. | (3.) | Financial | Direct and Indirect employment opportunities to local people in contractual works like coal mining operations, civil construction, coal transportation, supply of goods and provision of services to the project and other community services. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Coal | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 10 MTPA | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | No.34011/14/2018-CPAM.. | (b)Date of Approval | 08 Apr 2019 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | Coal | (e)Approved Mining Lease Area | 912.799 | (f)Approved Capacity | 10 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 455.18 | (b)Mineable Reserves (Million Ton) | 378.64 | (c)Extractable Reserves(Million Ton) | 340.78 | (d)Percent(%) of Extraction | 90 | (e)Grade of Coal /Ore /Mineral | G 10 | (f)Stripping Ratio | 1 : 2.58 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 1 in 7 to 14 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 38 years | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | Yes | (b)Beneficiation / Washing Technology | Jig & Drum Washing | (c)Capacity | 9 | (d)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | Yes | (b)No. of seams | 22 | (c)Thickness of seams to be worked on | 137.93 | (d)Maximum Thickness of Seams (metres) | 35.3 | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 912.799 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 18 Jun 2020 | (iii)Validity of LOI | 43 | (iv)Reference No. of LOI | Section 11(1) of CBA (A&D) Act, 1957- S.O.467 of M | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 912.799 | (iii)Validity of the lease deed | From : 15 Feb 2020 To : 14 Feb 2063 | (iv)Date of Execution of Mining Lese | 15 Feb 2020 | (v)Reference Number | Section 11(1) of CBA (A&D) Act, 1957- S.O.467 of M | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | Initial | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 1 | (ii)Total Area (in Hectare) | 283.71 | (iii)Height (in meter) | 120 | (iv)Quantity (in Million Cubic meter) | 168.57 | (v)No. of year back fill up | 6 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 1 | (ii)Total Area (in Hectare) | 479.546 | (iii)Height (in meter) | 120 | (iv)Quantity (in Million Cubic meter) | 877.610 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 7.61 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 7.54 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0.07 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 282.868 | (b)Depth (in meter) | 210 | (c)Volume (in Million Cubic meter) | 210.68 | |
|
12. | Details of Quarry: | (a)Final Void of 282.868 (hectare) at a Depth of 210 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 762.414 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | Trucks | (b)Surface to Siding/Loading | Trucks | (c)Transportation / Conveyor Details | By Rail to STPP | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | AGRICULTURE LAND | | 112.762 | 0 | 112.762 | (2.) | OTHERS(Specify) | Roads and others | 1.765 | 0 | 1.765 | (3.) | GRAZING LAND | | 4.514 | 0 | 4.514 | (4.) | FOREST LAND | | 783.275 | 0 | 783.275 | (5.) | SURFACE WATER BODIES | | 6.892 | 0 | 6.892 | (6.) | WASTE LAND | | 0 | 0 | 0 | (7.) | SETTLEMENTS | | 3.591 | 0 | 3.591 | |
TOTAL | 912.799 | 0 | 912.799 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | EXCAVATION/QUARRY | | 0 | 282.868 | 0 | | 282.868 | (2.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (3.) | VIRGIN AREA | | 0 | 0 | 0 | | 0 | (4.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (5.) | INTERNAL OB DUMPS | | 479.546 | 0 | 0 | | 479.546 | (6.) | ROADS | | 0 | 0 | 0 | | 0 | (7.) | GREEN BELT | | 28.006 | 0 | 0 | | 28.006 | (8.) | Other | garland drain, embankment | 60.668 | 20.818 | 0 | | 81.486 | (9.) | BUILT UP AREA (COLONY/OFFICE) | | 40.893 | 0 | 0 | | 40.893 | |
TOTAL | 609.113 | 303.686 | 0 | 0 | 912.799 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 479.546 | (c)Quarry(in hectare) | 0 | (d)Safety Zone(in hectare) | 45.939 | (e)Final Void of 282.868 (hectare) at a Depth of 210 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 68.302 | (h)Total afforestation plant (in hectare) | 593.787 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 0 | 0 | 0 | 0 | 0 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1922/RA0143, Dated 06.12.2019, | (ii)Name of the EIA Consultant | EPTRI | (iii)Address | EPTRI,91/4 Gachibowli, Hyderabad | (iv)Mobile No. | 9885236493 | (v)Landline No. | 0406756750 | (vi)Email Id | dgeptri@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Coal Mining | (ix)Validity of Accreditation | 29 May 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | 1. Please attach a copy of TOR issued in the project.
2. Feasibility Report is loosly prepared without proper project description, background and title of project being used for the appraisal. Title of project should be added in the FR properly. FR should uploaded in proper pdf form ( that can be copied).
3. Please attach the response of EDS dated 13.05.2019, 14.05.2019, 2905.2019 and 13.06.2019
4. Please also attach proper topo sheet in the scale of 1:50000 | 28 Apr 2021 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Shri G Venkateswara Reddy | Designation | Director (Planning & Projects) | Name of Company (Applicant Name should not be given here) | The Singareni Collieries Company Limited | Address | Kothagudem P.O -507101
Khammam Dt |
|