Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Commercial Complex
(b)Name of the Company / Organisation M/S LIFESTYLE BUILDCON PVT. LTD.
(c)Registered Address 3, Munirka Marg, Vasant Vihar, New Delhi,,South West,Delhi-110057
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Vinod Saluja
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address 3, Munirka Marg, Vasant Vihar, New Delhi,,Vasant Vihar,South West,Delhi-110057
(d)Pin code 110057
(e)E-mail salconaurum2020@gmail.com
(f)STD Code. 11(f)Telephone No. 46557777
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(a) Building and Construction projects
Minor Activity8(a) Building and Construction projects
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/DL/MIS/176343/2006
(d)Master Proposal Number(Single Window) SW/176336/2020
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot no. 04
(b)Pincode 110025
(c)Bounded Latitudes (North)
From
Degree 3158946.63
Minutes
Second
From
Degree 3159041.01
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 723762.73
Minutes
Second
From
Degree 723780.30
Minutes
Second
(e)Survey of India Topo Sheet No. 53H/06
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 210
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.85
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 21-96/2007-IA.III
(b)Date of Apply of TOR 01 Nov 2006
(c)Date of Issue of TOR / Standard ToR 21 Dec 2006
(d)Date of Apply of EC 18 Jan 2007
(e)Date of Issue of EC 31 Oct 2007
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason As the proposed project is building construction, public hearing will be exempted
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. 0
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 15 2020 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Plot area0.646600.6466Hectares(ha)OthersNA
(2.)Builtup area2.6751060.2182812.893387Hectares(ha)OthersNA
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Max Height of building2610.936.9Unit- meters
(2.)No. of Basement303Unit- Number
(3.)No. of Floors3B+G+633B+G+9Unit- Number
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 13 Feb 2014
(iv)Valid Upto 13 Feb 2021
(v)File No. 6916
(vi)Application No. -
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 17
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.225
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.17
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.1325
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NA0OthersNANAOthersNA0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jun 2020 To 30 Jun 2020
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube151.2136.7149.2100
(2.)SO2Micro Gram per Meter Cube9.57.38.680
(3.)NOxMicro Gram per Meter Cube38.128.436.280
(4.)PM2.5Micro Gram per Meter Cube90.177.183.460
(5.)OthersCOMili Gram per Meter Cube0.910.670.822
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l4444250250
(2.)Heavy MetalsPbmg/l000.10.1
(3.)TDSmg/l315.2315.2500500
(4.)pHNA7.97.98.58.5
(5.)TSSmg/l111100
(6.)Fluoridemg/l000.10.1
(7.)Total Hardnessmg/l132132200200
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l4.84.8E
(2.)CODmg/l4040E
(3.)pHNA7.67.6E
(4.)BODmg/l2.22.2E
    14.4.     No. of Ambient Noise monitoring locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))52.752.755
(2.)Leq(Day)A-weighted decibels(dB(A))61.461.465
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.547.54
(2.)N(Nitrogen)Milligram per Kilogram75.475.4
(3.)Electric ConductivityOthersMicroSemen/cm290.6290.6
(4.)K(Potassium)Milligram per Kilogram20.420.4
(5.)P(Phosphorus)Milligram per Kilogram13.613.6
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 24.05 To 6.44
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 25.05 To 6.11
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersDelhi Jal board through tanker supply2710Copy of Permission LettermodeOthersTankerOthersTanker supply008 Jan 201927
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic and others58100STPReuse within the Plant & Recycling58
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 58
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 58
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Biodegradable wasteMunicipal Solid Waste37.96Tons10RoadOthersNearby municipal solid waste site
(2.)E-wasteE Waste0.06Tons10RoadAuthorized Recyclers
(3.)Non biodegradable wasteMunicipal Solid Waste57.30Tons10RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube9.050.250.519.5780
(2.)NOxMicrogram per Meter Cube37.150.251.7338.8980
(3.)PM10Microgram per Meter Cube150.20.250.29150.50100
(4.)PM2.5Microgram per Meter Cube86.750.250.1186.8760
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG set 2 x 500 kVALSD4.50.25PM100.017
(2.)DG Set 2 x 1250 kVALSD60.30SO20.12
(3.)DG Set 1 x 1250 kVALSD60.30OthersCO0.153
(4.)DG Set 2 x 500 kVALSD4.50.25SO20.06
(5.)DG Set 2 x 500 kVALSD4.50.25OthersPM2.50.007
(6.)DG St 1 x 1250 kVALSD60.30OthersPM2.50.013
(7.)DG Set 2 x 1250 kVALSD60.30PM100.034
(8.)DG Set 1 x 1250LSD60.30NOx0.228
(9.)DG Set 2 x 500 kVALSD4.50.25NOx0.090
(10.)DG Set 2 x 500 kVALSD4.50.25OthersCO0.077
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2506.67
(b)Source BSES
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2x1250 kVA & 1 x 500 kVA
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0.6466
    Total Land (ha.) 0.6466
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 00
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Total Plot area 0.6466
    Total (ha.) 0.6466
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area28933.87NA
Total (ha.) 28933.87
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANone0NA
(2.)ESZsAsola Wild Life Sanctuary with ESZ3.65SSW
(3.)CorridorsNone0NA
(4.)Wildlife CorridorsNone0NA
(5.)Critically Polluted AreaOkhla Industrial Area1.20SW direction
(6.)WLSNone0NA
(7.)ESAsOkhla Bird Sanctuary1.92NE direction
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsAir Force Station, Tuqlakabad, Delhi4.07SW direction
(2.)ForestJahanpanah City Protected Forest4.65WSW direction
(3.)Archaeological SitesAshokan Rock Edict at Bahapur3.63NW direction
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.64
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Yamuna River
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 920
(c)Temporary Employment- During Construction 50
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 970
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Percentage of Total Project Area10010
(2.)No. of Plants90090
(3.)Funds Allocated0.500.5
(4.)Total Area of Green Belt646.60646.6
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialRevenue will be generated.
(2.)SocialEmployment will be generated.
(3.)EnvironmentalGreen Area of 646 sqm (10 % of the total plot area) will be maintained in the proposed project
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 36.9
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 0
(d)Total plot area (sqm) 6466
(e)Total built up area (sqm) 28933.87
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 2
(d)Capacity 52.4
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 496
5.
Energy Saving Measures:
(a)Source/Mode Solar Energy
(b)Percentage 10
(c)Quantity 250.7
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area There will be no extraction of ground water.
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/ENV/ACO/20/1350
(ii)Name of the EIA Consultant Perfact Enviro Solutions Pvt. Ltd
(iii)Address 5th Floor, NN Mall , Mangalam Palace, Sector-3, Rohini, New Delhi
(iv)Mobile No. 9818362330
(v)Landline No. 0114928136
(vi)Email Id info@perfactgroup.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 03 Dec 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. Please submit a copy of CTO of exiting facility 2. please submit certified compliance report of existing EC by RO of MoEF&CC. 05 Oct 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVinod Saluja
DesignationDirector
Name of Company (Applicant Name should not be given here)M/S LIFESTYLE BUILDCON PVT. LTD.
Address3, Munirka Marg, Vasant Vihar, New Delhi
Print