Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Life Republic
(b)Name of the Company / Organisation KOLTE PATIL I VEN TOWNSHIPS (PUNE) LTD.
(c)Registered Address City Bay 7th Floor, Dhole Patil Road, Camp, Pune,,Pune,Maharashtra-411001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rahul Yashwant Talele
(b)Designation (Owner/ Partner/ CEO) Business Head
(c)Address city bay, 7th floor Dhole patil road camp,Pune,,Haveli,Pune,Maharashtra-411001
(d)Pin code 411001
(e)E-mail ec.kpdl@gmail.com
(f)STD Code. 20(f)Telephone No. 67429250
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(b) Townships and Area Development projects.
Minor Activity
(b)Category B1
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/MH/NCP/176653/2020
(d)Master Proposal Number(Single Window) SW/176649/2020
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. New 86 [ Old S.Nos. 78/1 part, 80 part, 81/1/A par
(b)Pincode 411057
(c)Bounded Latitudes (North)
From
Degree 183659.65
Minutes
Second
From
Degree 183757.08
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 734232.78
Minutes
Second
From
Degree 73424778
Minutes
Second
(e)Survey of India Topo Sheet No. 47F/10 and 47F/14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 2013
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number F.No. 21-75/2020-IA-III
(c)Date of Issue of TOR 29 May 2020
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 01 Oct 2020
(c)Date of Issue of EC 13 Jan 2021
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Not applicable for residential construction projec
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. 16-175/2007(ENV)
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Feb 15 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Built Up area1461287428804.831890091.83OtherssqmOthersResidential construction project
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)R3502P+G+142P+G+14New sector
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 13 Mar 2020
(iv)Valid Upto 31 Mar 2020
(v)File No. Format1.0/CAC.CELL/UAN No.0000071685/CR2003000840
(vi)Application No. 0000071685
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 6680.93
(b) Funds Allocated for Environment Management (Capital) (in Crores) 232.53
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.91
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 4.82
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NA (Bldg. construction project)0OthersNANAOthersNA0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 03 Jan 2020 To 16 Mar 2020
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube624860.74100
(2.)NOxMicro Gram per Meter Cube17.29.216.8580
(3.)PM2.5Micro Gram per Meter Cube473045.7460
(4.)SO2Micro Gram per Meter Cube11.67.99.9580
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l54302501000
(2.)Fluoridemg/l0011.5
(3.)Heavy MetalsZincmg/l0.010.01515
(4.)TDSmg/l5204265002000
(5.)pHNA7.57.16.58.5
(6.)TSSmg/l5000
(7.)Total Hardnessmg/l324195200600
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l00C
(2.)pHNA00C
(3.)DOmg/l00C
(4.)BODmg/l00C
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.351.755
(2.)Leq(Night)A-weighted decibels(dB(A))44.141.745
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare22.538.25
(2.)N(Nitrogen)Kilogram per hectare196.617.24
(3.)K(Potassium)Kilogram per hectare256.88155.40
(4.)Electric ConductivityMillisiemens per Centimetre0.300.09
(5.)pH8.207.6
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 6
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface81124 Not Appliacble PipelineJack Well764405 Dec 20189139.45
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic1185211980STPOtherswill be disposed to PCMC drainage line67895063
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 11852
(b)Total Discharged Water (Kilolitre per Day) 5063
(c)Total Reused Water (Kilolitre per Day) 6789
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Dry wasteMunicipal Solid Waste7263.5Tons15RoadAuthorized Recyclers
(2.)Wet wasteMunicipal Solid Waste9409.7Tons0RoadOthersmechanical composting unit
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube15.0544.52180
(2.)PM2.5Microgram per Meter Cube32.15410.324360
(3.)PM10Microgram per Meter Cube52.86415.6169100
(4.)NOxMicrogram per Meter Cube28.18447.777680
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DGDiesel40.35PM100.391637
(2.)DGDiesel40.35NOx0.282516
(3.)DGDiesel40.35SO20.127988
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 56042.5
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 44 DG sets will be provided
(e)Stack Height (in m) 4
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 158.13
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 158.13
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 1456.4
(b)Waste/Barren Land (ha.) 793.9
(c)Grazing/ Community Land (ha.) 3712.1
(d)Surface Water Bodies (ha.) 316
(e)Settlements (ha.) 6696.6
(f)Industrial (ha.) 0
(g)Forest (ha.) 1212
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : other vegetation, hill slope, Fallow land, open la 17228.5
    Total (ha.) 31415.5000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Othersresidential cum commercial project158.13NA
Total (ha.) 158.13
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNA0NA
(2.)NPANA0NA
(3.)ESAsNA0NA
(4.)Critically Polluted AreaNA0NA
(5.)WLSNA0NA
(6.)ESZsNA0NA
(7.)Wildlife CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forestreserve forest2.5NA
(2.)Defence InstallationsDirectorate General Defense estate Dehu6NA
(3.)Archaeological SitesNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 158
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kushgaon Talav
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 4.8
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 200
(b)Permanent Employment-During Operation 200
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 100
(e)No. of working days 6
(f)Total Manpower 600
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt270411.54102459.2372870.74
(2.)Percentage of Total Project Area17.16.4723.57
(3.)No. of Plants77751306520840
(4.)Funds Allocated253700000402600000656300000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmentalreuse of water will decrease the water demand.
(2.)SocialDevelopment of infrastructure and employment generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 74.50
(b)Total No. of Flats to be Build 16437
(c)No. of Buildings 141
(d)Total plot area (sqm) 1581344.18
(e)Total built up area (sqm) 1890091.83
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 100
(d)Capacity 137.25
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 4 wheeler - 7182 2 wheeler -38813
5.
Energy Saving Measures:
(a)Source/Mode Energy conservation measures
(b)Percentage 27.24
(c)Quantity 16783
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area No discharge of waste water in the catchment area
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court Taluk Courts
(c)Name of the Sub Court
(d)Case No. SPCS2255/2009
(e)Orders/Directions of the court ,if any and its relevance with the proposed project Attached
(f)Case Details Attached as Annexure
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA0155
(ii)Name of the EIA Consultant ABC Techno Labs India Pvt. Ltd.
(iii)Address Balaji Bhavan Sakal Bhavan Road Sector II CBD Belapur Navi Mumbai 400614
(iv)Mobile No. 7057071491
(v)Landline No. 0222758004
(vi)Email Id gmp@abctechnolab.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 24 May 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply Letter56th Expert Appraisal Committee (Infra-2) meeting on 23rd October 2020 (item no. 56.4.10). 07 Nov 2020
2.NA

Kindly see the minutes of 56th meeting of EAC (Infra-2).

04 Nov 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRahul Yashwant Talele
DesignationBusiness Head
Name of Company (Applicant Name should not be given here)KOLTE PATIL I VEN TOWNSHIPS (PUNE) LTD.
AddressCity Bay 7th Floor, Dhole Patil Road, Camp, Pune
Print