EC Report
1. Project Details
   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/IND/HR/23749/2014    ii. MoEFCC File No. : J/11011/268/2014 IA II (I)    iii.Short narrative of the project: Recovery of Styrene at Indian Oil Panipat Refinery & Petrochemical Complex.    iv. Project Sector : Industrial Projects-2    v. Company/Proponent : INDIAN OIL CORPORATION LIMITED. PANIPAT REFINERY & PETROCHEMICAL COMPLEX
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.HaryanaPanipatPanipat
 
vii. Uploaded EC Compliance report by rigional office of MoEFCC: NIL viii. Certified Monitoring report by RoMoEF: Annexure-Uploaded Monitoring report    ix.Date of TOR Granted 28 Nov 2014 x.TOR letter issued by Ministry: Annexure-TOR letter ix.Date of Submission for EC: 20 May 2016 x.Project Type: Expansion
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP: Annexure-EIA/EMP ii.Risk Assessment: Annexure-Risk Assessment iii.Public Hearing: Annexure-Public Hearing    iv. Date of Public Hearing: 23 Aug 2013   v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: Annexure-Additional Report/Study/Document   vi. Uploaded Cover Letter: Annexure-Cover Letter   vii.Remarks: The correction has been made as per the instruction received. TOR for Ethylene Recovery Unit, Mounded Bullet & SRU is attached.
3. Additional Detail Sought
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NAAfter detailed deliberation, Committee sought following additional information: 1) Reasons for high CO in ambient air. 2) Measure the SO2 emissions from the existing unit. Any additional SO2 emission from the proposed unit. 3) Ministry has made certain observations while site visit was conducted for butadiene plant. Action taken report to be submitted. The proposal was deferred till the desired information is submitted and site visit is conducted by the sub-committee of EAC. The above information shall be provided with the uploading of minutes on the website. 16 Aug 2016
2. ADS LetterAs per MOM, the site visit of the sub-committee of EAC-2 is proposed which may be conducted at the earliest. We also request to take up our case in next EAC-2 meeting for Environmental Clearance for the Styrene/Ethylene recovery project at PNCP, Panipat. 12 Sep 2016
4. Accredited Consultant Details
   i. Accreditation status : Yes    ii. Accreditation No. : NABET/EIA/RA020/039    iii. Name of Consultant: Engineers India Limited   iv. Address : Engineers India Limited, Gurgaon   v. Mobile No.: 9818688520   vi. Landline No.: 0124-3802034   vii. Email Id: KARWALDK@INDIANOIL.IN
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : PV Ramakrishna    ii. Designation : GM HS&E    iii. Name of Company(Applicant Name should not be given here) : INDIAN OIL CORPORATION LIMITED. PANIPAT REFINERY & PETROCHEMICAL COMPLEX    iv. Address : PO: PANIPAT REFINERY DISTT: PANIPAT PIN: 132140 v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: NIL