   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/TN/MIN/18557/2013    ii. MoEFCC File No. : J-11015/136/2013-IA-II(M)    iii.Short narrative of the project: Limestone Mine    iv. Project Sector : Mining Projects    v. Company/Proponent : M/s Madras Cements Ltd.
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.Tamil NaduThoothukkudiVilathikulam
 
vii. Uploaded EC Compliance report by rigional office of MoEFCC: Annexure-Uploaded EC Compliance report viii. Certified Monitoring report by RoMoEF: Annexure-Uploaded Monitoring report    ix.Date of TOR Granted 09 Sep 2013 x.TOR letter issued by Ministry: Annexure-TOR letter ix.Date of Submission for EC: 14 Nov 2016 x.Project Type: Expansion
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP: Annexure-EIA/EMP ii.Risk Assessment: Annexure-Risk Assessment iii.Public Hearing: Annexure-Public Hearing    iv. Date of Public Hearing: 25 Feb 2016   v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: Annexure-Additional Report/Study/Document   vi. Uploaded Cover Letter: Annexure-Cover Letter   vii.Remarks: Awaiting for latest certified compliance from MoEF&CC, RO, Chennai. Meanwhile ToR extension is requested from MoEF&CC and letter attached.
Additional Attachments, if any
S.no. Attached File Date of Submission
1. Covering Letter & Mining Plan Part-128 Sep 2016
2. Mining Plan Part-228 Sep 2016
3. Mining Plan Part-328 Sep 2016
4. Mining Plan Part-428 Sep 2016
5. Mining Plan Part-528 Sep 2016
3. Additional Detail Sought
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1. ADS LetterAdditional letter 10 Jan 2017
2. ADS LetterModified Final EIA/EMP report with Latest Certified EC compliance report from MoEF-RO, Chennai vide dated 12.04.2017, NOC for no forest land certificate vide dated 09.02.2017, Pea fowl conservation plan along with flora / fauna list certified by district forest officer, Thoothukudi vide dated 05.04.2017, Health status report, etc., 25 Apr 2017
3.NACertificate from DFO stating no National Park/ Wild life Sanctuary as per ToR point no.15 is not uploaded. Also, submit authenticated Past production details from State Deptt. of Mines and Geology. The Executed lease deed may also be uploaded. 15 Jun 2017
4. ADS LetterCertificate from DFO stating no National Park/ Wild life Sanctuary within 10 km radius (Enclosure - 1), Authenticated Past production details from State Deptt. of Mines and Geology (Enclosure - 2) & The Executed lease deed (Enclosure - 3). 01 Aug 2017
5.NAIn view of the above, after making detailed deliberations, the Committee deferred the proposal for want of additional information from the PP in respect of the following: • Examination of the proposal in view of the judgement passed by Hon’ble Supreme Court of India on 02.08.2017 in the matter of Common Cause Vs Union of India & Others after submission of details of permissions obtained by it since 1993-94 for mining operations (EC as well as Consent) vis-a-vis year-wise authenticated production figures. • Executed lease deed in support of lease validity till 28.07.2033. • PP to prepare breakup of activities and submit a detailed plan with enhanced budgetary provisions for Enterprise Social Commitment. • PP to provide specific details on plantation and green belt development carried ou 27 Sep 2017
6. ADS LetterAdditional details sought by EAC in the 22nd EAC meeting held on 18-19 September 2017 10 Oct 2017
7.NAPP has not completely replied to the EAC queries. The details of Consents to Operate obtained by the PP in respect of instant M.L. are required to be uploaded. 13 Nov 2017
8. ADS LetterWe herewith submitting Additional details sought by Member Secretary, MOEF&CC vide e-mail dated 13.11.2017. 04 Dec 2017
9. ADS Letterai 08 Mar 2018
10. ADS LetterWe are submitting herewith additional documents in respect of Melavenkateswarapuram mine 12 Mar 2018
11. ADS Letterai 16 Apr 2018
12. ADS LetterDear sir, We are submitting herewith additional details of MV Puram mine. 19 Apr 2018
13.NAAs discussed on Telephone PP wants to upload additional documents. 06 Jun 2018
14. ADS LetterAdditional Document uploaded 07 Jun 2018
15. ADS Letterai 07 Aug 2018
16. ADS LetterDear Sir, Additional details uploaded 27 Aug 2018
17.NAPP vide letter E-mail dated 9/09/2018 mention that they had earlier uploaded partly documents on 27.08.2018 and other documents are ready for uploading now and requesting to provide the link to upload the remaining information on portal. PP is requested to kindly upload all the requisite information in one go. 14 Sep 2018
18. ADS LetterDear Sir, Additional Details are now uploaded in continuation to our earlier letter dated 21.08.2018 which was uploaded on 27.08.2018 14 Sep 2018
4. Accredited Consultant Details
   i. Accreditation status : Yes    ii. Accreditation No. : S.No.29 in NABET Accredited list 08,April 2016    iii. Name of Consultant: Creative Engineers & Consultants   iv. Address : 9B/4, Bharathwajar Street, East Tambaram, Chennai - 59   v. Mobile No.: 9444133619   vi. Landline No.: 04422395170   vii. Email Id: vssm@ramcocements.co.in
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : VS Sambasivam    ii. Designation : DGM -Mines    iii. Name of Company(Applicant Name should not be given here) : M/S. THE RAMCO CEMENTS LTD    iv. Address : M/s.The Ramco Cements Ltd. (Formerly Madras Cements Ltd) v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: NIL