1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed 14.5 MW Coal based Captive Co-generation Power Plant within the existing facility at Village Puthukkadu, Kokkarakondi, Pirivu, Puthupeerkadavu, Taluk Sathyamangalam, District Erode, Tamil Nadu by M/s Sri Andal Paper Mill Pvt. Ltd | (b)Name of the Company / Organisation | SRI ANDAL PAPER MILLS PVT LTD (POWER PLANT) | (c)Registered Address | 548/2.3,4PUTHUKKADUKOKKARAKONDI PIRIVU,PUTHUPEERKADAVU,SATHAYAMANGALAM,ERODE,,Erode,Tamil Nadu-638451 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | SUBRAMANIAM P | (b)Designation (Owner/ Partner/ CEO) | MANAGING DIRECTOR | (c)Address | 548/2,3,4,PUTHUKKADU,KOKKARAKONDI PIRIVU,PUTHUPEERKADAVU,SATHAYAMANGALAM,ERODE,,Sathyamangalam,Erode,Tamil Nadu-638451 | (d)Pin code | 638451 | (e)E-mail | apm302020@gmail.com | (f)STD Code. | 4295(f)Telephone No. | 243277 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(d) Thermal Power Plants
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/TN/THE/140843/2020 | (d)Master Proposal Number(Single Window) | SW/177807/2020 | (e)EAC concerned (for category A Projects only) | Thermal Projects | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 533/1,534/4,540/8 and 541/1 | (b)Pincode | 638011 | (c)Bounded Latitudes (North) | | From | | Degree | 11.500207 | Minutes | | Second | | From | | Degree | 11.500244 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 11.499293 | Minutes | | Second | | From | | Degree | 77.136197 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 58A/14, 58A/15, 58E/2, 58E/3 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 270 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1.15 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Tamil Nadu | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Tamil Nadu | Erode | Sathyamangalam | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | 13012/02/2020-IA.I(T) | (b)Date of Apply of TOR | 05 Feb 2020 | (c)Date of Issue of TOR / Standard ToR | 13 Apr 2020 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 15 Dec 2020 | Distance of Public Hearing Venue from the Proposed Project : | 5 |
| Sri Bannariamman Thirumanamandapam, Thottampalayam, Sathyamangalam Taluk, Erode district, Tamil Nadu | State : | Tamil Nadu | District : | Erode | Tehsil : | Sathyamangalam | Village : | Thottampalayam |
| 111 | Expanding CSR Activities in the region,
Not to discharge any wastewater outside the premisis, Employment opportunities to the local people | District Collector | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Thermal Power Plant | 1 X 14.5 MW | 100 TPH at 105 kg/cm2 working pressure | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Power | 14.5 | Mega Watt(MW) | | Others | Internal application | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 14 May 2018 | (iv)Valid Upto | 31 Mar 2023 | (v)File No. | 1808212739756 | (vi)Application No. | T1/TNPCB/F.0099PND/RM/PND/A/2018 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 55 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 7 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.55 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.1 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | a)Protected areas notified under the wildlife (Protection) Act, 1972 | Yes | c)Notified Eco-sensitive areas | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 450 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 450 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Coal | 450 | Others | TPD | Imported Coal (Indonesian) | Road | | 392 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 15 May 2020 To 14 Aug 2020 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 30.9 | 14.0 | 30.5 | 80 | (2.) | PM10 | | Micro Gram per Meter Cube | 90.7 | 30.1 | 89.7 | 100 | (3.) | SO2 | | Micro Gram per Meter Cube | 19.7 | 7.1 | 19.6 | 80 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 55.4 | 16.7 | 48.9 | 60 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Fluoride | | | mg/l | | 1.1 | 0.1 | 1 | 1.5 | (2.) | Heavy Metals | | IRON | mg/l | | 0.05 | 0.05 | 1 | 1 | (3.) | pH | | | Others | No. | 7.8 | 7 | 6.5 | 8.5 | (4.) | TSS | | | mg/l | | 5 | 5 | 5 | 5 | (5.) | TDS | | | mg/l | | 989 | 271 | 500 | 2000 | (6.) | Total Hardness | | | mg/l | | 308 | 92 | 200 | 600 | (7.) | Chlorides | | | mg/l | | 151 | 40 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | COD | | mg/l | | 8.6 | 7.5 | A | (2.) | pH | | Others | No | 7.3 | 6.8 | A | (3.) | BOD | | mg/l | | 2 | 2 | A | (4.) | DO | | mg/l | | 6.3 | 6.2 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 65.11 | 47.84 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 58.6 | 47.29 | 45 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | No | 7.9 | 6.6 | (2.) | Electric Conductivity | Others | µS/Cm | 1806 | 77 | (3.) | N(Nitrogen) | Milligram per Kilogram | | 1 | 1 | (4.) | P(Phosphorus) | Percent | | 0.32 | 0.07 | (5.) | K(Potassium) | Percent | | 0.27 | 0.11 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.65 To 14.9 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1 To 20.7 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 297 | 1.2 | Copy of Permission Letter | Pipeline | | Intake Well | | S7(1)/72908/OT.V/1996 | 20 Aug 2019 | 1500 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Cooling tower blow down | 5 | 6300 | Will be treated in the existing ETP with ZLD system | Reuse within the Plant & Recycling | | 5 | | (2.) | DM Regeneration | 40 | 6300 | Will be treated in the existing ETP with ZLD system | Reuse within the Plant & Recycling | | 40 | | (3.) | Boiler blowdown | 24 | 0 | Collection and Direct Reuse for ash quenching | Reuse within the Plant & Recycling | | 24 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 69 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 69 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Used/Spent Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1 | Tons | 50 | Road | | Authorized Recyclers | | (2.) | Boiler Ash | Fly Ash | | 14850 | Tons | 50 | Road | | Others | Cement and Brick Manufacturing | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 31.9 | 1.8 | 0.0 | 32 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 30.9 | 1.8 | 1.6 | 32.51 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 90.7 | 1.98 | 0.5 | 91.21 | 100 | (4.) | NOx | | Microgram per Meter Cube | 19.7 | 1.8 | 1.6 | 21.31 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Imported Coal from Indonesia | Imported Coal | 70 | 1.75 | PM10 | | 3.46 kg/hr | (2.) | Imported Coal from Indonesia | Imported Coal | 70 | 1.75 | SO2 | | 11.54 kg/hr | (3.) | Imported Coal from Indonesia | Imported Coal | 70 | 1.75 | NOx | | 41.25 kg/hr | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 14500 | (b)Source | Captive | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 1000kva | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 4.86 | Total Land (ha.) | 4.86 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 4.86 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 4.8600 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0.607 | | (2.) | Others | Fly ash silos and coal storage area | 0.12 | | (3.) | Green belt | | 1.604 | | (4.) | Built Up Area | | 2.529 | Roads and walkways and vacant area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Corridors | NA | 0 | na | (2.) | WLS | Sathyamangalam Tiger reserve | 2.15 | NA | (3.) | Critically Polluted Area | NA | 0 | NA | (4.) | NPA | Sathyamangalam Tiger reserve | 2.15 | NIL | (5.) | ESAs | NA | 0 | NA | (6.) | ESZs | Sathyamangalam Tiger Reserve Eco Sensitive Zone | 1.36 | NIL | (7.) | Wildlife Corridors | Sathyamangalam Tiger reserve | 2.15 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Velamundi (R.F.) | 6 | 0 | (2.) | Others | River | Bhavani River | 1.75 | NIL | (3.) | Archaeological Sites | | NA | 0 | NA | (4.) | Defence Installations | | na | 0 | na | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | | (b)No. of Households | | (c)No. of PDFs (Project Displaced Families) | | (d)No. of PAFs (Project Affected Families) | | (e)Funds Allocated for R&R(in INR) (in Lacs) | | (f)Status of R&R | NA | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Bhavani River | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 1.75 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 10 | (b)Permanent Employment-During Operation | 40 | (c)Temporary Employment- During Construction | 180 | (d)Temporary Employment- During Operation | 20 | (e)No. of working days | 340 | (f)Total Manpower | 250 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 1.6 | (b)Percentage of Total Project Area | 32.92 | (c)No. of Plants to be Planted | 2000 | (d)Funds Allocated for Plantation | 100000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | The existing kraft paper manufacturing facility of SAPML has been operating depending on the power supply from the grid. To become less dependent on the grid supply. Plant will comply with the new power plant emission regulations, the concentration of SO2, NOx and PM from the proposed power plants shall meet 100 mg/Nm3, 100 mg/Nm3 and 30 mg/Nm3 respectively | (2.) | Social | The project will create direct employment to about 50 persons. In addition, it would generate indirect employment to about 200 persons.
CER Budget of Rs. 55 Lakhs has been embarked for the local community development within the vicinity of the project area for a period of 5 years | (3.) | Financial | The project is likely to generate income to the state by way of Goods and Service Tax (GST) and by way of income tax and other taxes. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Thermal Projects |
|
1. | Specifications of Plant: | (a) Technology Proposed | Atmospheric fluidized bed combustion | (b) Plant Load Factor(%) | 93.3 | (c) Station Heat Rate (Kcal/Kwh) | 118791 | (d) Steam Rate/Flow Rate | 100 | (e) Boiler Temperature | 490 | (f) Boiler Pressure | 68 | (g) Type of Stack | Single flue | (h) No. of Stacks | 1 | |
|
S. No. | Stack ID | Stack Height (m) | Stack Diameter at exit (m) | Exit Velocity of Stack Gas (m/s) | Exit Temperature of Stack Gas (Degree Celsius) |
---|
(1.) | 1 | 70 | 1.75 | 20 | 140 | |
|
2. Details of Fuel Linkage |
---|
S. No. | Type of Fuel | Type of Linkage | Other Type of Linkage | Details | Characteristics |
---|
(1.) | Coal | Open Market | | Source of Linkage : | Imported Coal (Indonesian) | Quantity of Linkage Granted : | 450 | Date of Linkage : | 02 Oct 2020 | Duration of Linkage : | Open Market - NA |
| Gross Calorific Value (Kcal/Kg) : | 5500 | Ash Content (%) : | 3 | Sulphur Content (%) : | 0.15 | Moisture (%) : | 31.27 | Mercury (mg/kg) : | 0.07 | Fixed Carbon (%) : | 42 | Volatile Matter (%) : | 40 |
| |
|
3. Details of Transportation of Fuel |
---|
S. No. | Fuel | Rail | Road | Pipe Conveyor | Conveyor Belt | Arial Ropeway | Other Mode of Transportation | Total Distance | Total Quantity |
---|
(1.) | Coal | | Distance : | 392 | Quantity : | 450 |
| | | | | 392 | 450 | |
TOTAL | Distance : 0 Quantity : 0 | Distance : 392 Quantity : 450 | Distance : 0 Quantity : 0 | Distance : 0 Quantity : 0 | Distance : 0 Quantity : 0 | Distance : 0 Quantity : 0 | |
|
4. | Details of Cooling System: | (a) Type of Cooling System | Air Cooled | (b) Type of Draft | Forced Draft | (c) Type of Air Circulation | Parallel Flow | (d) Cycle of Cooling (COC) | 4 | (e) Water Req. For Cooling (m3/day) | 15 | (f) Boiler Blow Down Temperature | 34 | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1922/RA 0170 | (ii)Name of the EIA Consultant | M/s.Cholamandalam MS Risk Services Ltd | (iii)Address | ParryHouse, 3rd Floor, No. 2, NSC Bose Road, Chennai – 600 001 | (iv)Mobile No. | 9677003778 | (v)Landline No. | 0443045620 | (vi)Email Id | bhaskarVS@cholams.murugappa.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Thermal Projects | (ix)Validity of Accreditation | 23 May 2023 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | The following information is to be submitted:
1. Details of Public Consultations alongwith requisite documents to be submitted.
2. R & R details in the project area.
3. Map showing distance of the project from Satyamangalam Tiger Reserve.
4. Kml file is not opening. | 20 Oct 2020 | 2. | NA | The correction have been made as per the instruction received | 06 Jan 2021 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | SUBRAMANIAM P | Designation | MANAGING DIRECTOR | Name of Company (Applicant Name should not be given here) | SRI ANDAL PAPER MILLS PVT LTD (POWER PLANT) | Address | 548/2.3,4PUTHUKKADUKOKKARAKONDI PIRIVU,PUTHUPEERKADAVU,SATHAYAMANGALAM,ERODE |
|