Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) OM DIVINE BUILDCON LLP
(b)Name of the Company / Organisation OM DIVINE BUILDCON LLP
(c)Registered Address office no 19, first floor, Hill spring Ghodbunder road Thane west,,Thane,Maharashtra-400615
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Vishal Gohil
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address office no 19, first floor, Hill spring, Ghodbunder road, Thane West,,,Thane,Maharashtra-400615
(d)Pin code 400615
(e)E-mail omdivinebuildconllp@gmail.com
(f)STD Code. 0(f)Telephone No.
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(a) Building and Construction projects
Minor Activity
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/MH/NCP/176585/2020
(d)Master Proposal Number(Single Window) SW/176582/2020
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot bearing S. No. 146/1/A/1, 146/5/A/3, 147/1/A/
(b)Pincode 400606
(c)Bounded Latitudes (North)
From
Degree 19.2082
Minutes
Second
From
Degree 19.2086
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.9590
Minutes
Second
From
Degree 72.9596
Minutes
Second
(e)Survey of India Topo Sheet No. E43A16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 28
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 4
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application No
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Not applicable for building construction project
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Bldg. (Residential + Commercial)G + 3P +1stto 26th + 27th(pt) floorHeight: 97.10 m
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)FSI area (m2)14669.65Othersm2Othersm2
(2.)Total BUA (m2)33522.11Othersm2Othersm2
(3.)Plot area (m2)8347.04Othersm2OthersArea
(4.)Non FSI (m2)18822.46Othersm2Othersarea
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 30 Sep 2020
(iv)Valid Upto 30 Sep 2025
(v)File No. NA (
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 80
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.22
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.6
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.24
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NA (Bldg. construction project)0OthersNANAOthersNA0 OthersNot ApplicableCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Feb 2020 To 29 Feb 2020
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube31.522.631.580
(2.)PM10Micro Gram per Meter Cube65.956.965.7100
(3.)PM2.5Micro Gram per Meter Cube34.925.534.960
(4.)SO2Micro Gram per Meter Cube26.717.126.580
(5.)OthersCOMili Gram per Meter Cube1.30.51.32
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l1141142501000
(2.)pHNA7.37.36.58.5
(3.)Total Hardnessmg/l187187200600
(4.)TSSmg/l12.512.500
(5.)TDSmg/l6526525002000
(6.)Fluoridemg/l0.40.411.5
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.27.2B
(2.)DOmg/l4.34.3B
(3.)BODmg/l2727B
(4.)CODmg/l7777B
    14.4.     No. of Ambient Noise monitoring locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))52.552.255
(2.)Leq(Night)A-weighted decibels(dB(A))43.643.645
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare34.534.5
(2.)pH7.57.5
(3.)N(Nitrogen)Kilogram per hectare19.519.5
(4.)K(Potassium)Kilogram per hectare24.224.2
(5.)Electric ConductivityMillisiemens per Centimetre0.80.8
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 3
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.5 To 2.5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersThane Municipal Corporation1350.5Copy of Permission LetterPipelineOthersMunicipal Water Supply (pipe line)001 Sep 2020135
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Residential Bldg.125150MBBR Tech. STPReuse within the Plant & Recycling,Green Belt Renewal Plant,OthersMunicipal Sewer5669
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 125
(b)Total Discharged Water (Kilolitre per Day) 69
(c)Total Reused Water (Kilolitre per Day) 56
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Bio-degradable wasteMunicipal Solid Waste0.3Tons0OthersOnsite treatmentOthersOWC will be used
(2.)Non biodegradable wasteMunicipal Solid Waste0.2Tons0RoadOthersHanded over to authorized recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube65.90.20.266.3100
(2.)NOxMicrogram per Meter Cube31.50.20.131.780
(3.)PM2.5Microgram per Meter Cube34.90.20.135.160
(4.)SO2Microgram per Meter Cube26.70.20.327.180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG stackHSD60.1SO20.5
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1375
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1 x 750
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.8347
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.8347
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Building construction project 0
    Total (ha.) 0.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersBuilding Construction project0.8347BUA: 33,522.11 m2
Total (ha.) 0.8347
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNA0NA
(2.)CorridorsNA0NA
(3.)Wildlife CorridorsNA0NA
(4.)Critically Polluted AreaNA0NA
(5.)WLSThane Creek Flamingo WS3Project site is located within the deemed ESZ of Thane creek flamingo sanctuary (TCFS) at a distance of 3 km from the protected area of TCFS. It is also out of the proposed draft ESZ of TCFS vide not
(6.)NPANA0NA
(7.)ESZsSanjay Gandhi National park ESZ1.2our site is ouside of ESZ of SGNP (100 m)
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestSGNP1.2our site is ouside of ESZ of SGNP (100 m)
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 52
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.83
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Land is in possession of PP
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Upvan lake
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 10
(b)Permanent Employment-During Operation 25
(c)Temporary Employment- During Construction 10
(d)Temporary Employment- During Operation 5
(e)No. of working days 365
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.15
(b)Percentage of Total Project Area 17.97
(c)No. of Plants to be Planted 110
(d)Funds Allocated for Plantation 1300000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialWe will generate CER funds that will be utilized in surrounding area.
(2.)EnvironmentalThe project is newly raised therefore; At the time of development plantation will be carried out. The various Environmental facilities and infrastructure planned in the project. This includes solid waste management facility, sewage treatment plant, and water harvesting facility, Storm water drainage, etc.
(3.)FinancialThe proposed project would have beneficial impacts through provision of direct and indirect employment opportunities. At the time of construction and operational phases, there would be requirement for large number of skilled, semi-skilled and unskilled work force for current activity.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 97.10
(b)Total No. of Flats to be Build 154
(c)No. of Buildings 1
(d)Total plot area (sqm) 8347.04
(e)Total built up area (sqm) 33522.11
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 1
(b)Capacity 30
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 4W: 358 & 2W: 492
5.
Energy Saving Measures:
(a)Source/Mode LED lamps, Solar Hot water system, Energy efficien
(b)Percentage 21.4
(c)Quantity 322
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area internal SWD will be connected to municipal SWD ne
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/EIA/ACO/17/00427
(ii)Name of the EIA Consultant Mahabal Enviro Engineers Pvt. Ltd.
(iii)Address Plot No. F-7, Road No. 21, Wagle Estate, Thane 400604, Maharashtra
(iv)Mobile No. 9323058368
(v)Landline No. 21716389
(vi)Email Id dap_24@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 09 Oct 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterWe are in receipt of ADS regarding copy of acknowledgement for the application seeking NBWL recommendations as our site is located within the 10 km of Thane Creek Flamingo Sanctuary (TCFS) at a distance of 4.7 Km from the protected area of TCFS. This is required as per the procedure notified by the Ministry vide OM No. 22-3/2018 dated 8th August, 2019.We would like to inform you that, we have submitted our proposal for the NBWL enclosed herewith. We request you to kindly consider the same and grant us the Environmental Clearance. 06 Jan 2021
2.NARef. Your aforementioned proposal. While proposing the case, as per recommendation of EAC-Infra-2, it is observed that Project site is located within the 10 of Thane Creek Flamingo Sanctuary (TCFS) and is at a distance of 4.0 km from the protected area of TCFS. It is also out of the proposed draft ESZ of TCFS vide notification published by the MoEF&CC dt. 06.11.2019. As on date, you have not submitted copy of acknowledgement to the effect that application seeking NBWL recommendations has been submitted. This is required as per the procedure notified by the Ministry vide OM No. 22-3/2018 dated 8th August, 2019. As per the aforesaid OM, proposals involving development activity / project located within 10 kilometers of National Park/Wildlife Sanctuary, wherein final ESZ notification is not notified, prior clearance Standing Committee of the National Board for Wildlife is mandatory. In such cases, the project proponent shall submit the application simultaneously for grant of TOR/ EC as well as wildlife clearance Hence, you are requested to submit the acknowledgment to the effect that application seeking recommendations of National Board of Wild Life has been submitted. 05 Jan 2021
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVishal Gohil
DesignationPartner
Name of Company (Applicant Name should not be given here)OM DIVINE BUILDCON LLP
Addressoffice no 19, first floor, Hill spring Ghodbunder road Thane west