Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) NAINI COAL MINE (OPENCAST PROJECT)
(b)Name of the Company / Organisation The Singareni Collieries Company Limited
(c)Registered Address M/s. Singareni Collieries Company Limited PO: Kothagudem Collieries - 507 101 Dist: KHAMMAM, T.Sr,,Khammam,Telangana-507101
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Shri G Venkateswara Reddy
(b)Designation (Owner/ Partner/ CEO) Director (Planning & Projects)
(c)Address Kothagudem P.O -507101 Bhadradri Kothagudem District,,,Bhadradri Kothagudem,Telangana-507101
(d)Pin code 507101
(e)E-mail gm_env@scclmines.com
(f)STD Code. 8744(f)Telephone No. 243059
(g)Fax No. 08744244115
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity2(a) Coal washeries
1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/OR/CMIN/102794/2019
(d)Master Proposal Number(Single Window) SW/201731/2021
(e)EAC concerned (for category A Projects only) Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 73 C/16 and Special Topo sheet Nos. L-11 and M-11
(b)Pincode 759124
(c)Bounded Latitudes (North)
From
Degree 210321
Minutes
Second
From
Degree 210523
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 845256
Minutes
Second
From
Degree 845517
Minutes
Second
(e)Survey of India Topo Sheet No. 73 C/16 , L-11 and M-11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 159
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.1
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaAngulChhendipadaCHHENDIPADA
(2.)OrissaAngulChhendipadaKardabahal
(3.)OrissaAngulChhendipada
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11015/49/2019-IA-II(M)
(b)Date of Apply of TOR 13 Jun 2019
(c)Date of Issue of TOR / Standard ToR 26 Nov 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :16 Dec 2020
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :20 Jan 2021
Distance of Public Hearing Venue from the Proposed Project :0.46
Karada Bahal Village, Angul
State :Orissa
District :Angul
Tehsil :Chhendipada
Village :Karada Bahal
204Generation of local employment opportunity, education, drinking water facility, development of village roads, cleaning of village ponds, pension for senior citizen, adequate air pollution control. AdeOthersAdditional District Magistrate (Revenue)
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Opencast Mining10 MTPA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)912.799 ha10OthersMTPARoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 494.30
(b) Funds Allocated for Environment Management (Capital) (in Crores) 20.85
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.71
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 10540
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 10540
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Explosives10540Tons per AnnumPurchase form explosive companiesRoad250 MoUCopy of Linkage
(2.)Water4000Kilo Litre per DayFrom the project itselfOthersPipeline1.0 OthersPumpingCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2019 To 28 Feb 2020
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube634062.5100
(2.)SO2Micro Gram per Meter Cube9.85.69.780
(3.)PM2.5Micro Gram per Meter Cube32.220.432.260
(4.)NOxMicro Gram per Meter Cube15.413.315.480
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l375302501000
(2.)Fluoridemg/l0.850.181.01.5
(3.)Heavy MetalsLeadmg/l000.010
(4.)Total Hardnessmg/l44535200600
(5.)TSSNA0000
(6.)pHNA7.86.98.50
(7.)TDSmg/l12001145002000
    14.3.     No. of Surface Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.27.5A
(2.)DOmg/l6.45.9B
(3.)BODmg/l32B
(4.)OthersTotal ColiformsOthersMPN/100ml540110C
(5.)CODmg/l1814A
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))50.435.255
(2.)Leq(Night)A-weighted decibels(dB(A))41.530.945
    14.5.     No. of Soil Sample Monitored locations : 7
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityMillisiemens per Centimetre0.240.13
(2.)N(Nitrogen)Kilogram per hectare201163
(3.)pH8.37.1
(4.)K(Potassium)Kilogram per hectare371271
(5.)P(Phosphorus)Kilogram per hectare19.710.7
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 26.50 To 4.25
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.11 To 20.35
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. 21-4/2524/OR/MIN/2020, dated 22.07.2020
(f)Date of Issue 22 Jul 2020
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater40001.0Copy of Permission LetterPipelineOthersPumping21-4/2524/OR/MIN/2020, dated 22.07.202022 Jul 20204000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Water pumped out from mine51835183Settling ponds, Slow sand filters and ETPsOthersDischarged into nearby water tanks40001183
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 5183
(b)Total Discharged Water (Kilolitre per Day) 1183
(c)Total Reused Water (Kilolitre per Day) 4000
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Overburden&TopsoilOthersOverburden&Topsoil55124500Tons3.0OthersDumpersOthersStorage in dumps
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube57040.9897.98250
(2.)PM2.5Microgram per Meter Cube32.20.91.934.160
(3.)SO2Microgram per Meter Cube9.80.90.149.9580
(4.)NOxMicrogram per Meter Cube14.506.4420.94120
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00OthersNA0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 12900
(b)Source 132 KV OSTRANSCO electrical sub-station located ne
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) Nil
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 783.275
(b)Private Land (ha.) 111.827
(c)Government Land (ha.) 17.697
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 912.799
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 112.762
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 4.514
(d)Surface Water Bodies (ha.) 6.892
(e)Settlements (ha.) 3.591
(f)Industrial (ha.) 0
(g)Forest (ha.) 783.275
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Road and others 1.765
    Total (ha.) 912.7990
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area762.414
(2.)Safety Zone45.939
(3.)Built Up Area40.893Coal washery,CHP,Roads
(4.)Green belt28.006
(5.)OthersNallah diversion, Garland drains and Embankment35.547
(6.)Township0
Total (ha.) 912.799
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Corridorsnil0Nil
(2.)Critically Polluted Areanil0Nil
(3.)WLSnil0Nil
(4.)NPAnil0Nil
(5.)ESZsnil0Nil
(6.)ESAsnil0Nil
(7.)Wildlife Corridorsnil0Nil
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestKosala RF, Brahmanibil,3.2Nil
(2.)Defence Installationsnil0nil
(3.)Archaeological Sites000
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Under Process(Stage-II)
(b)Legal Status of Forest Land Reserved
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 129.52
(c)Status of Land acquisition if not acquired In process
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 1
(b)No. of Households 14
(c)No. of PDFs (Project Displaced Families) 30
(d)No. of PAFs (Project Affected Families) 640
(e)Funds Allocated for R&R(in INR) (in Lacs) 14198
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Elephant, Indian python, Indian peafowl and Indian Monitor Lizard
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 122 Lakhs
(iii)Period of Implementation 10 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Kudaposi nalla flows from south to north across the project area. Two more seasonal nallas viz., Shiarimalia and Ullani nalla flow across the block towards north and join the Gauduni nalla which flows northern boundary of the block flows from south – west to north – east. . All these are seasonal streams of 3rd and 4th order
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required It is proposed to divert Kudaposi, Shiarimalia and Ullani nallas along the southern boundary of ML and drain into the existing Gauduni nalla. These three streams are planned to be diverted in consulta
(ii)Details of Study Conducted AsK Architects & Builders Pvt. Ltd has prepared D
(c)Whether permission has been obtained from competent authority ? Yes
(i)Uploaded copy of permission Copy of permission
(ii)Letter No. Engineer in Cheif WP BP-41/2011/2 9527
(iii)Date of issue 22 Mar 2021
(iv)Recommendation NA
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area 1. The Gauduni nalla flows along north boundary of ML area. It flows from south – west to north – east. This is the main drainage in the mining lease area. 2.Atundi nallah flowing at a distance of 1.9 km-East
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 0.1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 92
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 1188
(e)No. of working days 330
(f)Total Manpower 1280
32.
Green Belt in Ha:
(a)Total Area of Green Belt 593.78
(b)Percentage of Total Project Area 65.05
(c)No. of Plants to be Planted 1484467
(d)Funds Allocated for Plantation 59300000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialInfrastructure facilities like drinking water supply, sanitation, roads, culverts, community halls, street lighting, Education, Medical, Recreation , Business establishments etc., will be improved in the surrounding villages through CSR activities. Excess mine discharge water will be utilized for irrigation and ground water recharge.
(2.)EnvironmentalOf the total project area of 912.799 ha, 593.787 ha will be reclaimed with plantation by the end of post closure stage. About 210.68 Mm3 volume of the project will be converted in to water body at post closure stage which will augment ground water recharge.
(3.)FinancialDirect and Indirect employment opportunities to local people in contractual works like coal mining operations, civil construction, coal transportation, supply of goods and provision of services to the project and other community services.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)CoalMajor
2.
Mine Capacity in ROM (Run of Mine) 10 MTPA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. No.34011/14/2018-CPAM..
(b)Date of Approval 08 Apr 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Coal
(e)Approved Mining Lease Area 912.799
(f)Approved Capacity 10
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 455.18
(b)Mineable Reserves (Million Ton) 378.64
(c)Extractable Reserves(Million Ton) 340.78
(d)Percent(%) of Extraction 90
(e)Grade of Coal /Ore /Mineral G 10
(f)Stripping Ratio 1 : 2.58
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 1 in 7 to 14
(i)Mining Method Opencast
(j)Life of Mine (Years) 38 years
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area Yes
(b)Beneficiation / Washing Technology Jig & Drum Washing
(c)Capacity 9
(d)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable Yes
(b)No. of seams 22
(c)Thickness of seams to be worked on 137.93
(d)Maximum Thickness of Seams (metres) 35.3
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 912.799
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 18 Jun 2020
(iii)Validity of LOI 43
(iv)Reference No. of LOI Section 11(1) of CBA (A&D) Act, 1957- S.O.467 of M
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 912.799
(iii)Validity of the lease deed From : 15 Feb 2020 To : 14 Feb 2063
(iv)Date of Execution of Mining Lese 15 Feb 2020
(v)Reference Number Section 11(1) of CBA (A&D) Act, 1957- S.O.467 of M
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Initial
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 1
(ii)Total Area (in Hectare) 283.71
(iii)Height (in meter) 120
(iv)Quantity (in Million Cubic meter) 168.57
(v)No. of year back fill up 6
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 1
(ii)Total Area (in Hectare) 479.546
(iii)Height (in meter) 120
(iv)Quantity (in Million Cubic meter) 877.610
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 7.61
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 7.54
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0.07
11.
Details of Final Mine Void:
(a)Area (in Hectare) 282.868
(b)Depth (in meter) 210
(c)Volume (in Million Cubic meter) 210.68
12.
Details of Quarry:
(a)Final Void of 282.868 (hectare) at a Depth of 210 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 762.414
13.
Details of Transportation:
(a)In Pit/Underground to Surface Trucks
(b)Surface to Siding/Loading Trucks
(c)Transportation / Conveyor Details By Rail to STPP
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND112.7620112.762
(2.)OTHERS(Specify)Roads and others1.76501.765
(3.)GRAZING LAND4.51404.514
(4.)FOREST LAND783.2750783.275
(5.)SURFACE WATER BODIES6.89206.892
(6.)WASTE LAND000
(7.)SETTLEMENTS3.59103.591
TOTAL912.7990912.799
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY0282.8680282.868
(2.)EXTERNAL OB DUMPS0000
(3.)VIRGIN AREA0000
(4.)TOP SOIL STORAGE0000
(5.)INTERNAL OB DUMPS479.54600479.546
(6.)ROADS0000
(7.)GREEN BELT28.0060028.006
(8.)Othergarland drain, embankment60.66820.818081.486
(9.)BUILT UP AREA (COLONY/OFFICE)40.8930040.893
TOTAL609.113303.68600912.799
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 479.546
(c)Quarry(in hectare) 0
(d)Safety Zone(in hectare) 45.939
(e)Final Void of 282.868 (hectare) at a Depth of 210 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 68.302
(h)Total afforestation plant (in hectare) 593.787
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA0143, Dated 06.12.2019,
(ii)Name of the EIA Consultant EPTRI
(iii)Address EPTRI,91/4 Gachibowli, Hyderabad
(iv)Mobile No. 9885236493
(v)Landline No. 0406756750
(vi)Email Id dgeptri@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 29 May 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. Please attach a copy of TOR issued in the project. 2. Feasibility Report is loosly prepared without proper project description, background and title of project being used for the appraisal. Title of project should be added in the FR properly. FR should uploaded in proper pdf form ( that can be copied). 3. Please attach the response of EDS dated 13.05.2019, 14.05.2019, 2905.2019 and 13.06.2019 4. Please also attach proper topo sheet in the scale of 1:50000 28 Apr 2021
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShri G Venkateswara Reddy
DesignationDirector (Planning & Projects)
Name of Company (Applicant Name should not be given here)The Singareni Collieries Company Limited
AddressKothagudem P.O -507101 Khammam Dt
Print