Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Application under 7 (ii) EIA Notification S.O.236 (E) Dt.16 Jan’2020 for proposed 20 % capacity addition of ethanol with “No increase in Pollution Load” Proposed Expansion of Existing Grain Base Distillery from 59 KLPD to 71 KLPD along with 3.75 MW Co-generation power plant based on Agro waste fuel – Briquette and 66 lakhs cases IMFL
(b)Name of the Company / Organisation KHEMANI DISTILLERIES PVT LTD
(c)Registered Address Village: Ringanwada, Kachigam Road, Nani Daman,,Daman,Daman and Diu-396210
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant ASHOK Kewalram Khemani
(b)Designation (Owner/ Partner/ CEO) CHAIRMAN
(c)Address Village Kachigam kachigam Road, Daman,,Daman,Daman,Daman and Diu-396210
(d)Pin code 396210
(e)E-mail hrdwivedi@khemanigroup.com
(f)STD Code. 260(f)Telephone No. 2242672
(g)Fax No. 2242673
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity5(g) Distilleries
(b)Category A
(c)Proposal Number IA/DD/IND2/176552/2020
(d)Master Proposal Number(Single Window) SW/176549/2020
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 50/1-A (1), 50/1-g, 50/2, 53/1, 53/2, 53/4, 58, 59
(b)Pincode 396210
(c)Bounded Latitudes (North)
From
Degree 20.339
Minutes
Second
From
Degree 20.383
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.872
Minutes
Second
From
Degree 72.874
Minutes
Second
(e)Survey of India Topo Sheet No. F43S15 and S11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 16
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 4.39
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Daman and Diu
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 18-E-2/2019(ENV) 197 DATED 28.2.2019
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Feb 22 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Power Generation3.7503.75Mega Watt(MW)OthersInternal
(2.)IMFL/CL66066OthersLakhs cases/AnnumRoadInternal
(3.)ENA591271Kilo Litre per Day(KLD)RoadInternal
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)ENA59 KLD12KLD71KLDModernization with Expansion ( 20% Capacity Expansion)
(2.)IMFL/CL66 lakhs cases/annum066 lakhs cases/annumNA
(3.)Power Generation3.75 MW03.75 MWNA
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 Oct 2018
(iv)Valid Upto 30 Sep 2021
(v)File No. PCC/DDD/R-34/WA/AA/RW/94-95/192669/262
(vi)Application No. 192669
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 100
(b) Funds Allocated for Environment Management (Capital) (in Crores) 27
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 30
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 30
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Discarded grains (Broken rice, maize, bajra, sorghum, jawar and agro based raw material)165OthersTPDOpen marketRoad,Rail50 Open MarketCopy of Linkage
(2.)Anti-foam Agent34.5OthersKg/dayLocal marketRoad7 OthersLocal marketCopy of Linkage
(3.)Enzymes96.6OthersKg/dayLocal marketRoad7 OthersLocal marketCopy of Linkage
(4.)Yeast (Active Dry Yeast/Distiller’s Yeast27.6OthersKg/dayLocal marketRoad7 OthersLocal marketCopy of Linkage
(5.)Sodium hydroxide80OthersKg/dayLocal marketRoad7 OthersLocal marketCopy of Linkage
(6.)Nutrient23OthersKg/dayLocal marketRoad7 OthersLocal marketCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 4.08 To 40
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.98 To 5.38
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater10670Copy of Permission LetterPipelineOthersBore well21- 4/77/DD/IND/201911 Apr 20191067
(2.)Surface1371.46Copy of Permission LetterCanalOthersCanal supply41195822 Aug 2018137
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic1620STPGreen Belt Renewal Plant16
(2.)Industrial (distillery ,power, bottling)891950ETP:Equalization,neutralization,Anaerobic, aerobic,Chemical UF, ROReuse within the Plant & Recycling891
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 907
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 907
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)STP SludgeIndustrial Waste0.01Tons0Otherswithin plantOthersAs manure within plant
(2.)E wasteE Waste0.14Tons40RoadAuthorized Recyclers
(3.)AshIndustrial Waste4380Tons50RoadOthersBrick Manufacturer & Bio-manure
(4.)Domestic wasteIndustrial Waste10.9Tons5RoadOthersOrganic-as manure
(5.)used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5Kilolitre150RoadAuthorized Recyclers
(6.)Grain gritIndustrial Waste492.75Tons20RoadOthersSold as Cattle feed
(7.)OrganicMunicipal Solid Waste3.65Tons0RoadOtherscompost pit and used as manure
(8.)Recyclable itemMunicipal Solid Waste7.3Tons5RoadAuthorized Recyclers
(9.)ETP sludgeIndustrial Waste109.5Tons0Otherswithin plantOthersAs manure within plant
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube14.81.413.528.3180
(2.)PM10Microgram per Meter Cube62.11.4163.11100
(3.)SO2Microgram per Meter Cube14.71.40.8515.5580
(4.)PM2.5Microgram per Meter Cube21.91.40.322.2160
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerBriquette501.15SO21.3
(2.)BoilerBriquette501.15PM100.5
(3.)DG set 1000*2Diesel100.25SO20.0017
(4.)DG set 500 KVADiesel110.25PM100.04
(5.)BoilerBriquette501.15NOx0.5
(6.)DG set 1000*2Diesel100.25NOx0.8
(7.)DG set 500 KVADiesel110.25SO20.0017
(8.)DG set 1000*2Diesel100.25PM100.04
(9.)DG set 500 KVADiesel110.25NOx0.8
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2700
(b)Source Co Generation Power plant of 3.75 MW and Daman Ele
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2500 KVA
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 9.7473
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 9.7473
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0.00714
(b)Waste/Barren Land (ha.) 0.00454
(c)Grazing/ Community Land (ha.) 0.00049
(d)Surface Water Bodies (ha.) 0.01312
(e)Settlements (ha.) 0.00102
(f)Industrial (ha.) 0.00078
(g)Forest (ha.) 0.00326
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Mining 0.00101
    Total (ha.) 0.0314
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt3.22
(2.)Main Plant4.4567
(3.)OthersOpen area2.0706
Total (ha.) 9.7473
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNil0Not applicable
(2.)Critically Polluted AreaVapi4Daman and Diu and Gujarat Govt. enters into an agreement EMP
(3.)NPANil0Not applicable
(4.)Wildlife CorridorsNil0Not applicable
(5.)ESZsNil0Not applicable
(6.)WLSNil0Not applicable
(7.)CorridorsNil0Not applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestReserve Forest near Balitha2.82ENE Direction
(2.)Archaeological SitesMoti Daman Fort4.29WNW Direction
(3.)Defence InstallationsNil0Not applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 9.74
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Natural Drain Canal near Project site
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Daman Ganga
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 0.97
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 425
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 425
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt3.2203.22
(2.)Percentage of Total Project Area33033
(3.)No. of Plants323403234
(4.)Funds Allocated101
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe proposed plant result in a improvement of infrastructure as well as overall socioeconomic development in the area. The people residing in the nearby areas will be benefited directly and indirectly.
(2.)FinancialThe company intends to take up developmental work in the periphery area. • The proposed capacity enhancement will be a value addition in growth of employment and economic benefits to region.
(3.)EnvironmentalNo increase in pollution, zero liquid discharge
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA0150
(ii)Name of the EIA Consultant Anacon Laboratories Pvt Ltd
(iii)Address 60, Bajiprabhu Nagar, Nagpur - 440 033, MS Lab. & Consultancy: FP-34, 35, Food Park, MIDC, Butibori, Nagpur – 441122
(iv)Mobile No. 9373287475
(v)Landline No. 0712224207
(vi)Email Id project@anacon.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 30 Sep 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantASHOK Kewalram Khemani
DesignationCHAIRMAN
Name of Company (Applicant Name should not be given here)KHEMANI DISTILLERIES PVT LTD
AddressVillage: Ringanwada, Kachigam Road, Nani Daman