Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed 14.5 MW Coal based Captive Co-generation Power Plant within the existing facility at Village Puthukkadu, Kokkarakondi, Pirivu, Puthupeerkadavu, Taluk Sathyamangalam, District Erode, Tamil Nadu by M/s Sri Andal Paper Mill Pvt. Ltd
(b)Name of the Company / Organisation SRI ANDAL PAPER MILLS PVT LTD (POWER PLANT)
(c)Registered Address 548/2.3,4PUTHUKKADUKOKKARAKONDI PIRIVU,PUTHUPEERKADAVU,SATHAYAMANGALAM,ERODE,,Erode,Tamil Nadu-638451
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant SUBRAMANIAM P
(b)Designation (Owner/ Partner/ CEO) MANAGING DIRECTOR
(c)Address 548/2,3,4,PUTHUKKADU,KOKKARAKONDI PIRIVU,PUTHUPEERKADAVU,SATHAYAMANGALAM,ERODE,,Sathyamangalam,Erode,Tamil Nadu-638451
(d)Pin code 638451
(e)E-mail apm302020@gmail.com
(f)STD Code. 4295(f)Telephone No. 243277
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(d) Thermal Power Plants
Minor Activity
(b)Category A
(c)Proposal Number IA/TN/THE/140843/2020
(d)Master Proposal Number(Single Window) SW/177807/2020
(e)EAC concerned (for category A Projects only) Thermal Projects
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 533/1,534/4,540/8 and 541/1
(b)Pincode 638011
(c)Bounded Latitudes (North)
From
Degree 11.500207
Minutes
Second
From
Degree 11.500244
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 11.499293
Minutes
Second
From
Degree 77.136197
Minutes
Second
(e)Survey of India Topo Sheet No. 58A/14, 58A/15, 58E/2, 58E/3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 270
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.15
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Tamil Nadu
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Tamil NaduErodeSathyamangalam
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number 13012/02/2020-IA.I(T)
(b)Date of Apply of TOR 05 Feb 2020
(c)Date of Issue of TOR / Standard ToR 13 Apr 2020
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :03 Nov 2020
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :15 Dec 2020
Distance of Public Hearing Venue from the Proposed Project :5
Sri Bannariamman Thirumanamandapam, Thottampalayam, Sathyamangalam Taluk, Erode district, Tamil Nadu
State :Tamil Nadu
District :Erode
Tehsil :Sathyamangalam
Village :Thottampalayam
111Expanding CSR Activities in the region, Not to discharge any wastewater outside the premisis, Employment opportunities to the local peopleDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Thermal Power Plant1 X 14.5 MW100 TPH at 105 kg/cm2 working pressure
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Power14.5Mega Watt(MW)OthersInternal application
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 14 May 2018
(iv)Valid Upto 31 Mar 2023
(v)File No. 1808212739756
(vi)Application No. T1/TNPCB/F.0099PND/RM/PND/A/2018
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 55
(b) Funds Allocated for Environment Management (Capital) (in Crores) 7
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.55
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.1
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
c)Notified Eco-sensitive areas Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 450
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 450
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Coal450OthersTPDImported Coal (Indonesian)Road392 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 15 May 2020 To 14 Aug 2020
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube30.914.030.580
(2.)PM10Micro Gram per Meter Cube90.730.189.7100
(3.)SO2Micro Gram per Meter Cube19.77.119.680
(4.)PM2.5Micro Gram per Meter Cube55.416.748.960
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l1.10.111.5
(2.)Heavy MetalsIRONmg/l0.050.0511
(3.)pHOthersNo.7.876.58.5
(4.)TSSmg/l5555
(5.)TDSmg/l9892715002000
(6.)Total Hardnessmg/l30892200600
(7.)Chloridesmg/l151402501000
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l8.67.5A
(2.)pHOthersNo7.36.8A
(3.)BODmg/l22A
(4.)DOmg/l6.36.2A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))65.1147.8455
(2.)Leq(Night)A-weighted decibels(dB(A))58.647.2945
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNo7.96.6
(2.)Electric ConductivityOthersµS/Cm180677
(3.)N(Nitrogen)Milligram per Kilogram11
(4.)P(Phosphorus)Percent0.320.07
(5.)K(Potassium)Percent0.270.11
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.65 To 14.9
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1 To 20.7
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface2971.2Copy of Permission LetterPipelineIntake WellS7(1)/72908/OT.V/199620 Aug 20191500
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Cooling tower blow down56300Will be treated in the existing ETP with ZLD systemReuse within the Plant & Recycling5
(2.)DM Regeneration406300Will be treated in the existing ETP with ZLD systemReuse within the Plant & Recycling40
(3.)Boiler blowdown240Collection and Direct Reuse for ash quenchingReuse within the Plant & Recycling24
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 69
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 69
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used/Spent OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1Tons50RoadAuthorized Recyclers
(2.)Boiler AshFly Ash14850Tons50RoadOthersCement and Brick Manufacturing
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube31.91.80.03260
(2.)SO2Microgram per Meter Cube30.91.81.632.5180
(3.)PM10Microgram per Meter Cube90.71.980.591.21100
(4.)NOxMicrogram per Meter Cube19.71.81.621.3180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Imported Coal from IndonesiaImported Coal701.75PM103.46 kg/hr
(2.)Imported Coal from IndonesiaImported Coal701.75SO211.54 kg/hr
(3.)Imported Coal from IndonesiaImported Coal701.75NOx41.25 kg/hr
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 14500
(b)Source Captive
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1000kva
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 4.86
    Total Land (ha.) 4.86
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 4.86
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 4.8600
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.607
(2.)OthersFly ash silos and coal storage area0.12
(3.)Green belt1.604
(4.)Built Up Area2.529Roads and walkways and vacant area
Total (ha.) 4.86
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNA0na
(2.)WLSSathyamangalam Tiger reserve2.15NA
(3.)Critically Polluted AreaNA0NA
(4.)NPASathyamangalam Tiger reserve2.15NIL
(5.)ESAsNA0NA
(6.)ESZsSathyamangalam Tiger Reserve Eco Sensitive Zone1.36NIL
(7.)Wildlife CorridorsSathyamangalam Tiger reserve2.15NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestVelamundi (R.F.)60
(2.)OthersRiverBhavani River1.75NIL
(3.)Archaeological SitesNA0NA
(4.)Defence Installationsna0na
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Bhavani River
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 1.75
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 10
(b)Permanent Employment-During Operation 40
(c)Temporary Employment- During Construction 180
(d)Temporary Employment- During Operation 20
(e)No. of working days 340
(f)Total Manpower 250
32.
Green Belt in Ha:
(a)Total Area of Green Belt 1.6
(b)Percentage of Total Project Area 32.92
(c)No. of Plants to be Planted 2000
(d)Funds Allocated for Plantation 100000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThe existing kraft paper manufacturing facility of SAPML has been operating depending on the power supply from the grid. To become less dependent on the grid supply. Plant will comply with the new power plant emission regulations, the concentration of SO2, NOx and PM from the proposed power plants shall meet 100 mg/Nm3, 100 mg/Nm3 and 30 mg/Nm3 respectively
(2.)SocialThe project will create direct employment to about 50 persons. In addition, it would generate indirect employment to about 200 persons. CER Budget of Rs. 55 Lakhs has been embarked for the local community development within the vicinity of the project area for a period of 5 years
(3.)FinancialThe project is likely to generate income to the state by way of Goods and Service Tax (GST) and by way of income tax and other taxes.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Thermal Projects
S. No.Item Details
1.
Specifications of Plant:
(a) Technology Proposed Atmospheric fluidized bed combustion
(b) Plant Load Factor(%) 93.3
(c) Station Heat Rate (Kcal/Kwh) 118791
(d) Steam Rate/Flow Rate 100
(e) Boiler Temperature 490
(f) Boiler Pressure 68
(g) Type of Stack Single flue
(h) No. of Stacks 1
S. No. Stack ID Stack Height (m) Stack Diameter at exit (m) Exit Velocity of Stack Gas (m/s) Exit Temperature of Stack Gas (Degree Celsius)
(1.)1701.7520140
      2.        Details of Fuel Linkage
S. No.Type of Fuel Type of Linkage Other Type of Linkage DetailsCharacteristics
(1.)CoalOpen Market
Source of Linkage :Imported Coal (Indonesian)
Quantity of Linkage Granted :450
Date of Linkage :02 Oct 2020
Duration of Linkage :Open Market - NA
Gross Calorific Value (Kcal/Kg) :5500
Ash Content (%) :3
Sulphur Content (%) :0.15
Moisture (%) :31.27
Mercury (mg/kg) :0.07
Fixed Carbon (%) :42
Volatile Matter (%) :40
     3.       Details of Transportation of Fuel
S. No.Fuel Rail RoadPipe ConveyorConveyor BeltArial RopewayOther Mode of TransportationTotal DistanceTotal Quantity
(1.)Coal
Distance :
Quantity :
Distance :392
Quantity :450
Distance :
Quantity :
Distance :
Quantity :
Distance :
Quantity :
Distance :
Quantity :
392450
TOTAL Distance : 0
Quantity : 0
Distance : 392
Quantity : 450
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
4.
Details of Cooling System:
(a) Type of Cooling System Air Cooled
(b) Type of Draft Forced Draft
(c) Type of Air Circulation Parallel Flow
(d) Cycle of Cooling (COC) 4
(e) Water Req. For Cooling (m3/day) 15
(f) Boiler Blow Down Temperature 34
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0170
(ii)Name of the EIA Consultant M/s.Cholamandalam MS Risk Services Ltd
(iii)Address ParryHouse, 3rd Floor, No. 2, NSC Bose Road, Chennai – 600 001
(iv)Mobile No. 9677003778
(v)Landline No. 0443045620
(vi)Email Id bhaskarVS@cholams.murugappa.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Thermal Projects
(ix)Validity of Accreditation 23 May 2023
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe following information is to be submitted: 1. Details of Public Consultations alongwith requisite documents to be submitted. 2. R & R details in the project area. 3. Map showing distance of the project from Satyamangalam Tiger Reserve. 4. Kml file is not opening. 20 Oct 2020
2.NAThe correction have been made as per the instruction received 06 Jan 2021
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSUBRAMANIAM P
DesignationMANAGING DIRECTOR
Name of Company (Applicant Name should not be given here)SRI ANDAL PAPER MILLS PVT LTD (POWER PLANT)
Address548/2.3,4PUTHUKKADUKOKKARAKONDI PIRIVU,PUTHUPEERKADAVU,SATHAYAMANGALAM,ERODE