1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) ESTABLISHMENT OF 120 KLD MOLASSES BASED DISTILLERY ALONG WITH CO GEN POWER – 7 MW, VILLAGE: MAWANA KALAN, BLOCK: MAWANA, DISTRICT: MEERUT, (U.P.) OF M/S MAWANA SUGAR WORKS, DISTILLERY DIVISION.
(b)Name of the Company / Organisation MAWANA SUGARS LIMITED DISTILLERY DIVISION
(c)Registered Address 5th Floor, Kirti Mahal, 19. Rajendra Place, New Delhi - 110125,,Meerut,Uttar Pradesh-110125
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant RK Gangwar
(b)Designation (Owner/ Partner/ CEO) ED
(c)Address Mawana Sugars Limited, Mawana, Block Mawana Kalan, Distt Meerut,,Mawana,Meerut,Uttar Pradesh-845105
(d)Pin code 845105
(e)E-mail brajeshsrivastav@mawanasugars.com
(f)STD Code. 9910(f)Telephone No. 99104439
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity
(b)Category A
(c)Proposal Number IA/UP/IND2/98046/2019
(d)Master Proposal Number(Single Window) SW/179623/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 3021, 3036/2, 3037, 3035/4, 3021/2, 3022, 3023, 30
(b)Pincode 250401
(c)Bounded Latitudes (North)
From
Degree 29.089491
Minutes
Second
From
Degree 29.093405
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 77.927012
Minutes
Second
From
Degree 77.928429
Minutes
Second
(e)Survey of India Topo Sheet No. 53G/16, 53K/4
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 232
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 11.10
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Uttar PradeshMeerutMawana
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/64/2019-IA-II(I)
(b)Date of Apply of TOR 04 Mar 2019
(c)Date of Issue of TOR / Standard ToR 12 Mar 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :12 Nov 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :18 Dec 2019
Distance of Public Hearing Venue from the Proposed Project :0.0
At Proposed project site
State :Uttar Pradesh
District :Meerut
Tehsil :Mawana
Village :Mawana Kalan
96People asked question about Air Pollution, Sewage Treatment plant and Employment opportunities with local people.OthersA.D.M.
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Molasses Based distillery plant160 KLD
(2.)Co-generation Power Plant7 MW
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Rectified Spirit (RS) / ENA/ Ethanol (AA)160Kilo Litre per DayRoad
(2.)Power7Mega Watt(MW)OthersCables
(3.)By Products CO290OthersTon Per DayRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 160
(b) Funds Allocated for Environment Management (Capital) (in Crores) 45
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.9
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 4.5
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 197100
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 197100
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Bagasse as fuel for co generation power plant74460Tons per AnnumAdjacent / Nearby Sugar MillsRoad,Conveyor Belt250 Open MarketCopy of Linkage
(2.)Molasses as raw material for distillery197100Tons per AnnumNearby Sugar MillsRoad500 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube13.838.7913.5380
(2.)NOxMicro Gram per Meter Cube16.1211.4916.0580
(3.)PM10Micro Gram per Meter Cube91.273.390.4100
(4.)PM2.5Micro Gram per Meter Cube51.1938.4550.6360
(5.)OthersCOMicro Gram per Meter Cube0.240.160.232
    14.2.     No. of Ground Water monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)Total Hardnessmg/l268204200600
(3.)Heavy MetalsIron as Femg/l0.190.00.30.3
(4.)Fluoridemg/l0.450.271.01.5
(5.)Chloridesmg/l38.028.02501000
(6.)TDSmg/l498392.65002000
(7.)pHNA7.77.56.58.5
    14.3.     No. of Surface Water monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.44.7D
(2.)pHNA7.77.3D
(3.)CODmg/l60.217.4D
(4.)BODmg/l14.75.7D
    14.4.     No. of Ambient Noise monitoring locations : 08
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))61.848.465
(2.)Leq(Night)A-weighted decibels(dB(A))51.140.455
    14.5.     No. of Soil Sample Monitored locations : 08
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.77.5
(2.)K(Potassium)Milligram per Kilogram88.458.2
(3.)N(Nitrogen)Milligram per Kilogram28.7623.24
(4.)P(Phosphorus)Milligram per Kilogram146112
(5.)Electric ConductivityMilligram per Kilogram350268
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 16.21 To 6.81
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 13.62 To 6.11
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater7200.2Copy of Permission LetterPipelineTube WellCGWA/NOC/IND/ORIG/2019/665218 Nov 2019720
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial (Fermentation and Distillation)9381150CPU (Anaerobic, aerobic, filters and RO)Reuse within the Plant & Recycling938
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 938
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 938
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Domestic wasteMunicipal Solid Waste12.50Tons0RoadOthersComposting within industrial premises
(2.)AshFly Ash25806Tons1RoadOtherswill be used as manure.
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube51.198020.4151.6060
(2.)NOxMicrogram per Meter Cube16.126080.3616.4980
(3.)PM10Microgram per Meter Cube91.208210.5191.72100
(4.)SO2Microgram per Meter Cube13.836502.8416.6880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)47 TPH Incineration BoilerConc. Spent Wash and Bagasse753.2PM1030
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 3750
(b)Source In house generation
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1000 KVA (01No)
(e)Stack Height (in m) 75
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0.00
(b)Private Land (ha.) 4.88
(c)Government Land (ha.) 0.00
(d)Revenue Land (ha.) 0.00
(e)Other Land (ha.) 0.00
    Total Land (ha.) 4.88
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 28262.3
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 116.4
(d)Surface Water Bodies (ha.) 198.2
(e)Settlements (ha.) 1251.9
(f)Industrial (ha.) 42
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Other like Deciduous, plantation, Fallow 1531.2
    Total (ha.) 31402.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt1.61
(2.)Main Plant2.19
(3.)OthersStorage, Office., Open, Road1.08
Total (ha.) 4.88
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNot applicable0No ESAs within 10 km radius
(2.)CorridorsNot applicable0No Corridor within 10 km radius
(3.)WLSHastinapur WLS8.52As per draft gazzette MOEFCC dated 02 Feb 2018
(4.)ESZsHastinapur Wildlife Sanctuary5.6As per draft gazzette MOEFCC dated 02 Feb 2018
(5.)Critically Polluted AreaNot applicable0No CPA within 10 km radius
(6.)NPANot applicable0No NPA within 10 km radius
(7.)Wildlife CorridorsNot applicable0No Wildlife Corridor within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNot applicable0No forest within 10 km radius
(2.)Defence InstallationsNot applicable0No defence installations within 10 km radius
(3.)Archaeological SitesNot applicable0No Archaeological sites within 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 4.88
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Peafowl (Pavo cristatus) & Indian Monitor Lizard (Varanus bengalensis)
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 17.86
(iii)Period of Implementation 4 year
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Ganga Canal
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 0.86
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 4
(b)Permanent Employment-During Operation 125
(c)Temporary Employment- During Construction 120
(d)Temporary Employment- During Operation 250
(e)No. of working days 365
(f)Total Manpower 499
32.
Green Belt in Ha:
(a)Total Area of Green Belt 1.61
(b)Percentage of Total Project Area 32.99
(c)No. of Plants to be Planted 2415
(d)Funds Allocated for Plantation 5000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialImproved livelihood with increased business opportunities.
(2.)EnvironmentalProject will contribute in Ethanol blending program (EBP) driven by Govt of India.
(3.)SocialEmployment generation & CER activity
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/IA0050
(ii)Name of the EIA Consultant Environmental & Technical Research Centre
(iii)Address 4/57, Vipul Khand, Gomtinagar, Lucknow
(iv)Mobile No. 9005554942
(v)Landline No. 9897674227
(vi)Email Id ETRCLT@yahoo.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 18 Aug 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRK Gangwar
DesignationED
Name of Company (Applicant Name should not be given here)MAWANA SUGARS LIMITED DISTILLERY DIVISION
Address5th Floor, Kirti Mahal, 19. Rajendra Place, New Delhi - 110125