1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s. Chandra Life Sciences Pvt Ltd | (b)Name of the Company / Organisation | MS CHANDRA LIFE SCIENCES PVTLTD | (c)Registered Address | Plot No. 200, KIADB Industrial area, Kolhar Village, Nizampur Hobli, Bidar Taluk & District, Karnataka,,Bidar,Karnataka-585402 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Sathyanarayana Bandi | (b)Designation (Owner/ Partner/ CEO) | MD | (c)Address | Plot No. 200, KIADB Industrial area, Kolhar Village, Nizampur Hobli, Bidar Taluk and District, Karnataka,,Bidar,Bidar,Karnataka-585402 | (d)Pin code | 585402 | (e)E-mail | chandrasciences4ec1@gmail.com | (f)STD Code. | 80(f)Telephone No. | 26576577 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | B2 | Reason for Applying at Ministry | SEIAA | (c)Proposal Number | IA/KA/IND2/176713/2020 | (d)Master Proposal Number(Single Window) | SW/176703/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 3 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 200 | (b)Pincode | 585402 | (c)Bounded Latitudes (North) | | From | | Degree | 17.908724 | Minutes | | Second | | From | | Degree | 17.909895 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 77.455052 | Minutes | | Second | | From | | Degree | 77.456492 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 56G/5,6,9,10 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 502 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Karnataka | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | 123 | (b)Date of Apply of TOR | 17 Aug 2020 | (c)Date of Issue of TOR / Standard ToR | 09 Sep 2020 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Not applicable, B2 category | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | bulk drugs and intermediates manufacturing unit | GF+1UF | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Area - 24,300 Sqm | 169.5 | Others | TPM | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 25.95 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1.58 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.165 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.29 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 7500 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 7500 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Coal as a Fuel for Boiler | 7500 | Tons per Annum | | local vendor | Road | | 30 | Linkage | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 18 Sep 2020 To 21 Sep 2020 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 57.64 | 57.64 | 57.64 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 9.45 | 9.45 | 9.45 | 80 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 19.61 | 19.61 | 19.61 | 60 | (4.) | NOx | | Micro Gram per Meter Cube | 37.58 | 37.58 | 37.58 | 80 | |
14.2. No. of Ground Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | 116 | 116 | 20 | 600 | (2.) | Fluoride | | | mg/l | | 0.1 | 0.1 | 1 | 1.5 | (3.) | Chlorides | | | mg/l | | 40.2 | 40.2 | 250 | 1000 | (4.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (5.) | pH | | | NA | | 7.21 | 7.21 | 6.5 | 8.5 | (6.) | TDS | | | mg/l | | 394 | 394 | 500 | 2000 | |
14.3. No. of Surface Water monitoring locations : 0 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | COD | | mg/l | | 0 | 0 | A | (2.) | BOD | | mg/l | | 0 | 0 | A | (3.) | pH | | NA | | 0 | 0 | A | (4.) | DO | | mg/l | | 0 | 0 | A | |
14.4. No. of Ambient Noise monitoring locations : 1 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 64 | 58 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 60 | 54 | 70 | |
14.5. No. of Soil Sample Monitored locations : 1 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Milligram per Kilogram | | 0.02 | 0.02 | (2.) | P(Phosphorus) | Milligram per Kilogram | | 42.4 | 42.4 | (3.) | K(Potassium) | Milligram per Kilogram | | 64.5 | 64.5 | (4.) | pH | | | 7.3 | 7.3 | (5.) | Electric Conductivity | Others | microsiemens per centimeter | 0.18 | 0.18 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0 To 0 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0 To 0 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | KIADB | 81.9 | 0 | Copy of Permission Letter | modeOthers | tanker | Others | mode | 0 | 16 Jul 2014 | 81.9 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | industrial effluent and domestic sewage | 62.5 | 110 | MEE of 55 KLD and Biological treatment plant of 55 KLD capacity | Reuse within the Plant & Recycling | | 62.5 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 62.5 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 62.5 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | process residue and waste | Industrial Waste | | 633 | Tons | 30 | Road | | Co-Processing | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 57 | 0 | 0.64 | 57.65 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 9 | 0 | 0.45 | 9.46 | 80 | (3.) | NOx | | Microgram per Meter Cube | 37 | 0 | 0.58 | 37.59 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 19 | 0 | 0.61 | 19.62 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler | coal/Briquettes | 30 | 0.3 | NOx | | 0.76 g/s | (2.) | DG set | HSD | 7 | 0.3 | SO2 | | 0.474ppm | (3.) | DG set | HSD | 7 | 0.3 | PM10 | | 0.06 mg/Nm3 | (4.) | Boiler | coal/Briquettes | 30 | 0.3 | SO2 | | 0.37 g/s | (5.) | Boiler | coal/Briquettes | 30 | 0.3 | PM10 | | 0.081 g/s | (6.) | DG set | HSD | 7 | 0.3 | NOx | | 2.216 ppm | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 240 | (b)Source | GESCOM | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 380 kva x 1 | (e)Stack Height (in m) | 7 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 2.43 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 2.43 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 2.43 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : none | 0 | Total (ha.) | 2.4300 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 1.034 | | (2.) | Green belt | | 0.9234 | | (3.) | Others | driveway and paved area | 0.4726 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | None | 0 | None | (2.) | ESAs | n | 0 | None | (3.) | Corridors | None | 0 | None | (4.) | Wildlife Corridors | None | 0 | None | (5.) | Critically Polluted Area | None | 0 | None | (6.) | WLS | None | 0 | None | (7.) | ESZs | None | 0 | None | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | Bidar air force | 0.5 | East direction | (2.) | Archaeological Sites | | None | 0 | None | (3.) | Forest | | None | 0 | None | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 180 | (c)Temporary Employment- During Construction | 20 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 7 | (f)Total Manpower | 200 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.92 | (b)Percentage of Total Project Area | 37.86 | (c)No. of Plants to be Planted | 0 | (d)Funds Allocated for Plantation | 0.15 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Employment opportunity | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Industrial Projects - 3 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1922/IA0056 | (ii)Name of the EIA Consultant | AM ENVIRO ENGINEERS | (iii)Address | No. 14/1, 2nd Floor, HARIKRUPA, Pattalamma Temple Street, Basavanagudi, Bengaluru - 560 004 | (iv)Mobile No. | 9916675089 | (v)Landline No. | 26576577 | (vi)Email Id | amee.operations@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 3 | (ix)Validity of Accreditation | 23 Dec 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i) Based on the information submitted by PP it is Category B2 project, PP submitted this application at Central Level due to general condition. The Notification dated 27.03.2020 is only for API not for intermediates. If the proposal is for API & Intermediate, please apply for TOR. Please check your proposal once again.
(ii) This is an expansion proposal accordingly, the PP shall submit the certified compliance report to the conditions of CTO from the SPCB.
(iii) All old CTOs to be uploaded to verify the violation, if any done by PP.
(iv) Details of earlier production capacity needs to be authenticated and uploaded to check the violation, if any.
(v) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be submitted. It is also mentioned that after acceptance the Proposal, proposal can not be revise. Therefore, PP/Consultant is requested to kindly do needful accordingly. | 29 Oct 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Sathyanarayana Bandi | Designation | MD | Name of Company (Applicant Name should not be given here) | MS CHANDRA LIFE SCIENCES PVTLTD | Address | Plot No. 200, KIADB Industrial area, Kolhar Village, Nizampur Hobli, Bidar Taluk & District, Karnataka |
|