Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) sdf
(b)Name of the Company / Organisation Kali Mandal
(c)Registered Address ,, , ,,East,Delhi-0
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Kali kumar mandal
(b)Designation (Owner/ Partner/ CEO) programmer
(c)Address 55 56 rajat vihar,khora noida,Gandhi Nagar,East,Delhi-123456
(d)Pin code 123456
(e)E-mail rupeshyadav12@gmail.com
(f)STD Code. 11(f)Telephone No. 1234567
(g)Fax No. 11123456
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(b) Offshore and onshore oil and gas exploration, development & production
5(h) Integrated paint industry
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/26591/2013
(d)Master Proposal Number(Single Window) SW/180941/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Modernization
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 1
(b)Pincode 110059
(c)Bounded Latitudes (North)
From
Degree 1
Minutes
Second
From
Degree 1
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 1
Minutes
Second
From
Degree 1
Minutes
Second
(e)Survey of India Topo Sheet No. 1
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1
(j)Seismic Zone 1
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratAhmedabadAhmadabad City5tq4
(2.)GujaratBhavnagarBhavnagar
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number
(c)Date of Issue of TOR 14 Aug 2014
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 09 Sep 2021
(c)Date of Issue of EC 30 Nov 2015
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason sadf
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bangalore
(iii)Letter No. 1
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Oct 7 2020 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)1112Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)11111
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 07 Oct 2020
(iv)Valid Upto 16 Oct 2020
(v)File No. 1
(vi)Application No. 1
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 5
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 3
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
c)Notified Eco-sensitive areas Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? Yes
8.(a) If any Industrial Estate/Complex / Export processing Zones /Special Economic Zones/Biotech Parks / Leather Complex with homogeneous type of industries such as Items 4(d), 4(f), 5(e), 5(f), or those Industrial estates with pre –defined set of activities (not necessarily homogeneous, obtains prior environmental clearance, individual industries including proposed industrial housing within such estates /complexes will not be required to take prior environmental clearance, so long as the Terms and Conditions for the industrial estate/complex are complied with (Such estates/complexes must have a clearly identified management with the legal responsibility of ensuring adherence to the Terms and Conditions of prior environmental clearance, who may be held responsible for violation of the same throughout the life of the complex/estate
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)No Data1Tons per Annum1Rail1 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2020 To 09 Oct 2020
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube12111
(2.)PM10Micro Gram per Meter Cube12111
(3.)NOxNano Gram per Meter Cube12111
(4.)PM2.5Micro Gram per Meter Cube12111
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHmg/l12111
(2.)Chloridesmg/l121111
(3.)TSSmg/l12111
(4.)TDSNA12111
(5.)Fluoridemg/l12111
(6.)Total Hardnessmg/l121111
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l121B
(2.)pHmg/l121A
(3.)DOmg/l121B
(4.)CODmg/l121A
    14.4.     No. of Ambient Noise monitoring locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))1211
(2.)Leq(Day)A-weighted decibels(dB(A))1211
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Millisiemens per Centimetre121
(2.)N(Nitrogen)Milligram per Litre121
(3.)K(Potassium)Millisiemens per Centimetre121
(4.)pHMillisiemens per Centimetre121
(5.)Electric ConductivityMillisiemens per Centimetre121
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1 To 1
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1 To 1
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. 1
(f)Date of Issue 29 Sep 2020
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface11Copy of Permission LetterPipelineBarrage115 Oct 20201
15.1.
(a)Whether Desalination is proposed Yes
(b)Desalination Capacity (KLD) 1
(c)Quantity of Brine (KLD) 1
(d)Mode of Disposal of Brine 1
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)1111Discharge into Surface Water Body1
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1
(b)Total Discharged Water (Kilolitre per Day) 1
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)1Industrial Waste1Tons1RailTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube11131
(2.)SO2Microgram per Meter Cube11131
(3.)PM10Microgram per Meter Cube11141
(4.)PM2.5Microgram per Meter Cube11141
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)11111PM101
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1
(b)Source 1
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1
(e)Stack Height (in m) 1
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 1
(b)Private Land (ha.) 1
(c)Government Land (ha.) 1
(d)Revenue Land (ha.) 1
(e)Other Land (ha.) 1
    Total Land (ha.) 5
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 1
(b)Waste/Barren Land (ha.) 1
(c)Grazing/ Community Land (ha.) 1
(d)Surface Water Bodies (ha.) 1
(e)Settlements (ha.) 1
(f)Industrial (ha.) 11
(g)Forest (ha.) 1
(h)Mangroves (ha.) 11
(i)Marine Area (ha.) 11
(j)Others (ha.) : 1 1
    Total (ha.) 40.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant11
Total (ha.) 1
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAs11111
(2.)WLS1111
(3.)NPA1111
(4.)ESZs111
(5.)Corridors1111
(6.)Critically Polluted Area1111
(7.)Wildlife Corridors1111
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forest111
(2.)Archaeological Sites111
(3.)Defence Installations1111
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 1
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1
(b)Land yet to be acquired(Ha) 1
(c)Status of Land acquisition if not acquired 1
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 1
(b)No. of Households 1
(c)No. of PDFs (Project Displaced Families) 1
(d)No. of PAFs (Project Affected Families) 11
(e)Funds Allocated for R&R(in INR) (in Lacs) 1
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species 1
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 1
(iii)Period of Implementation 1
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. 1
(iii)Date of issue 08 Oct 2020
(iv)Recommendation 1
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area 1
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required 1
(ii)Details of Study Conducted 1
(c)Whether permission has been obtained from competent authority ? Yes
(i)Uploaded copy of permission Copy of permission
(ii)Letter No. 11
(iii)Date of issue 13 Oct 2020
(iv)Recommendation 1
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area 1
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 60
(b)Permanent Employment-During Operation 2
(c)Temporary Employment- During Construction 2
(d)Temporary Employment- During Operation 3
(e)No. of working days 1
(f)Total Manpower 67
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt112
(2.)Percentage of Total Project Area112
(3.)No. of Plants112
(4.)Funds Allocated11112
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmentaltg
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court Districts Courts
(c)Name of the Sub Court Allahabad
(d)Case No. 1
(e)Orders/Directions of the court ,if any and its relevance with the proposed project 1
(f)Case Details 1
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? Yes
(b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act 1
(c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Copy of Direction Issued
(d)Compliance status of the directions 1
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 1
(ii)Name of the EIA Consultant 1
(iii)Address 1
(iv)Mobile No. 8499838909
(v)Landline No. 1
(vi)Email Id abc12@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 01 Oct 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) Copy of Uploaded Proposal Presentation
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKali kumar mandal
Designationprogrammer
Name of Company (Applicant Name should not be given here)Kali Mandal
AddressDelhi
Print