Form-2 | APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE | | 1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Refinery Capacity from 20 MMTPA to 46 MMTPA with Petrochemical Complex. | (b)Name of the Company / Organisation | NAYARA ENERGY LIMITED | (c)Registered Address | KHAMBHALIA, P.O.BOX NO.24,DIST. DEVBHUMI DWARKA, GUJARAT - 361305, INDIA,Devbhumi Dwarka,Gujarat-361305 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
| 2. | Address for the correspondence: | (a)Name of the Applicant | ASMITA PATEL | (b)Designation (Owner/ Partner/ CEO) | HEADENVIRONMENT | (c)Address | KHAMBHALIA, P.O.BOX.24,DIST. DEVBHUMI DWARKA, GUJARAT - 361305, INDIA,Khambhalia,Devbhumi Dwarka,Gujarat-361305 | (d)Pin code | 361305 | (e)E-mail | priya.ayengar@nayaraenergy.com | (f)STD Code. | 2833(f)Telephone No. | 662506 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 4(a) Petroleum refining industry 5(c) Petro-chemical complexes (industries based on processing of
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/175608/2018 | (d)Master Proposal Number(Single Window) | SW/175554/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
| 4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Survey No:62-66,7712,88,97,286-297,299-310,312-3 | (b)Pincode | 361305 | (c)Bounded Latitudes (North) | | From | | Degree | 22.310758 | Minutes | | Second | | From | | Degree | 22.354772 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 69.728611 | Minutes | | Second | | From | | Degree | 69.772777 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F42J11, F42J12, F42J15, F42J16 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 50 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1.5 | (j)Seismic Zone | 4 | |
| 5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
| | Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | | | 6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/320/2006-IA-II(I) | (c)Date of Issue of TOR | 03 Aug 2018 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 27 Sep 2020 | (c)Date of Issue of EC | 05 Jan 2021 | (d)Previous EC Letter | Copy of Previous EC letter | |
| 7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
| 7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 28 Aug 2020 | Distance of Public Hearing Venue from the Proposed Project : | 1 |
| New Township, Nayara Energy Ltd., S. No. 138/p1, 41 km Mile stone, Jamnagar-Okha Highway, Mithoi | State : | Gujarat | District : | Jamnagar | Tehsil : | Lalpur | Village : | Mithoi |
| 167 | Proceeding of the PH are summarized in Tables 7.4.2 and 7.4.3 of chapter 7 of EIA report. | District Collector | | (2.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 29 Aug 2020 | Distance of Public Hearing Venue from the Proposed Project : | 1 |
| New Township, Nayara Energy Ltd., S. No. 138/p1, 41 km Mile stone, Jamnagar-Okha Highway, Mithoi | State : | Gujarat | District : | Jamnagar | Tehsil : | Lalpur | Village : | Mithoi |
| 249 | Proceeding of the PH are summarized in Tables 7.4.2 and 7.4.3 of chapter 7 of EIA report | District Collector | | | 8. | Details of Project Configuration/Product: | Details Not Applicable | |
| 9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | File No: 5-26/2008(ENV)/63 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Aug 30 2018 12:00AM | (b)Details of Capacity Expansion | |
| S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | LPG | 938 | 785 | 1723 | Others | KTPA | Road,Rail | | (2.) | Fuel and Losses | 1120 | 6620 | 7740 | Others | KTPA | Pipe Conveyor | | (3.) | PET COKE | 2247 | 2191 | 4438 | Others | KTPA | Road,Rail | Jetty | (4.) | Sulphur | 318 | 1610 | 1928 | Others | KTPA | Road,Rail | | (5.) | HDPE | 0 | 500 | 500 | Others | KTPA | Road,Rail | | (6.) | Bitumen | 377 | 337 | 714 | Others | KTPA | Road | | (7.) | Polycarbonate | 0 | 130 | 130 | Others | KTPA | Road,Rail | | (8.) | Kero + ATA | 872 | 624 | 1496 | Others | KTPA | Road,Rail,Others | Jetty | (9.) | Butadiene | 0 | 180 | 180 | Others | KTPA | Road,Rail | | (10.) | PP | 0 | 1050 | 1050 | Others | KTPA | Road,Rail | Jetty | (11.) | SM | 0 | 500 | 500 | Others | KTPA | Road,Rail | Jetty | (12.) | HSD | 9706 | 22775 | 32481 | Others | KTPA | Road,Rail,Others | Jetty | (13.) | MTBE + ETBE | 0 | 150 | 150 | Others | KTPA | Road,Rail | Jetty | (14.) | LLDPE | 0 | 550 | 550 | Others | KTPA | Road,Rail | | (15.) | LAB | 0 | 200 | 200 | Others | KTPA | Road,Rail | Jetty | (16.) | MEG + DEG | 0 | 800 | 800 | Others | KTPA | Road,Rail | | (17.) | Acetone | 0 | 125 | 125 | Others | KTPA | Road,Rail | | (18.) | N-Butanol | 0 | 50 | 50 | Others | KTPA | Road,Rail | | (19.) | Benzene | 0 | 500 | 500 | Others | KTPA | Road,Rail | Jetty | (20.) | AcryLates (Butyl,methyl,ethyl) | 0 | 300 | 300 | Others | KTPA | Road,Rail | Jetty | (21.) | Phenol | 0 | 200 | 200 | Others | KTPA | Road,Rail | | (22.) | Propelene + Poly Propelene | 0 | 1000 | 1000 | Others | KTPA | Road,Rail | Jetty | (23.) | Neo PENTYL GLYCOL | 0 | 40 | 40 | Others | KTPA | Road,Rail | | (24.) | LDPE + EVA | 0 | 200 | 200 | Others | KTPA | Road,Rail | Jetty | (25.) | I-Butanol | 0 | 10 | 10 | Others | KTPA | Road,Rail | | (26.) | Acrylic Acid | 0 | 10 | 10 | Others | KTPA | Road,Rail | | (27.) | Furance Oil + VGO | 220 | 0.00 | 220 | Others | KTPA | Road,Rail,Others | Jetty | (28.) | Naphtha+ MS + Gasoline | 4200 | 10726 | 14926 | Others | KTPA | Road,Rail,Others | Jetty | (29.) | PTA | 0 | 2400 | 2400 | Others | KTPA | Road,Rail | Jetty | (30.) | Propylene Oxide + PG + Polyols | 0 | 200 | 200 | Others | KTPA | Road,Rail | Jetty | (31.) | BisPhenol A | 0 | 35 | 35 | Others | KTPA | Road,Rail | | (32.) | 2 Ethyl Hexanol | 0 | 120 | 120 | Others | KTPA | Road,Rail | | (33.) | SAP | 0 | 100 | 100 | Others | KTPA | Road,Rail | | (34.) | PX | 0 | 1400 | 1400 | Others | KTPA | Road,Rail | Jetty | | | (c)Details of Configuration | |
| S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Petrochemicals Unit | 0 | 10.75 | 10.75 | MMTPA | (2.) | Refinery | 20 | 26 | 46 | MMTPA | | 9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 13 Oct 2016 | (iv)Valid Upto | 16 Sep 2022 | (v)File No. | AWH-81987 | (vi)Application No. | Inward No. 111130 dated 07/08/2016 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
| | 10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 130000 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 3923 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 162.5 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 30.4 | |
| 11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | | 12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | | 13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 26 | (b)Existing quantity of raw material/fuel | 20 | (c)Total quantity of raw material/fuel | 46 | |
|   13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | CRUDE OIL | 46 | Others | MMTPA | worldwide | Others | Jetty | 21 | Open Market | | Copy of Linkage | | | 14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 26 Mar 2018 To 30 Jun 2018 | (b)Season | Summer | |
| 14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 42 | 15 | 36 | 60 | (2.) | NOx | | Micro Gram per Meter Cube | 36 | 17 | 32 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 140 | 60 | 110 | 100 | (4.) | SO2 | | Micro Gram per Meter Cube | 31 | 10 | 26 | 80 | | 14.2. No. of Ground Water monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 3372 | 292 | 500 | 2000 | (2.) | Fluoride | | | mg/l | | 1.1 | 0.3 | 1.0 | 1.5 | (3.) | TSS | | | mg/l | | 59 | 2 | 0.00 | 0.00 | (4.) | pH | | | NA | | 7.7 | 7 | 6.5 | 8.5 | (5.) | Total Hardness | | | mg/l | | 2060 | 168 | 200 | 600 | (6.) | Chlorides | | | mg/l | | 1400 | 27 | 250 | 1000 | | 14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.2 | 7.0 | A | (2.) | DO | | mg/l | | 6.3 | 4.3 | A | (3.) | COD | | mg/l | | 20 | 5 | C | (4.) | BOD | | mg/l | | 10 | 2.2 | C | | 14.4. No. of Ambient Noise monitoring locations : 12 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 53 | 42 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 37 | 31 | 45 | | 14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Kilogram per hectare | | 866 | 426 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 1.38 | 0.39 | (3.) | P(Phosphorus) | Kilogram per hectare | | 7.74 | 0.77 | (4.) | N(Nitrogen) | Kilogram per hectare | | 677 | 502 | (5.) | pH | | | 8.1 | 7.7 | | | 14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 25.49 To 3.12 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.07 To 23.18 | (c)Whether Ground Water Intersection will be there ? | No | |
| 15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Sea | | 928000 | 21 | Copy of Permission Letter | Pipeline | | Others | Sea Water Intake well at Jetty | 16011/22/2000-IA-III | 03 Nov 2000 | 0.00 | | | 15.1. | (a)Whether Desalination is proposed | Yes | (b)Desalination Capacity (KLD) | 342000 | (c)Quantity of Brine (KLD) | 536000 | (d)Mode of Disposal of Brine | Deep sea discharge | |
| 16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Process | 93000 | 93000 | ETP | Reuse within the Plant & Recycling | | 93000 | | (2.) | Cooling tower blowdown | 36500 | 0 | NA | Discharge into Seawater Body | | | 36500 | (3.) | Desalinatiuon/ Ro Reject | 536500 | 0 | NA | Discharge into Seawater Body | | | 536500 | | | 16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 666000 | (b)Total Discharged Water (Kilolitre per Day) | 573000 | (c)Total Reused Water (Kilolitre per Day) | 93000 | |
| 17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Spent Catalyst from Various Units | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 12500 | Tons | 300 | Road | | Authorized Recyclers | | (2.) | E-waste | E Waste | | 125 | Tons | 300 | Road | | Authorized Recyclers | | (3.) | Waste/Residue containing Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 12500 | Tons | 500 | Road | | Authorized Recyclers | | (4.) | Spent Resin | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 75 | Tons | 500 | Road | | Co-Processing | | (5.) | Oily cotton Rags/ Oil contaminated waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 250 | Tons | 500 | Road | | Co-Processing | | (6.) | Expire Hazardous Chemical | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 50 | Tons | 300 | Road | | Others | Incineration | (7.) | insulated copper cable with PVC sheathing | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 500 | Tons | 500 | Road | | Authorized Recyclers | | (8.) | Oily sludge and BSW | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 12500 | Tons | 500 | Road | | Co-Processing | | (9.) | Used Lubricating Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 750 | Tons | 300 | Road | | Authorized Recyclers | | (10.) | Discarded Empty Drums | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 500 | Tons | 300 | Road | | Authorized Recyclers | | (11.) | Waste coke/ Heater deposit | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 250 | Tons | 100 | Road | | Co-Processing | | (12.) | Lead Acid Battery | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 250 | Tons | 300 | Road | | Authorized Recyclers | | (13.) | Slop Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 200000 | Tons | 0 | Pipe Conveyor | | Co-Processing | | (14.) | Spent Carbon | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 500 | Tons | 100 | Road | | Co-Processing | | (15.) | Chemical sludge from ETP | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 250 | Tons | 200 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | | | | 18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 26 | 4 | 35 | 61.1 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 140 | 4 | 2 | 142.1 | 100 | (3.) | PM2.5 | | Microgram per Meter Cube | 42 | 4 | 2 | 44.1 | 60 | (4.) | NOx | | Microgram per Meter Cube | 32 | 4 | 45 | 77.1 | 80 | | | 18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Ebulated Bed RHCK | FO | 90 | 3.5 | Others | PM, SO2, NOx, CO | 5.48,93.18,38.37,16.44 | (2.) | VGOMHC | FO | 60 | 3.1 | Others | PM, SO2, NOx, CO | 6.76,114.91,30.42,13.52 | (3.) | DCU-2 Furnance-1 | FG | 65 | 2.5 | Others | PM, SO2, NOx, CO | 0.20,2.02,10.08,4.03 | (4.) | ATF HT | FG | 60 | 2.3 | Others | PM, SO2, NOx, CO | 0.12,1.24,6.19,2.47 | (5.) | DCU-2 Furnance -3 | FG | 65 | 2.5 | Others | PM, SO2, NOx, CO | 0.21,2.10,10.51,4.20 | (6.) | SRU-3 | Process | 82 | 3.9 | Others | NOx, CO | 26.95,10.78 | (7.) | High Propylene FCC-1 regenrator | Process Stack | 110 | 3.5 | Others | PM, SO2, NOx, CO | 12.30,209.17,86.13,73.82 | (8.) | SRU-II | Process Stack | 82 | 3.9 | Others | NOx, CO | 29.88,12.81 | (9.) | Cracker and Associated Unit 1-9 (9 stacks) | FG | 35 | 1.8 | Others | PM, SO2, NOx, CO | 0.155,1.550,7.751,3.100 | (10.) | CDU/VDU-3 | FO | 130 | 5.7 | Others | PM, SO2, NOx, CO | 13.85,235.43,96.94,41.55 | (11.) | High Propylene FCC-1 Heater | FG | 110 | 3.7 | Others | PM, SO2, NOx, CO | 0.34,3.40,16.98,6.79 | (12.) | Solvent Deasphalting unit | FO | 80 | 2.5 | Others | PM, SO2, NOx, CO | 1.47,25.02,10.30,2.94 | (13.) | Paraxylene Furnance 1-6(Stacks) | FG | 30 | 1.1 | Others | PM, SO2, NOx, CO | 0.009,0.086,0.430,0.172 | (14.) | DCU-2 Furnance -2 | FG | 65 | 2.5 | Others | PM, SO2, NOx, CO | 0.20,1.97,9.87,3.95 | (15.) | Hydrocracker | FG | 90 | 3.5 | Others | PM, SO2, NOx, CO | 0.48,4.76,23.80,9.52 | (16.) | Feed Preparation Unit | FG | 130 | 3 | Others | PM, SO2, NOx, CO | 0.42,4.15,20.77,8.31 | (17.) | SRU-1 | Process stack | 82 | 3.9 | Others | NOx, CO | 29.96,12.84 | (18.) | DHDS | FG | 70 | 2.4 | Others | PM, SO2, NOx, CO | 0.53,2.64,18.45,7.91 | (19.) | CDU/VDU | FO | 130 | 5.7 | Others | PM, SO2, NOx, CO | 24.08,409.3,108.34,48.15 | (20.) | DHDT-2 | FO | 60 | 2.8 | Others | PM, SO2, NOx, CO | 2.13,36.52,14.93,6.40 | (21.) | FCC Heater | FG | 110 | 3.7 | Others | PM, SO2, NOx, CO | 0.54,2.68,18.77,8.04 | (22.) | HMU-1 | FG | 45 | 4.7 | Others | PM, SO2, NOx, CO | 1.98,9.91,69.37,29.73 | (23.) | DCU-2 | FG | 65 | 2.5 | Others | PM, SO2, NOx, CO | 0.29,1.43,10.03,4.3 | (24.) | FCC Regenerator | Process Stack | 110 | 3.5 | Others | PM, SO2, NOx, CO | 21.17,359.81,95.24,84.66 | (25.) | HMU-3 | FG | 45 | 4.7 | Others | PM, SO2, NOx, CO | 0.96,9.59,47.95,19.18 | (26.) | SRU | Process Stack | 80 | 3.2 | Others | NOx, CO | 15.87,6.80 | (27.) | CCR-2 | FG | 130 | 5.7 | Others | PM, SO2, NOx, CO | 1.31,13.06,65.29,26.12 | (28.) | HMU-5 | FG | 45 | 4.7 | Others | PM, SO2, NOx, CO | 0.96,9.59,47.95,19.18 | (29.) | High Propylene FCC-2 Heater | FG | 110 | 3.7 | Others | PM, SO2, NOx, CO | 0.27,2.68,13.41,5.36 | (30.) | High Propylene FCC-2 Regenerator | Process Stack | 110 | 3.5 | Others | PM, SO2, NOx, CO | 10.58,179.91,74.08,63.50 | (31.) | SRU-5 | Process | 82 | 3.9 | Others | NOx, CO | 26.95,10.78 | (32.) | Aromatic Extraction Unikt | FG | 130 | 4.5 | Others | PM, SO2, NOx, CO | 0.30,3.02,15.10,6.04 | (33.) | CDU-2 | FO | 100 | 3.5 | Others | PM, SO2, NOx, CO | 4.89,83.05,21.98,9.77 | (34.) | HMU-4 | FG | 45 | 4.7 | Others | PM, SO2, NOx, CO | 0.96,9.59,47.95,19.18 | (35.) | Mini HMU | FG | 15.78 | 1.05 | Others | PM, SO2, NOx, CO | 0.09,0.47,3.30,1.42 | (36.) | DHDT | FO | 60 | 2.8 | Others | PM, SO2, NOx, CO | 4.26,72.50,19.19,8.53 | (37.) | NHT2 | FG | 130 | 5.7 | Others | PM, SO2, NOx, CO | 0.30,3.02,15.11,6.04 | (38.) | Propane Dehydrogenation Unit | FG | 30 | 1 | Others | PM, SO2, NOx, CO | 0.002,0.022,0.108,0.043 | (39.) | SRU-4 | Process | 82 | 3.9 | Others | NOx, CO | 26.95,10.78 | (40.) | Gasoline Desulphurization (GDS-2) | FG | 80 | 2.3 | Others | PM, SO2, NOx, CO | 0.12,1.18,5.90,2.36 | (41.) | HMU-2 | FG | 45 | 4.7 | Others | PM, SO2, NOx, CO | 1.86,9.28,64.94,27.83 | (42.) | DCU-3 | FG | 65 | 2.5 | Others | PM, SO2, NOx, CO | 0.42,2.09,14.60.6.26 | (43.) | Gassoline Desulphurisation (GDS-1) | FG | 80 | 2.3 | Others | PM, SO2, NOx, CO | 0.19,1.92,9.59,3.84 | (44.) | DCU-1 | FG | 65 | 2.5 | Others | PM, SO2, NOx, CO | 0.3,1.51,10.56,4.53 | (45.) | SRU-6 | Process | 82 | 3.9 | Others | NOx, CO | 26.95,10.78 | (46.) | NHTCCR | FG | 130 | 5.7 | Others | PM, SO2, NOx, CO | 2.61,13.06,91.41,39.18 | | | 19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 927000 | (b)Source | Captive power plant | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 00 | (e)Stack Height (in m) | 00 | |
| 20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 2275 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 2275 | |
| 21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 1104 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 761 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Green belt area in existing refinery area | 410 | Total (ha.) | 2275.0000 | |
| 22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 750 | | (2.) | Main Plant | | 1525 | | | | | 23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
| 23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESAs | NA | 0.00 | NA | (2.) | ESZs | NA | 0.00 | NA | (3.) | Corridors | NA | 0.00 | NA | (4.) | Critically Polluted Area | NA | 0.00 | NA | (5.) | NPA | NA | 0.00 | NA | (6.) | Wildlife Corridors | NA | 0.00 | NA | (7.) | WLS | Marine National Sanctuary | 2.36 | From Boundary | | 23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | NA | 0.00 | NA | (2.) | Others | Forest | Reserve Forest | 7.67 | Near Meghpar | (3.) | Archaeological Sites | | NA | 0.00 | NA | (4.) | Forest | | Reserve Forest | 6.94 | Near Sinhan Dam | | | 23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
| 24. | Forest Land: | Whether any Forest Land involved? | No | |
| 25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
| 26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 2275 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Acquired | |
| 27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | NA | |
| 28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Indian Peafowl | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 0.4 Crore | (iii)Period of Implementation | 10 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | Yes | (i)Uploaded copy of approval | Copy of approval | (ii)Letter No. | WLP/32/C/1019-20 /2019-20 | (iii)Date of issue | 19 Feb 2020 | (iv)Recommendation | NA | |
| 29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
| 30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Sinhan Dam | (ii)Direction of Water Bodies in Buffer Area | South West | (iii)Distance of Water Bodies in Buffer Area | 7 | |
| 31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 2000 | (c)Temporary Employment- During Construction | 12000 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 365 | (f)Total Manpower | 14000 | |
| | S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 410 | 340 | 750 | (2.) | Percentage of Total Project Area | 18 | 15 | 33 | (3.) | No. of Plants | 300000 | 250000 | 550000 | (4.) | Funds Allocated | 10000000 | 460000000 | 470000000 | | | 33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Besides the green belt development within the existing refinery premises in 33% of the total land area for the project, mass plantation movement shall be initiated within 10 km area of the project under Community Environment initiative. | (2.) | Social | The proposed developmental activities in this region will result in improvement of infrastructure as well as upliftment of social structure in the area. it is proposed to invest 2% of its average net profits on different CSR activities, as per the suggestions/demands of the people of the region. Comprehensive social/ community development activities shall be worked out, in addition to the various CSR activities already being done in the region by Nayara Energy. | (3.) | Financial | The major benefit envisaged from the project is that it will boost industrial development of the region due to assured availability of petroleum products to Country/State and industries concerned. As a result, there would be more opportunities for employment generation to the locals especially the youths. More than 12000 workers are estimated to be employed during construction phase of about 4 years and about 2000 persons will get employment in the project during the operation phase. The project | | | 34. CRZ Specific Details : Not Applicable | 35. Sector Specific Details : NOT APPLICABLE | 35. Sector Specific Details For Industrial Projects - 2 | | | 36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | Yes | (b)Name of the Court | High Courts | (c)Name of the Sub Court | Gujarat | (d)Case No. | SCA15322/2019 | (e)Orders/Directions of the court ,if any and its relevance with the proposed project | Present application
is disposed of. | (f)Case Details | Special Civil Application Number 15322 of 2019 | (g)Uploaded Court Order | Copy of Court Order | |
| 37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | Yes | (b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | Direction under section-5 of the Environment Protection Act 1986 | (c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | Copy of Direction Issued | (d)Compliance status of the directions | Direction revoked by CPCB | |
| 38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/RA 0088 | (ii)Name of the EIA Consultant | CSIR-NEERI | (iii)Address | CSIR-NEERI, Nehru Marg, Nagpur-440020 | (iv)Mobile No. | 9423400740 | (v)Landline No. | 0114560910 | (vi)Email Id | sk_goyal@neeri.res.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 17 Feb 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
| | Essential Detail Sought : NIL | Additional Detail Sought : NIL | | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. | | Name of Applicant | ASMITA PATEL | Designation | HEADENVIRONMENT | Name of Company (Applicant Name should not be given here) | NAYARA ENERGY LIMITED | Address | KHAMBHALIA, P.O.BOX NO.24 |
|
|
|