Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Metarolls Ispat Pvt. Ltd.
(b)Name of the Company / Organisation M/S. METAROLLS ISPAT PVT. LTD.
(c)Registered Address Gunta no 48, Village Daregaon, Adjacent to MIDC Phase II, Tehsil Jalna, District Jalna, Maharashtra State,,Jalna,Maharashtra-431213
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant DB Soni
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Daregaon, Adjacent to MIDC Phase II, Jalna, Maharashtra,,Jalna,Jalna,Maharashtra-431213
(d)Pin code 431213
(e)E-mail metarollsispat@gmail.com
(f)STD Code. 40(f)Telephone No. 23816222
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/IND/178253/2018
(d)Master Proposal Number(Single Window) SW/178244/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Gut No. 48
(b)Pincode 431203
(c)Bounded Latitudes (North)
From
Degree 195021.18
Minutes
Second
From
Degree 195022
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 755047
Minutes
Second
From
Degree 755048
Minutes
Second
(e)Survey of India Topo Sheet No. 47M13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 508
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 5.0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number F. No. IA- J-11011/292/2018-IA.II(I)
(b)Date of Apply of TOR 15 Sep 2018
(c)Date of Issue of TOR / Standard ToR 13 Dec 2018
(d)Date of Apply of EC 12 Aug 2014
(e)Date of Issue of EC 30 Sep 2014
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :13 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :15 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :0
Near Project Site
State :Maharashtra
District :Jalna
Tehsil :Jalna
Village :Daregaon
1321. Development of Greenery in surrounding area 2. To conduct Training development Program 3. providing the employment to the local persons 4. Air Pollution related issues 5. Management of SlagDistrict Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. EC-997/RON/2019-NGP/5499
(iv)Status of Compliance Partially Complied
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 2 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)TMT Bars158400570000728400Tons per Annum(TPA)Road
(2.)Billets158400570000728400Tons per Annum(TPA)Road,Conveyor Belt
(3.)FerroAlloys02150021500Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Furnace25 TPH and 28 TPH2 nos 40 TPH and 50 TPH2 nos 40 TPH and 50 TPH
(2.)EAF09 MVA9 MVANew
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 16 Aug 2018
(iv)Valid Upto 31 May 2023
(v)File No. (vi)Application No. BO/JD(APC)/UAN NO 0000042822/R
(vi)Application No. (vi)Application No. BO/JD(APC)/UAN NO 0000042822/R
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 200
(b) Funds Allocated for Environment Management (Capital) (in Crores) 10.0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.85
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 598143
(b)Existing quantity of raw material/fuel 166257
(c)Total quantity of raw material/fuel 764400
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Scrap438480Tons per AnnumLocal MarketRoad50 Open MarketCopy of Linkage
(2.)Sponge Iron310800Tons per AnnumLocal MarketRoad100 Open MarketCopy of Linkage
(3.)Mineral15120Tons per AnnumLocal MarketRoad100 Open MarketCopy of Linkage
(4.)Ore for Ferro62040Tons per AnnumLocal MarketRoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Sep 2020 To 30 Sep 2020
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube14.39.314.380
(2.)PM2.5Micro Gram per Meter Cube29.714.229.760
(3.)PM10Micro Gram per Meter Cube71.437.269.4100
(4.)NOxMicro Gram per Meter Cube21.312.221.280
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Heavy MetalsFemg/l0.160.020.30
(2.)pHNA7.116.776.58.5
(3.)Total Hardnessmg/l365215200600
(4.)Fluoridemg/l0.60.31.01.5
(5.)TDSmg/l8987185002000
(6.)TSSmg/l12600
(7.)Chloridesmg/l287.5142.42501000
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.137.56D
(2.)CODmg/l4515D
(3.)BODmg/l12.05.0D
(4.)DOmg/l5.34.5D
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))67.347.375
(2.)Leq(Night)A-weighted decibels(dB(A))63.840.770
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare15.311
(2.)Electric ConductivityCentimeter per Second571512
(3.)pH7.47.1
(4.)N(Nitrogen)Kilogram per hectare228.2209
(5.)K(Potassium)Kilogram per hectare157138
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 16.20 To 3.84
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.05 To 14.65
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersOwn Water Reservoir4151.5Copy of Permission LetterPipelineOthersPipe LineNIL03 Aug 2020415
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sewage3640MBBRReuse within the Plant & Recycling36
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 36
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 36
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Induction Furnace SlagIndustrial Waste22680Tons50RoadOthersBricks Manufacturing
(2.)EAF SlagIndustrial Waste14850Tons50RoadOthersCement industry
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube02.000.180
(2.)PM2.5Microgram per Meter Cube02.000.160
(3.)PM10Microgram per Meter Cube71.42.01.172.51100
(4.)NOxMicrogram per Meter Cube21.303.124.4180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Stack 3Electricity351.5PM100.71
(2.)Stack 3Electricity351.5NOx3.53
(3.)Stack2Electricity351.5PM100.71
(4.)Stack 4Electricity351.5PM100.71
(5.)stack2Electricity351.5NOx3.53
(6.)StackElectricity351.5NOx3.53
(7.)StackElectricity351.5PM100.71
(8.)Stack 4Electricity351.5NOx3.53
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 55000
(b)Source State Electricity Board
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1500 kv
(e)Stack Height (in m) 12.5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 7.71
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 7.71
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 7.71
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 7.7100
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersIndustrial Use7.71
Total (ha.) 7.71
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSnone0nil
(2.)ESAsnone0nil
(3.)Corridorsnone0nil
(4.)Critically Polluted Areanone0nil
(5.)Wildlife Corridorsnone0nil
(6.)NPAnone0nil
(7.)ESZsnone0nil
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestDaregaon1.5Reserve Forest
(2.)Archaeological Sitesnone0nil
(3.)Defence Installationsnone0nil
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 7.71
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Moti Pond
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 4.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 100
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 100
(e)No. of working days 330
(f)Total Manpower 400
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt2.5302.53
(2.)Percentage of Total Project Area33033
(3.)No. of Plants182844976325
(4.)Funds Allocated00.50.5
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialProposed project will provide the employment to local persons
(2.)EnvironmentalAdvance pollution equipment will be installed to control the pollution load within prescribed limits
(3.)FinancialProposed Expansion will help to uplift the financial condition of the surrounding area
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET / EIA/1821/ RA 0120
(ii)Name of the EIA Consultant Paramarsh (Servicing Environment & Development)
(iii)Address B 1/67, Sector - G, Jankipuram, Lucknow-226021, UP
(iv)Mobile No. 9336348520
(v)Landline No. 0522430746
(vi)Email Id paramarsh.env@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 01 May 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAYou are requested to submit the copy of document in support of the competence/authority of the person making this application i.e., Shri.D.B.Soni. 13 Oct 2020
2. Eds Reply LetterThe correction have been made as per the instruction received 16 Oct 2020
3. Eds Reply LetterThe correction have been made as per the instruction received 16 Oct 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDB Soni
DesignationDirector
Name of Company (Applicant Name should not be given here)M/S. METAROLLS ISPAT PVT. LTD.
AddressGunta no 48, Village Daregaon, Adjacent to MIDC Phase II, Tehsil Jalna, District Jalna, Maharashtra State