Project Details
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? :
No
1.
Project Details
i. Proposal No. :
IA/TN/MIN/18557/2013
ii. MoEFCC File No. :
J-11015/136/2013-IA-II(M)
iii.Short narrative of the project:
Limestone Mine
iv. Project Sector :
Mining Projects
v. Company/Proponent :
M/s Madras Cements Ltd.
vi.Details of State of the project
Details of State of the project
S.no.
State Name
District Name
Tehsil Name
1.
Tamil Nadu
Thoothukkudi
Vilathikulam
vii. Uploaded EC Compliance report by rigional office of MoEFCC:
Annexure-Uploaded EC Compliance report
viii. Certified Monitoring report by RoMoEF:
Annexure-Uploaded Monitoring report
ix.Date of TOR Granted
09 Sep 2013
x.TOR letter issued by Ministry:
Annexure-TOR letter
ix.Date of Submission for EC:
14 Nov 2016
x.Project Type:
Expansion
2.
Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP:
Annexure-EIA/EMP
ii.Risk Assessment:
Annexure-Risk Assessment
iii.Public Hearing:
Annexure-Public Hearing
iv. Date of Public Hearing:
25 Feb 2016
v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC:
Annexure-Additional Report/Study/Document
vi. Uploaded Cover Letter:
Annexure-Cover Letter
vii.Remarks:
Awaiting for latest certified compliance from MoEF&CC, RO, Chennai. Meanwhile ToR extension is requested from MoEF&CC and letter attached.
Additional Attachments, if any
S.no.
Attached File
Date of Submission
1.
Covering Letter & Mining Plan Part-1
28 Sep 2016
2.
Mining Plan Part-2
28 Sep 2016
3.
Mining Plan Part-3
28 Sep 2016
4.
Mining Plan Part-4
28 Sep 2016
5.
Mining Plan Part-5
28 Sep 2016
3.
Additional Detail Sought
Additional Detail Sought
Sno.
ADS Letter
Remarks
Date of ADS
1.
ADS Letter
Additional letter
10 Jan 2017
2.
ADS Letter
Modified Final EIA/EMP report with Latest Certified EC compliance report from MoEF-RO, Chennai vide dated 12.04.2017, NOC for no forest land certificate vide dated 09.02.2017, Pea fowl conservation plan along with flora / fauna list certified by district forest officer, Thoothukudi vide dated 05.04.2017, Health status report, etc.,
25 Apr 2017
3.
NA
Certificate from DFO stating no National Park/ Wild life Sanctuary as per ToR point no.15 is not uploaded. Also, submit authenticated Past production details from State Deptt. of Mines and Geology. The Executed lease deed may also be uploaded.
15 Jun 2017
4.
ADS Letter
Certificate from DFO stating no National Park/ Wild life Sanctuary within 10 km radius (Enclosure - 1), Authenticated Past production details from State Deptt. of Mines and Geology (Enclosure - 2) & The Executed lease deed (Enclosure - 3).
01 Aug 2017
5.
NA
In view of the above, after making detailed deliberations, the Committee deferred the proposal for want of additional information from the PP in respect of the following: • Examination of the proposal in view of the judgement passed by Hon’ble Supreme Court of India on 02.08.2017 in the matter of Common Cause Vs Union of India & Others after submission of details of permissions obtained by it since 1993-94 for mining operations (EC as well as Consent) vis-a-vis year-wise authenticated production figures. • Executed lease deed in support of lease validity till 28.07.2033. • PP to prepare breakup of activities and submit a detailed plan with enhanced budgetary provisions for Enterprise Social Commitment. • PP to provide specific details on plantation and green belt development carried ou
27 Sep 2017
6.
ADS Letter
Additional details sought by EAC in the 22nd EAC meeting held on 18-19 September 2017
10 Oct 2017
7.
NA
PP has not completely replied to the EAC queries. The details of Consents to Operate obtained by the PP in respect of instant M.L. are required to be uploaded.
13 Nov 2017
8.
ADS Letter
We herewith submitting Additional details sought by Member Secretary, MOEF&CC vide e-mail dated 13.11.2017.
04 Dec 2017
9.
ADS Letter
ai
08 Mar 2018
10.
ADS Letter
We are submitting herewith additional documents in respect of Melavenkateswarapuram mine
12 Mar 2018
11.
ADS Letter
ai
16 Apr 2018
12.
ADS Letter
Dear sir, We are submitting herewith additional details of MV Puram mine.
19 Apr 2018
13.
NA
As discussed on Telephone PP wants to upload additional documents.
06 Jun 2018
14.
ADS Letter
Additional Document uploaded
07 Jun 2018
15.
ADS Letter
ai
07 Aug 2018
16.
ADS Letter
Dear Sir, Additional details uploaded
27 Aug 2018
17.
NA
PP vide letter E-mail dated 9/09/2018 mention that they had earlier uploaded partly documents on 27.08.2018 and other documents are ready for uploading now and requesting to provide the link to upload the remaining information on portal. PP is requested to kindly upload all the requisite information in one go.
14 Sep 2018
18.
ADS Letter
Dear Sir, Additional Details are now uploaded in continuation to our earlier letter dated 21.08.2018 which was uploaded on 27.08.2018
14 Sep 2018
4.
Accredited Consultant Details
i. Accreditation status :
Yes
ii. Accreditation No. :
S.No.29 in NABET Accredited list 08,April 2016
iii. Name of Consultant:
Creative Engineers & Consultants
iv. Address :
9B/4, Bharathwajar Street, East Tambaram, Chennai - 59
v. Mobile No.:
9444133619
vi. Landline No.:
04422395170
vii. Email Id:
vssm@ramcocements.co.in
5.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
i. Name of Applicant :
VS Sambasivam
ii. Designation :
DGM -Mines
iii. Name of Company(Applicant Name should not be given here) :
M/S. THE RAMCO CEMENTS LTD
iv. Address :
M/s.The Ramco Cements Ltd. (Formerly Madras Cements Ltd)
v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
NIL