1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Affordable Group Housing Aparajita Sports City | (b)Name of the Company / Organisation | M/S ABHISHEK SINGH RATHAUR CONSTRUCTION PVT. LTD. | (c)Registered Address | Flat no. 201, Guru Akansha Apartment, Jai Prakash Nagar,Bariatu,Ranchi,Jharkhand-834009 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Abhishek Singh Rathaur | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | Flat no. 201, Guru Akansha Apartment, Jai Prakash Nagar,Bariatu,Kanke,Ranchi,Jharkhand-834009 | (d)Pin code | 834009 | (e)E-mail | abhishek.singh2014@gmail.com | (f)STD Code. | 0(f)Telephone No. | | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 8(a) Building and Construction projects
| Minor Activity | | (b)Category | B1 | Reason for Applying at Ministry | SEIAA | (c)Proposal Number | IA/JH/MIS/176820/2020 | (d)Master Proposal Number(Single Window) | SW/176807/2020 | (e)EAC concerned (for category A Projects only) | INFRA-2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Mouza -Khatanga, Office kanke, Sub Division Sadar, | (b)Pincode | 834009 | (c)Bounded Latitudes (North) | | From | | Degree | 2585736.61 | Minutes | | Second | | From | | Degree | 2585780.44 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 33633.49 | Minutes | | Second | | From | | Degree | 336604.78 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 73E/7 , 73E/11 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 620 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.30 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Jharkhand | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | No | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | The project falls under Schedule 8 (a) , Category B1 as per EIA Notification, 2006. | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Level of Basement | 1 | | (2.) | No. of Towers | 9 | | (3.) | Height of building | 45 m | | (4.) | No. of Floors | B+G+14 | | (5.) | No. of Dweling Units | 1080 | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Built up area | 11259.67 | Others | sqm | Others | NA | (2.) | Plot Area | 25497 | Others | sqm | Others | NA | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 163.3 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1.65 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 2.45 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.01 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Not Applicable since there is no production/ manufacturing process involved | 0 | Others | NA | NA | Road | | 0 | Others | NA | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 16 Sep 2020 To 22 Sep 2020 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 59 | 27.8 | 59 | 60 | (2.) | Others | CO | Micro Gram per Meter Cube | 2.2 | 0.9 | 2.2 | 2 | (3.) | SO2 | | Micro Gram per Meter Cube | 52.2 | 28.6 | 50.9 | 80 | (4.) | PM10 | | Micro Gram per Meter Cube | 98.4 | 70.6 | 98.3 | 100 | (5.) | NOx | | Micro Gram per Meter Cube | 45.8 | 18 | 45.8 | 80 | |
14.2. No. of Ground Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.3 | 7.3 | 6.5 | 9 | (2.) | Heavy Metals | | Lead | mg/l | | 0.01 | 0.01 | 0.01 | 0.01 | (3.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (4.) | TDS | | | mg/l | | 260 | 260 | 500 | 500 | (5.) | Total Hardness | | | mg/l | | 128 | 128 | 200 | 200 | (6.) | Chlorides | | | mg/l | | 30 | 30 | 250 | 250 | (7.) | Fluoride | | | mg/l | | 1 | 1 | 1 | 1 | |
14.3. No. of Surface Water monitoring locations : 0 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 0 | 0 | A | (2.) | DO | | mg/l | | 0 | 0 | A | (3.) | COD | | mg/l | | 0 | 0 | A | (4.) | BOD | | mg/l | | 0 | 0 | A | |
14.4. No. of Ambient Noise monitoring locations : 7 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 59.5 | 41.5 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 50.9 | 35.2 | 45 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.7 | 7.28 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 478.6 | 299 | (3.) | P(Phosphorus) | Kilogram per hectare | | 60.8 | 40.8 | (4.) | N(Nitrogen) | Kilogram per hectare | | 216 | 140 | (5.) | K(Potassium) | Kilogram per hectare | | 412 | 362 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 12.20 To 2.21 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.81 To 6.60 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 454 | 0.9 | Copy of Permission Letter | Pipeline | | Others | Bore well | - | 09 Sep 2020 | 454 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic, Flushing , Misc | 571 | 620 | STP | Reuse within the Plant & Recycling,Green Belt Renewal Plant,Others | Losses of 57KLD | 251 | 320 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 571 | (b)Total Discharged Water (Kilolitre per Day) | 320 | (c)Total Reused Water (Kilolitre per Day) | 251 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Biodegradable | Municipal Solid Waste | | 558 | Tons | 0.9 | Road | | Others | Shall be treated in OWC | (2.) | Plastic | Plastic Waste | | 186 | Tons | 0.9 | Road | | Authorized Recyclers | | (3.) | Non- biodegradable | Municipal Solid Waste | | 186 | Tons | 0.9 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 49.3 | 0.9 | 0.36 | 49.67 | 60 | (2.) | PM10 | | Microgram per Meter Cube | 85.8 | 0.9 | 0.60 | 86.41 | 100 | (3.) | NOx | | Microgram per Meter Cube | 25.1 | 0.9 | 2.57 | 27.68 | 80 | (4.) | Others(Specify) | CO | Microgram per Meter Cube | 0.85 | 0.9 | 0.01 | 0.87 | 2 | (5.) | SO2 | | Microgram per Meter Cube | 10.8 | 0.9 | 0.51 | 11.32 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | D.G. sets of 500 KVA x 2 | Low sulfur Diesel | 48.2 | 0.30 | PM10 | | 0.017 | (2.) | D.G. sets of 500 KVA x 2 | Low sulfur diesel | 48.2 | 0.30 | Others | PM 2.5 | 0.007 | (3.) | D.G. sets of 250 KVA x 2 | Low sulfur Diesel | 47.2 | 0.30 | NOx | | 0.045 | (4.) | D.G. sets of 250 KVA x 2 | Low sulfur diesel | 47.2 | 0.30 | Others | PM 2.5 | 0.003 | (5.) | D.G. set of 250 KVA x 2 | Low sulfur Diesel | 47.2 | 0.30 | Others | CO | 0.050 | (6.) | D.G. sets of 500 KVA x 2 | Low sulfur Diesel | 48.2 | 0.30 | SO2 | | 0.06 | (7.) | D.G. sets of 250 KVA x2 | Low sulfur diesel | 47.2 | 0.30 | PM10 | | 0.008 | (8.) | D.G. sets of 500 KVA x 2 | Low sulfur Diesel | 48.2 | 0.30 | NOx | | 0.09 | (9.) | D.G. sets of 250 KVA x 2 | Low sulfur Diesel | 47.2 | 0.30 | SO2 | | 0.03 | (10.) | D.G. sets of 500KVA X2 | Low sulfur diesel | 48.2 | 0.30 | Others | CO | 0.11 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 3412.63 | (b)Source | Jharkhand Bijli Vitran Nigam Limited | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 2 x 500kVA & 2 x 250kVA | (e)Stack Height (in m) | 3.2 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 2.55 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 2.55 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Plot area | 2.55 | Total (ha.) | 2.5500 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 0.406 | | (2.) | Others | Affordable Group housing | 0.892 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESAs | None | 0 | NA | (2.) | WLS | None | 0 | NA | (3.) | NPA | None | 0 | NA | (4.) | ESZs | None | 0 | NA | (5.) | Corridors | None | 0 | NA | (6.) | Critically Polluted Area | None | 0 | NA | (7.) | Wildlife Corridors | None | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Silwai Protected Forest | 8.35 | ESE | (2.) | Archaeological Sites | | None | 0 | NA | (3.) | Defence Installations | | None | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 2.55 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Completed | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | | (b)No. of Households | | (c)No. of PDFs (Project Displaced Families) | | (d)No. of PAFs (Project Affected Families) | | (e)Funds Allocated for R&R(in INR) (in Lacs) | | (f)Status of R&R | NA | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Subanarekha river | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 0.30 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 50 | (c)Temporary Employment- During Construction | 200 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 365 | (f)Total Manpower | 250 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.41 | (b)Percentage of Total Project Area | 16.08 | (c)No. of Plants to be Planted | 319 | (d)Funds Allocated for Plantation | 15 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | Employment will be generated. | (2.) | Environmental | Green area of 4062 sqm (15.93% of total plot area) will be maintained in the proposed project. | (3.) | Social | It is an affordable group housing, hence living facilities can be taken at affordable prices. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-2 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 45 | (b)Total No. of Flats to be Build | 1080 | (c)No. of Buildings | 9 | (d)Total plot area (sqm) | 25496.91 | (e)Total built up area (sqm) | 111259.67 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 0 | (b)Capacity | 0 | (c)No. of Recharge Pits | 5 | (d)Capacity | 490 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 844 | |
|
5. | Energy Saving Measures: | (a)Source/Mode | LED, Solar | (b)Percentage | 1 | (c)Quantity | 34.12 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | QCI/NABET/ENV/ACO/20/1350/Sept 05,2020 at S.No 118 | (ii)Name of the EIA Consultant | Perfact Enviro Solutions Private Ltd. | (iii)Address | Fifth floor, NN mall, Sector 3, Rohini, New Delhi 110085 | (iv)Mobile No. | 9871591330 | (v)Landline No. | 0114928136 | (vi)Email Id | info@perfactgroup.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-2 | (ix)Validity of Accreditation | 03 Dec 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Abhishek Singh Rathaur | Designation | Director | Name of Company (Applicant Name should not be given here) | M/S ABHISHEK SINGH RATHAUR CONSTRUCTION PVT. LTD. | Address | Flat no. 201, Guru Akansha Apartment, Jai Prakash Nagar |
|