Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Ujh Multipurpose Project
(b)Name of the Company / Organisation CHIEF ENGINEER CID JAMMU
(c)Registered Address 18 C/C Gandhi Nagar Jammu,,Jammu,Jammu and Kashmir-180004
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Jagdish Singh Chib
(b)Designation (Owner/ Partner/ CEO) CE
(c)Address 18 C/C Gandhi Nagar Jammu,,Jammu,Jammu,Jammu and Kashmir-180004
(d)Pin code 180004
(e)E-mail jschib.59@gmail.com
(f)STD Code. 191(f)Telephone No. 2432435
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(c) River Valley projects
Minor Activity
(b)Category A
(c)Proposal Number IA/JK/RIV/84991/2018
(d)Master Proposal Number(Single Window) SW/182479/2020
(e)EAC concerned (for category A Projects only) River Valley and Hydroelectric Projects
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 43P/6,43P/7,43P/10,43P/11
(b)Pincode 184104
(c)Bounded Latitudes (North)
From
Degree 32.5540
Minutes
Second
From
Degree 32.66
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 75.08
Minutes
Second
From
Degree 75.58
Minutes
Second
(e)Survey of India Topo Sheet No. 43/P
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 619
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jammu and Kashmir
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratJamnagarJamnagarSikka
(2.)Jammu and KashmirKathuaBillawar
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-12011/39/2014 -IA I
(b)Date of Apply of TOR 14 Nov 2018
(c)Date of Issue of TOR / Standard ToR 06 Dec 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :21 Jun 2020
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :16 Jul 2020
Distance of Public Hearing Venue from the Proposed Project :0
Mandli
State :Jammu and Kashmir
District :Kathua
Tehsil :Kathua
Village :Mandli
400Demanded renaming of the project as Panjtirthi Ujh Multipurpose Project by keeping in view of the religious aspirations of locals attached with this historic temple. Updation of revenue records to beDeputy Commissioner
(2.)
Date of Advertisement :27 Jul 2020
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :26 Aug 2020
Distance of Public Hearing Venue from the Proposed Project :1
Jatwal
State :Jammu and Kashmir
District :Samba
Tehsil :Samba
Village :Jatwal
60Locals strongly suggested resurveying & shifting of alignment of canal about 1-1.5 kms towards north of already surveyed canal. As per their expressed concerns, only 25% land of their villages will bOthersADM
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Ujh Multipurpose Project196MW
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Hydro Power196Mega Watt(MW)OthersTransmission line
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 5850
(b) Funds Allocated for Environment Management (Capital) (in Crores) 4034.04
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 29.30
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.71
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
c)Notified Eco-sensitive areas Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 24331
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 24331
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)concrete24331Otherscubic mmarketRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Feb 2019 To 01 Oct 2019
(b)Season Three-Sesions
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube52105260
(2.)SO2Micro Gram per Meter Cube7.86.07.880
(3.)NOxMicro Gram per Meter Cube34.511.034.180
(4.)PM10Micro Gram per Meter Cube973594100
    14.2.     No. of Ground Water monitoring locations : 15
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l4020100200
(2.)pHNA8.116.016.58.5
(3.)Heavy Metalsleadmg/l0.100.10.1
(4.)TDSmg/l448825001500
(5.)Chloridesmg/l61.11.822001000
(6.)Total Hardnessmg/l43244200500
(7.)Fluoridemg/l0.54011.5
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.95.1A
(2.)BODmg/l41A
(3.)CODmg/l12.673.13A
(4.)pHNA8.27.36A
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))46.0540.9455
(2.)Leq(Night)A-weighted decibels(dB(A))433545
    14.5.     No. of Soil Sample Monitored locations : 15
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milligram per Kilogram3105.0824
(2.)Electric ConductivityMillisiemens per Centimetre0.280.02
(3.)P(Phosphorus)Milligram per Kilogram65.890.08
(4.)N(Nitrogen)Percent4.050.03
(5.)pH8.416.35
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.48 To 25.47
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.22 To 23.61
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface30000.5Copy of Permission LetterPipelineOthersPHEDDB\2423\2516 May 20204000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)domestic250300SBRDischarge into Surface Water Body250
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 250
(b)Total Discharged Water (Kilolitre per Day) 250
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)solidMunicipal Solid Waste0.7Tons15RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube300.1124560
(2.)PM10Microgram per Meter Cube650.13399100
(3.)SO2Microgram per Meter Cube7.20.11.28.580
(4.)NOxMicrogram per Meter Cube240.12.52780
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000SO20
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 220
(b)Source JKPTCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 680.1
(b)Private Land (ha.) 2441
(c)Government Land (ha.) 1228.9
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 4350
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 29686
(b)Waste/Barren Land (ha.) 27881
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1310
(e)Settlements (ha.) 1108
(f)Industrial (ha.) 0
(g)Forest (ha.) 66532
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : snow 6519
    Total (ha.) 133036.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt50
Total (ha.) 50
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsJASROTA WILDLIFE1CANAL
(2.)WLSJASROTA WILDLIFE1CANAL
(3.)NPANIL15NA
(4.)ESAsNIL16NA
(5.)CorridorsNIL17NA
(6.)Wildlife CorridorsNIL20NA
(7.)Critically Polluted AreaNIL1000NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNIL30NA
(2.)Defence InstallationsNIL30NA
(3.)ForestKATUA0SUBMERGENCE
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? Yes
(i)Status of NBWL NIL
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Under Process(Stage-II)
(b)Legal Status of Forest Land Reserved
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 338286
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 2441
(c)Status of Land acquisition if not acquired YET TO BE ACQUIRED
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 52
(b)No. of Households 5475
(c)No. of PDFs (Project Displaced Families) 3700
(d)No. of PAFs (Project Affected Families) 3700
(e)Funds Allocated for R&R(in INR) (in Lacs) 377650
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 200
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 2850
(d)Temporary Employment- During Operation 100
(e)No. of working days 200
(f)Total Manpower 3200
32.
Green Belt in Ha:
(a)Total Area of Green Belt 50
(b)Percentage of Total Project Area 1.15
(c)No. of Plants to be Planted 50000
(d)Funds Allocated for Plantation 5000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental• Incremental Crop Production • Increase in ground water recharge • Increase in fish production • Industrial water • Drinking Water
(2.)Social• Increased Employment Poverty Eradication/Food security • Risk benefits • Transfer of Technology • Health and Nutrition • Environmental Facility • Tourist Place
(3.)FinancialGeneration of Power Increase in Crop Production
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For River Valley and Hydroelectric Projects
S. No.Item Details
1. Project Sub Sector Multipurpose Project
2. Name of the River Ujh Multipurpose Project
3.
Whether Cumulative Impact Assessment and Carrying Capacity Study of River Basin is Carried Out? No
     4.      Type of Project: (Construction of Dam/ Barrage/ Run of the River/ Lift Irrigation Scheme)
S. No.Project TypeDam Height (in meters)Dam Length (in meters)Total Submergence Area (in hectare)Gross Command Area (GCA) (in hectare)Irrigable Command Area (ICA) (in hectare)Culturable Command Area (CCA) (in hectare)Total Command Area (in hectare)
(1.)Construction of Dam11642034503180086481408431800
5.
Powerhouse Installed Capacity No
(a) Type of Powerhouse Surface
(b) Capacity (in megawatts) 62
(c) No. of Tunnels 2
(d) No. of Units 3
(e) Bank of River Right
6.
Generation of Electricity Annually.
(a) Quantity of Generation of Electricity Annually (in giga watt hours) 238.66
(b) Water Availability at Various percentage
S. No.PercentageWater availability (in cusecs)Dependable yearRemarks
(1.)90 %7381990
(2.)50 %14231992
(3.)75 %10732001
(c) Machine Availability (in percent) 95
(d) Cost of Electricity Generation (in INR) 10140000000
(e) Internal Rate of Return (in percent) 2.69
(f) Year of achievement of Internal Rate of Return 15
7. Catchment Area Treatment Plan Copy of Catchment Plan
8.
Muck Management Plan
(a)Muck Management Plan Copy of Muck Management Plan
(b) Total Excavation Muck (in cubic meter) 1219000
(c) Utilized for Construction (in cubic meter)21000
(d) No. of Muck Disposal sites5
(e) Total Muck Disposal Area (in hectare)30
9.
Fishery Development and Management Plan
(a)Fishery Development and Management Plan Copy of Fishery Development and Management Plan
(b) No. of Fish Species 36
(c) Name of the umbrella Fish Species (Scientific Name)Snow Trout
10.
Status of Environmental Flow
S. No.SeasonAverage Inflow (in cumec)Percent of Flow
(1.)Monsoon31.726
(2.)Lean3.1420
(3.)Non-Lean Non-Monsoon6.2825
11. Free Flow Stretch (in km) 30
12.
Approval of Central Water Commission Yes
(a)Approval Reference No. I/j&K/Hyd-N/98/95/257
(a)Date of Approval 09 Jul 2009
(a)Copy of Approval Copy of approval
13.
Approval of Central Electricity Authority Yes
(a)Approval Reference No. 18/67/2017-HPP&I/1069
(a)Date of Approval 03 Nov 2017
(a)Copy of Approval Copy of approval
14.
Details of Coffer Dam (Upstream) Yes
(a) Quantity of the material (in cubic meter). 160474
(b) Length of the dam (in meter) 195.7
(c) Decommissioning Plan Copy of Decommissioning Plan
15.
Details of Coffer Dam (Downstream) Yes
(a) Quantity of the material (in cubic meter). 46487
(b) Length of the dam (in meter) 143.28
(c) Decommissioning Plan Copy of Decommissioning Plan
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI\NABET\ENV\ACO\20\1500
(ii)Name of the EIA Consultant WAPCOS LIMITED
(iii)Address PLOT 76/C SECTOR 18 GURGAON
(iv)Mobile No. 9811487830
(v)Landline No. 0124239739
(vi)Email Id environment@wapcos.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation River Valley and Hydroelectric Projects
(ix)Validity of Accreditation 09 Apr 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. Public Hearing proceedings of 16th July 2020 is not legible. 2. valid kml file shall be uploaded. 3. Rank of Assistant Commissioner whether equivalent to rank of ADM, who has Chaired the PH on 26.08.2020 may be clarified. 20 Nov 2020
2.NAThe correction have been made as per the instruction received 04 Dec 2020
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterNA 28 Jan 2021
2. ADS Raise LetterPlease the attached letter regarding submission of Stage -1 Forest Clearance 28 Jan 2021
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantJagdish Singh Chib
DesignationCE
Name of Company (Applicant Name should not be given here)CHIEF ENGINEER CID JAMMU
Address18 C/C Gandhi Nagar Jammu