Project Name M/s. Myland Life Sciences Pvt. Ltd., Unit-I Company/Organisation Name MYLAND LIFE SCIENCES PVT. LTD., UNIT-I
Registered Address Sy. No. 290, Dondapadu Village, Chinthalapalem Mandal Telangana 508245 Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant SanjeevaReddy J
(b)Designation (Owner/ Partner/ CEO) ManagingDirector
(c)Address Sy. No. 290, Dondapadu Village, Chinthalapalem Mandal,,Chinthalapalem,Suryapet,Telangana-508245
(d)Pin code 508245
(e)E-mail mylandunit1@gmail.com
(f)Telephone No. 0
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f)-API
(b)Minor Project/ActivityNIL
(c)Category B2
(d)Proposal Number IA/TG/IND2/175679/2020
(e)Master Proposal Number(Single Window) SW/175678/2020
(f)EAC concerned (for category A Projects only) Industrial Projects - 3
(g)Project Type(New/Expansion/Modernization) Fresh EC
4.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
5.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(c)Reason -1
(d)Supporting Document Copy of Supporting Document

Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes The unit is proposed to manufacture API manufacturing unit covered in an area of 108819.97 Sqm. Temporary changes in land use will be there but it will not affect the environment.
1.2 Clearance of existing land, vegetation and buildings? No No tree felling or clearance of buildings is envisaged
1.3 Creation of new land uses? No No creation of land use
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Not Applicable
1.5 Construction works? Yes Constructions works like Production blocks, ware house, utility block, Admin block etc., will be carried out to manufacture the proposed products.
1.6 Demolition works? No No Demolition works will be carried at the proposed project site.
1.7 Temporary sites used for construction works or housing of construction workers? No No housing will be provided for proposed workers because local/ nearby labors will be employed from nearby habitation
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations No No excavations or fill and cut works will be carried out at the project site.
1.9 Underground works including mining or tunneling? No Not applicable
1.10 Reclamation works? No Not applicable
1.11 Dredging? No Not applicable
1.12 Offshore structures? No Not applicable
1.13 Production and manufacturing processes? Yes The proposed project is API manufacturing unit. The manufacturing process enclosed as Annexure-III
1.14 Facilities for storage of goods or materials? Yes Raw materials will be stored at project site during operation phase. Adequate storage facilities will be provided for raw materials and finished products. The details of raw materials and their quantities are enclosed as Annexure-IRaw materials will be stored at project site during operation phase. Adequate storage facilities will be provided for raw materials and finished products. The details of raw materials and their quantities are enclosed as Annexure-IV
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Generated effluent from the proposed project activities is 165.61 KLD, which will be sent to ZLD System.
1.16 Facilities for long term housing of operational workers? No The operational workers will be hired from nearby habitation. Hence there is no need to provide housing facilities to the workers
1.17 New road, rail or sea traffic during construction or operation? No Existing roads and railways will be utilized. Proper traffic management plan will be followed due to project activities slight incremental of traffic during construction and operational phase.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Existing roads will be used for mobilization of man and material. Hence, new road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc. not required for this project
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not required
1.20 New or diverted transmission lines or pipelines? No New transmission lines are not required to this project
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No There will be no changes in hydrology due to project activities.
1.22 Stream crossings? No The project site does not exist any stream crossing
1.23 Abstraction or transfers of water from ground or surface waters? No No abstraction or transfer of water from ground or surface water.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No No changes in water bodies or the land surface affecting drainage or run-off due to these project activities.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Road transportation will be utilized for transportation of materials and finished products during operation. Transportation of workers will also be done through roadways
1.26 Long-term dismantling or decommissioning or restoration works? No No such works will be carried out in project site
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No No decommissioning works are involved in project activities
1.28 Influx of people to an area in either temporarily or permanently? No There will be temporary increase in population during construction phase. However, local people will be given preference. The permanent staff will be employed from local people as well as from outside people during operational phase.
1.29 Introduction of alien species? No Greenbelt will be developed with native species as per the MoEF & CC/ CPCB guidelines. No alien species will be introduced
1.30 Loss of native species or genetic diversity? No There will be no loss of native species or genetic diversity
1.31 Any other actions? No Not Applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The project site is private land in an area of 10.88 ha or 108819.97 Sqm
2.2 Water (expected source & competing users) unit: KLD Yes Total water requirement for proposed project is 368.67 KLD will be met from Ground Water supply.
2.3 Minerals (MT) No Not Applicable
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Required materials will be met from local suppliers.
2.5 Forests and timber (source – MT) No Not Applicable
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Power requirement for the proposed plant is 1000 KVA will be met from Telangana State Southern Power Distribution Company Limited (TSSPDCL). Coal/ Biomass Briquette consumption of 31 TPD for boilers, Diesel consumption of 2100 Ltrs/ Day for Thermo pack boilers & Diesel consumption of 176 Ltrs/ Hr for DG sets.
2.7 Any other natural resources (use appropriate standard units) No Not Applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Hazardous materials will be handled as per MSIHC rules, amended 2000
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No There will be no occurrence of diseases due to this project
3.3 Affect the welfare of people e.g. by changing living conditions? No Not Applicable
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not Applicable
3.5 Any other causes No Not Applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No There will be no spoil, overburden or mine waste due to this project
4.2 Municipal waste (domestic and or commercial wastes) Yes There is minimal municipal waste generated from project activities
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Hazardous waste like containers, drums, used oil will be generated from the project and will be sent to the SPCB authorized agencies/ recyclers.
4.4 Other industrial process wastes Yes Process waste will be sent to authorized recyclers.
4.5 Surplus product No There is no surplus product
4.6 Sewage sludge or other sludge from effluent treatment Yes Sludge from ETP and MEE will be sent to TSDF
4.7 Construction or demolition wastes Yes Construction waste will be generated from the project and the generated waste will be reused within the plant.
4.8 Redundant machinery or equipment No There will be no redundant machinery or equipment
4.9 Contaminated soils or other materials No There will be no contaminated soil
4.10 Agricultural wastes No Not Applicable
4.11 Other solid wastes No Not Applicable
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Gaseous emissions like SO2, NOx, CO2, CO and Particulate matter will be released from Boilers. Adequate stacks height shall be installed for effective dispersion of pollutants. DG Sets will be used during only power failure.
5.2 Emissions from production processes Yes Gaseous emissions generated from the production processes. Adequate control measures will be installed to control the emissions from boilers
5.3 Emissions from materials handling including storage or transport Yes All the hazardous chemicals storage tanks will be provided with flame arrestors & breather valves for safety.
5.4 Emissions from construction activities including plant and equipment Yes There will be minimal emissions from construction activities hence there is no effect to environment
5.5 Dust or odours from handling of materials including construction materials, sewage and waste No No odour will emanate from the project activities.
5.6 Emissions from incineration of waste No Not Applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not Applicable
5.8 Emissions from any other sources No Not Applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise will be generated from the operation of pump, compressors etc. which will be maintained within the permissible limits as per the Ambient Noise Limits by CPCB.
6.2 From industrial or similar processes Yes There will be increase of noise level due to operation of machinery. Adequate mitigation measures will be taken
6.3 From construction or demolition Yes During Construction, noise will be generated and it will be controlled at the project site.
6.4 From blasting or piling No No blasting or piling activities are involved in this project
6.5 From construction or operational traffic Yes Movement of trucks for material and products transportation would generate noise. However, this would not be of a continuous and not have much impact on the work environment of the project site.
6.6 From lighting or cooling systems Yes Due to utilities, there will be slight increase in noise. No major impact on environment.
6.7 From any other sources No Not Applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No No risk of contamination of land and water from hazardous materials since proper measures will be taken. Collection, treatment and disposal of hazardous waste will be followed as per Hazardous Waste Management Rules, 2016 and hence no adverse impact on land environment is envisaged.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No Domestic & Process effluents will be sent to ZLD.
7.3 By deposition of pollutants emitted to air into the land or into water No No major impacts are anticipated due to deposition of pollutants emitted to air into the land or into water all the necessary Air Pollution Control Measures will be adopted for controlling the air pollution and it should be within the limits specified by CPCB.
7.4 From any other sources No Not Applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not Applicable
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No Adequate firefighting and safety measures will be installed in the plant premises to prevent & control the risks/accidents
8.2 From any other causes No Not Applicable
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No As the area is plain, there are no chances of landslides & there is no history of cloud burst. No natural disasters are envisaged, since site is in an area where such occurrences do not arise
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No There will be overall development around the project site owing to development of utilities, ancillary etc.
9.2 Lead to after-use of the site, which could have an impact on the environment No The proposed project will have negligible impact on the environment.
9.3 Set a precedent for later developments No Not Applicable
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No The proposed unit is medium; hence it will contribute to add minor cumulative effects due to proximity to other existing or planned projects
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Not Applicable
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Water Bodies Krishna River – 1.06 Km (N) Palleru River – 5.17 Km (E) Water body near Jaggayyapeta – 9.56 Km (NE) Water body near Ramapuram – 5.36 Km (WNW) Antaraganga Vagu-8.14 Km(NNW) Reserve Forests Budavada RF – 4.24 Km (NNW) Jaggayyapeta Extension RF – 5.38 Km (ENE) Kuntimaddi RF – 5.19 Km (ESE) Ginjupalli RF – 5.49 Km (ESE) Venkatayyapalem Extension RF – 6.90 Km (SSE) Venkatayyapalem RF – 5.97 Km (S) Nemalipuri RF – 8.25 Km (S) Chintalapalem RF – 7.06 Km (SSW) Balusupadu RF
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Not Applicable
4 Inland, coastal, marine or underground waters No Not Applicable
5 State, National boundaries Yes Telangana to Andhra Pradesh state boundary– 0.44 Km (NE)
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No No such routes are within the proposed project area
7 Defence installations No None within the 15 Km radius from the project site
8 Densely populated or built-up area Yes Jaggayyapeta – 7.82 Km (NNE)
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Jaggayyapeta – 7.82 Km (NNE)
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Water Bodies Krishna River – 1.06 Km (N) Palleru River – 5.17 Km (E) Water body near Jaggayyapeta – 9.56 Km (NE) Water body near Ramapuram – 5.36 Km (WNW) Antaraganga Vagu-8.14 Km(NNW) Reserve Forests Budavada RF – 4.24 Km (NNW) Jaggayyapeta Extension RF – 5.38 Km (ENE) Kuntimaddi RF – 5.19 Km (ESE) Ginjupalli RF – 5.49 Km (ESE) Venkatayyapalem Extension RF – 6.90 Km (SSE) Venkatayyapalem RF – 5.97 Km (S) Nemalipuri RF – 8.25 Km (S) Chintalapalem RF – 7.06 Km (SSW) Balusupadu RF
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No None within the 15 Km radius
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No The proposed project site falls under Moderate, Seismic Zone-III
Document to be attached
1. Upload a copy of PFR Uploaded a copy of PFR.
2. Upload a copy of EMP Uploaded a copy of EMP.
3. Upload Scanned copy of covering letter. Uploaded Scanned copy of covering letter..
4. Upload Additional attached if any(Single PDF) Uploaded Additional attached if any(Single PDF).
5. Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)06/11/2020The correction have been made as per the instruction received
(2.)29/10/2020(i) Based on the information submitted by PP it is Category B2 project, PP submitted this application at Central Level due to general condition. In application it is mentioned that the proposal is for bulk drugs and intermediates, However, the Notification dated 27.03.2020 is only for API not for intermediates. If the proposal is for API & Intermediate, please apply for TOR. Please check your proposal once again. (ii) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be submitted. It is also mentioned that after acceptance the Proposal, proposal can not be revise. Therefore, PP/Consultant is requested to kindly do needful accordingly.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSanjeevaReddy J
DesignationManagingDirector
Name of Company (Applicant Name should not be given here)MYLAND LIFE SCIENCES PVT. LTD., UNIT-I
AddressSy. No. 290, Dondapadu Village, Chinthalapalem Mandal
Print