Form-1
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
1. Basic Informations
Project Name Jakraya Sugar Ltd. Gat No. 88/2/C, 96, 97, 98/1/A/1, 98/1/A/2, 98/2, 98/3, 92/1, At Watwate, Post: Inchgaon,Tal.: Mohol Dist ; Solapur, Maharashtra State Company/Organisation Name JAKRAYA SUGAR LIMITED JSL
Registered Address Chelekar Galli, Mangalwedha, Dist. Solapur Maharashtra 413305 Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Sachin B Jadhav
(b)Designation (Owner/ Partner/ CEO) MD
(c)Address A/P - Watwate, Tal. Mohol, Dist. Solapur,,Mohol,Solapur,Maharashtra-413253
(d)Pin code 413253
(e)E-mail Jsldistillery1@gmail.com
(f)Telephone No. 223361
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f)-API
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number IA/MH/IND2/176824/2020
(e)Master Proposal Number(Single Window) SW/176818/2020
(f)EAC concerned (for category A Projects only) Industrial Projects - 3
(g)Project Type(New/Expansion/Modernization) Fresh EC
4.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
5.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(c)Reason -1
(d)Supporting Document Copy of Supporting Document

Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No There would be no any change in land use with respect to local land use. But, there would be temporary change in land use, land cover or topography of plot. The project activities would be implemented on site. Apart from the set-up for API Manufacturing on site, a dense Green Belt would be developed in consultation with the District Forest Officer (DFO) in project premises.
1.2 Clearance of existing land, vegetation and buildings? No There is no any requirement for clearing of vegetation/buildings on proposed site.
1.3 Creation of new land uses? No Not Applicable.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes The soil in the proposed site is slightly alkaline to neutral in nature. Mostly, Brownish Black to Black colored and clay textured. Detailed soil testing of the industrial premises as well as 10 KM area surrounding the project site would be done in order to assess the existing soil quality.
1.5 Construction works? Yes There will be construction work on area of 21653 Sq.M. for production blocks, storage etc.. Also, new equipment will be installed.
1.6 Demolition works? No Not applicable.
1.7 Temporary sites used for construction works or housing of construction workers? Yes Temporary sheds would be constructed for security and construction work material storing till the completion of construction work. Same will be dismantled and sold as scrap.
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations No Not applicable
1.9 Underground works including mining or tunneling? No Not applicable
1.10 Reclamation works? No Not applicable
1.11 Dredging? No Not applicable
1.12 Offshore structures? No Not applicable
1.13 Production and manufacturing processes? No Please refer Anne.-II Additional Attachments for manufacturing process description, & mass balance of products to be manufactured and Anne.-I for product under proposed project.
1.14 Facilities for storage of goods or materials? Yes For the storage of raw materials, chemicals, finished products and packing material a separate storage arrangements would be done. An area of about 5100 Sq. M. would be used for storage area.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes SW generated to be given to brick manufactures & authorized recycler. The effluent generated during manufacturing 1235.97 CMD to be treated in proposed ETP. The effluent segregated Stream-I & II shall be comprises of Pri.,Sec.,tert.,Treat., followed by MEE & MEE condensate to Stream-II. Salts be to CHWTSDF. Stream-II & MEE condensate treated in Pri., Sec., Tert. treat. with RO & treated water will be recycle to achieve ZLD. Domestic effluent 23 CMD to be treated in proposed STP.
1.16 Facilities for long term housing of operational workers? No Not Applicable.
1.17 New road, rail or sea traffic during construction or operation? Yes Slight road traffic is expected during the transfer of material required for fabrication/construction from the local area shops to site.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Not Applicable.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not Applicable.
1.20 New or diverted transmission lines or pipelines? No Not Applicable.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No There would be no change in hydrology of water sources due to new project. The water required for the establishment activities would be 1558.2 CMD. 1150 CMD recycled water from ETP, 22 CMD recycled from STP treatment and fresh Water 386.2 CMD would be taken from Bhima River.
1.22 Stream crossings? No Not Applicable.
1.23 Abstraction or transfers of water from ground or surface waters? No No ground water is used for any industrial activity. The water required for various operations under proposed project would be met from Bhima river.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Not Applicable.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Transport of material and personnel would occur during the project construction period as well as during the operation period. There would be movement of equipments and machinery as well as labor at the project site.
1.26 Long-term dismantling or decommissioning or restoration works? No Not Applicable.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not Applicable.
1.28 Influx of people to an area in either temporarily or permanently? Yes Temporarily for construction / equipment installation work there would be influx of people. The labors would be appointed though authorized contactors. The permanent staff and the workers @500 nos. would be employed from local area in industry on permanent basis but there will be no provision of colony.
1.29 Introduction of alien species? No Not Applicable
1.30 Loss of native species or genetic diversity? No Not Applicable
1.31 Any other actions? No Not Applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The proposed project is going to be implemented in Non-agricultural land. Refer Anne.-V plot layout plan enclosed in Additional Attachment for more details.
2.2 Water (expected source & competing users) unit: KLD Yes Total water required for JSL will be 1558.2 CMD. Out of this 1383.2 CMD will be required for industrial purpose. For domestic purpose 25 CMD and gardening 150 CMD. Fresh water would be taken from Bhima River Refer Anne.-VI additional attachment for detailed water consumption.
2.3 Minerals (MT) No Not Applicable.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes There would be civil construction work for production block and equipments. The required construction material will be purchased from nearby sources through the suppliers.
2.5 Forests and timber (source – MT) Yes Negligible quantity would be required for Doors, Frames etc. for admin building.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes The power supply required for the proposed activity would be taken from Maharashtra State Electricity Distribution Company Limited. The average electricity required for operations will be to the tune of 2000 KVA. One D.G. set of 1000 KVA capacity will be installed.
2.7 Any other natural resources (use appropriate standard units) No Not Applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Chemicals as per MSIHC v.i.z. Acetic Acid, Benzene, Ammonia, xylene, Toluene, etc. will be used for manufacturing of products. The same shall be stored as per statutory safety norms.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No This is new Project. Regular health checkup program for the workers working in the unit will be maintained and submitted to concern authority.
3.3 Affect the welfare of people e.g. by changing living conditions? No The proposed project will provide direct and indirect employment opportunities. Hence, there would be a positive impact on the social and economic status of local people.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not Applicable.
3.5 Any other causes No Not Applicable.
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Since it is proposed project. During implementation of activity there shall not be any major generation of overburden. During construction of building and infrastructure required for manufacturing of proposed products, there would be activities such as excavation, back filling etc. However, once the construction gets over, the entire excess soil, if any, would be utilized through proper landscaping within the premises of the industry.
4.2 Municipal waste (domestic and or commercial wastes) No Not Applicable. Since there will no colony in industry premises during construction/ operation phase.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Various HW will be generated activities- Process Residue – Cat: 28.1, Distillation Residue- Cat: 20.3, ETP Sludge – Cat: 35.3, MEE Salt- Cat: 35.3, Spent Carbon- Cat:28.3, Discarded containers/barrels/liners- Cat:33.1, Filter Medium– Cat:36.2, Spent/Used Oil– Cat:5.1, These wastes will be forwarded to CHWTSDF and Authorized Recycler. Refer Anne.-VII for details on HW.
4.4 Other industrial process wastes No Not Applicable.
4.5 Surplus product No Not Applicable.
4.6 Sewage sludge or other sludge from effluent treatment Yes The ETP Sludge-10 MT/M generated from process activity will be forwarded to CHWTSDF.
4.7 Construction or demolition wastes Yes Negligible quantity of construction waste would be generated. The same shall be disposed of by back filling the low line area in premises.
4.8 Redundant machinery or equipment No Not Applicable.
4.9 Contaminated soils or other materials No Not Applicable.
4.10 Agricultural wastes No Not Applicable.
4.11 Other solid wastes Yes Solid waste will be generated in the form of Boiler Ash, Fermenter Bio-mass Sludge, Metal Scrap, Empty Containers & Drums, Packaging Material, Battery Waste, E-Waste etc. Same will be sold to Brick Manufacture or authorized recycler.
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes One 20 TPH boiler will be installed. 240 TPD of Fuel- Bagasse/briquettes will be used for same. APC in form of MDC followed by bag filter with stack ht.20 m to be provided. For power backup – DG set of 1000 KVA will be installed.
5.2 Emissions from production processes Yes Process emissions in the form of acidic, alkaline and solvent vapours are generated from the process.The emissions from the process would be taken care of through scrubbers and scrubbed material forwarded to ETP for treatment.
5.3 Emissions from materials handling including storage or transport Yes Negligible amount of emissions would be generated during storage/ transport of material. The same will be being taken care of through 2 nos of scrubbers.
5.4 Emissions from construction activities including plant and equipment Yes Dust emissions during construction will be curbed sprinkling of water and following GMP.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust from handling of materials including construction materials and waste will be generated. Sprinlikng of water will be used to curb dust. There will be no odor from construction activites.
5.6 Emissions from incineration of waste No Not Applicable. No any waste will be incinerated.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not Applicable.
5.8 Emissions from any other sources No Not Applicable.
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers No Not Applicable.
6.2 From industrial or similar processes Yes There would be no major noise generating sources other than boiler house & D.G. Set installed. Same are kept in an isolated area, which will be provided with proper acoustic treatment to have the ambient noise levels as per CPCB standards. As per the Noise Pollution (Regulation and Control) Amendment Rules, 2010, the D.G. set will be enclosed in a separate canopy. Workers are provided with Earmuffs & other PPEs. Same precaution measures shall be practiced.
6.3 From construction or demolition Yes During the construction or fabrication work, due to operations of machinery and equipment, some noise would be generated. This would be of temporary nature and the workers getting exposed would be provided with PPE.
6.4 From blasting or piling No Not Applicable.
6.5 From construction or operational traffic Yes Movement of trucks for construction material would generate noise. However, this would not be of a continuous nature and would not have much impact on the work environment of the project site.
6.6 From lighting or cooling systems No Not Applicable
6.7 From any other sources No Not Applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No Proper handling and storage is followed to avoid spillage/leakage of hazardous chemicals closed handling practices, dyke wall are provided. Routine monitoring of chemical storage area is being done to check leakages to avoid contamination with water, air, soil etc. Further, the Hazardous Waste generated is stored into the underground tank in predefined area. To avoid seepage of leachate to ground water, the area is provided with liner.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No Effluent would not be discharged in nearby water body/land. The effluent segregated Stream-I & Stream-II shall be comprises of Pri.,Sec.,tert.,Treat., followed by MEE & MEE condensate to Stream-II. Salts be to CHWTSDF. Stream-II & MEE condensate treated in Pri., Sec., Tert. treat. with RO & treated water will be recycle to achieve ZLD. Domestic effluent 23 CMD would be treated in proposed STP and 22 CMD will be recycled for Flushing.Refer Anne.-IV Additional Attachment for ETP process.
7.3 By deposition of pollutants emitted to air into the land or into water No There would be no deposition of air pollutants on Land/Water Surface. MDC followed with Bag Filter with Stack of 20 M. height will be provided to 20 TPH boiler.
7.4 From any other sources No Not Applicable.
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not Applicable.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Proper safety measures will be taken to avoid any mishap or accident in the Fuel Storage Yard or Chemical Storage Yard or any other area in plant. The workers will be given the Fire-Fighting Training as well as made aware of the accident-prone areas in the plant. An ‘On-site Emergency Plan’ will be prepared and implemented for any emergency.
8.2 From any other causes No Not Applicable.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No Not Applicable.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No There would be development of internal roads in plant area and power supply lines required for various machinery operations as well as lighting in the plant premises. Housing development – No such activity would be undertaken in the proposed unit.
9.2 Lead to after-use of the site, which could have an impact on the environment No Not Applicable.
9.3 Set a precedent for later developments No Not Applicable.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not Applicable.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Yes GIB sanctuary is located about 3.49 KM from of project site. ESZ for same is finalised and located at 3.1 KM from project site from declared ESZ of GIB.
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes River Bhima is at a distance of 4 Km from the project site.
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Yes GIB sanctuary is located about 3.49 KM from of project site. ESZ for same is finalised and located at 3.1 KM from project site from declared ESZ of GIB.
4 Inland, coastal, marine or underground waters No Not Applicable.
5 State, National boundaries No Not Applicable.
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No Not Applicable.
7 Defence installations No Not Applicable.
8 Densely populated or built-up area No Not Applicable.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) No Not Applicable.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Not Applicable.
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Not Applicable.
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No Not Applicable.
Document to be attached
1. Upload a copy of PFR Uploaded a copy of PFR.
2. Upload a copy of EMP Uploaded a copy of EMP.
3. Upload Scanned copy of covering letter. Uploaded Scanned copy of covering letter..
4. Upload Additional attached if any(Single PDF) Uploaded Additional attached if any(Single PDF).
5. Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)29/10/2020It is duplicate proposal as in same letter reference PP has submitted the proposal vide No. IA/MH/IND2/176513/2020 by JAKRAYA SUGAR LIMITED JSL. Please withdraw the proposal as it is duplicate.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSachin B Jadhav
DesignationMD
Name of Company (Applicant Name should not be given here)JAKRAYA SUGAR LIMITED JSL
AddressChelekar Galli, Mangalwedha, Dist. Solapur