Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Residential Project with Retail shops
(b)Name of the Company / Organisation PRAKHHYAT DWELLINGS LLP
(c)Registered Address 803/804, Silver Court, BPS Compound, Devidayal Road, Mulund (West), Mumbai.,,Mumbai (Suburban),Maharashtra-400080
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rajib Das
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address 5th Floor, Godrej One, Pirojshanagar, Eastern Express Highway, Vikhroli (E), Mumbai,,,Mumbai (Suburban),Maharashtra-400079
(d)Pin code 400079
(e)E-mail milind.shelar@godrejproperties.com
(f)STD Code. 22(f)Telephone No. 61695500
(g)Fax No. 02241229777
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(b) Townships and Area Development projects.
Minor Activity
(b)Category B1
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/MH/NCP/177871/2015
(d)Master Proposal Number(Single Window) SW/177868/2020
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. S. Nos. 128/3/1, 128/3/2, 128/3/4, 128/3/5, 129/1
(b)Pincode 421308
(c)Bounded Latitudes (North)
From
Degree 191617.02
Minutes
Second
From
Degree 191625.86
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73454.02
Minutes
Second
From
Degree 73455.09
Minutes
Second
(e)Survey of India Topo Sheet No. 47E/03, 47E/04, 47A/15, 47A/16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 6210
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3.00
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number SEIAA-EC-0000001901
(b)Date of Apply of TOR 05 Dec 2015
(c)Date of Issue of TOR / Standard ToR 12 Apr 2016
(d)Date of Apply of EC 01 Dec 2018
(e)Date of Issue of EC 23 Jul 2019
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Construction project
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. EC-1041/RON/2019-NGP/7248
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 29 2020 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Total Construction Built up area272374.0025382.61297756.61Otherssq.mt.OthersBuilding materials and equipments by road
(2.)Total Construction Built up area272374.0025382.61297756.61Otherssq.mt.OthersBuilding materials and equipments by road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Total Construction Built up area272374.0025382.61297756.61Design change in few buildings
(2.)TOTAL CONSTRUCTION BUILT UP AREA272374.0025382.61297756.61Design change in few buildings
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 07 Oct 2020
(iv)Valid Upto 07 Oct 2020
(v)File No. --
(vi)Application No. construction not yet started
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 750
(b) Funds Allocated for Environment Management (Capital) (in Crores) 9.39
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 7.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.14
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Bricks61608Tons per AnnumLocal MarketRoad500 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube55384460
(2.)NOxMicro Gram per Meter Cube42262980
(3.)PM10Micro Gram per Meter Cube857479100
(4.)SO2Micro Gram per Meter Cube32202480
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l3083085002000
(2.)pHNA7.67.66.58.5
(3.)TSSmg/l2.52.500
(4.)Total Hardnessmg/l162162200600
(5.)Heavy MetalsIronmg/l000.30.3
(6.)Chloridesmg/l56562501000
(7.)Fluoridemg/l0011.5
    14.3.     No. of Surface Water monitoring locations : 12
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.76.5D
(2.)CODmg/l7248E
(3.)DOmg/l6.11.8D
(4.)BODmg/l2250E
    14.4.     No. of Ambient Noise monitoring locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))60.953.655
(2.)Leq(Night)A-weighted decibels(dB(A))50.144.345
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.37.3
(2.)P(Phosphorus)Kilogram per hectare103103
(3.)K(Potassium)Milligram per Kilogram7575
(4.)N(Nitrogen)Kilogram per hectare362362
(5.)Electric ConductivityMillisiemens per Centimetre1.101.10
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.8 To 1.9
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.8 To 1.9
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersBNCMC15970Copy of Permission LetterPipelineOthersPipeline--12 Feb 20191597
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Treated sewage18682420MBBROthersReuse for secondary requirement944924
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1868
(b)Total Discharged Water (Kilolitre per Day) 924
(c)Total Reused Water (Kilolitre per Day) 944
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)BiodegradableMunicipal Solid Waste1163Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Non BiodegradableMunicipal Solid Waste1746Tons0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)Others(Specify)COMicrogram per Meter Cube1500010016104000
(2.)PM10Microgram per Meter Cube740377.1100
(3.)SO2Microgram per Meter Cube2001030.180
(4.)NOxMicrogram per Meter Cube2601036.180
(5.)PM2.5Microgram per Meter Cube380139.160
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG setDiesel6100PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 20390
(b)Source Torrent Power Limited
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1 DG set of 750 kVA, 1 DG set of 200 kVA, 1 DG set
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 8.929
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 8.929
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 8.929
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 8.9290
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersBuilding Construction project8.929
Total (ha.) 8.929
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Wildlife CorridorsNA0--
(2.)NPANA0--
(3.)ESZsNA0--
(4.)CorridorsNA0--
(5.)WLSTungareshwar Wildlife Sanctuary10--
(6.)Critically Polluted AreaNA0--
(7.)ESAsNA0--
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestReserved Forest Near Valshinda2.00--
(2.)Defence InstallationsNA0--
(3.)Archaeological SitesDurgadi Fort5.00--
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 243
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 8.9
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Land completely acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Ulhas River, Diva-Mumbra creek, BetawadeLake, Kathpada Lake, Kala Talao, Kamvadi River, Varaladevi Talao, KDMC Bhoiwada Talao and Karivali Talao
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 10
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 0
(e)No. of working days 30
(f)Total Manpower 150
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt02066920669
(2.)Percentage of Total Project Area02525
(3.)No. of Plants012151215
(4.)Funds Allocated0113.68113.68
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialResidential development with Shops
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 94.00
(b)Total No. of Flats to be Build 4122
(c)No. of Buildings 12
(d)Total plot area (sqm) 89290.00
(e)Total built up area (sqm) 297756.61
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 2
(b)Capacity 410
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 4W: 1832, 2W: 100
5.
Energy Saving Measures:
(a)Source/Mode Torrent power Ltd.
(b)Percentage 20
(c)Quantity 16312
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Details given in Chapter 3 of EIA report
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA 0094
(ii)Name of the EIA Consultant ULTRA TECH
(iii)Address 224-225, Jai Commercial Complex, Eastern Express Highway, Opp. Cadbury, Khopat, Thane (West) - 400 601
(iv)Mobile No. 8992900073
(v)Landline No. 022253427
(vi)Email Id dipti@ultratech.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 22 Sep 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. Please submit the copy of certified compliance report. 2. please submit a copy of valid accreditation of consultant. 12 Oct 2020
2.NAThe correction have been made as per the instruction received 03 Nov 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRajib Das
DesignationPartner
Name of Company (Applicant Name should not be given here)PRAKHHYAT DWELLINGS LLP
Address803/804, Silver Court, BPS Compound, Devidayal Road, Mulund (West), Mumbai.