Details of Project:
(a)Name of the project(s) Residential project
(b)Name of the Company / Organisation MAHINDRA LIFESPACE DEVELOPERS LIMITED
(c)Registered Address Mahindra Towers, 5th floor, Dr. G.M. Bhosale Marg, Worli, Mumbai,,Mumbai City,Maharashtra-400018
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Mohit Arora
(b)Designation (Owner/ Partner/ CEO) Business Head
(c)Address Mahindra Towers, 5th floor, Dr. G.M. Bhosale Marg, Worli, Mumbai,,Mumbai,Mumbai City,Maharashtra-400018
(d)Pin code 400018
(e)E-mail APPROVALS.MLDL@mahindra.com
(f)STD Code. 22(f)Telephone No. 66793190
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(a) Building and Construction projects
Minor Activity
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/MH/NCP/175433/2015
(d)Master Proposal Number(Single Window) SW/175408/2020
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. CTS No. 95, 95/1 to 5 of Saki Village, Opposite Sa
(b)Pincode 400072
(c)Bounded Latitudes (North)
From
Degree 19062585
Minutes
Second
From
Degree 19063053
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72532269
Minutes
Second
From
Degree 72532468
Minutes
Second
(e)Survey of India Topo Sheet No. 47/ A/16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 15.24
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.34
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number SEIAA-EC-0000002027
(b)Date of Apply of TOR 17 Oct 2015
(c)Date of Issue of TOR / Standard ToR 21 Jan 2016
(d)Date of Apply of EC 20 Apr 2018
(e)Date of Issue of EC 04 Oct 2019
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason B2 Category
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. --
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 18 2020 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Residential Development8493.0215988.6624481.68OthersSq. mt.OthersConstruction material
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Built - up Area as per FSI8493.02 sq. mt.15988.66 sq. mt.24481.68 sq. mt.--
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 28 Sep 2020
(iv)Valid Upto 28 Sep 2020
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 210.78
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.26
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.16
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.1345
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Building & Construction material -Cement, sand, aggregate, wood, etc.0OthersTons, Kg, bags etc.Nearby vendorsRoad500 OthersNot ApplicableCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 28 Sep 2020 To 28 Sep 2020
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2NA0000
(2.)NOxNA0000
(3.)PM10NA0000
(4.)PM2.5NA0000
    14.2.     No. of Ground Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)ChloridesNA0000
(2.)Heavy MetalsNANA0000
(3.)TDSNA0000
(4.)pHNA0000
(5.)TSSNA0000
(6.)Total HardnessNA0000
(7.)FluorideNA0000
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA00E
(2.)BODNA00E
(3.)DONA00E
(4.)CODNA00E
    14.4.     No. of Ambient Noise monitoring locations : 0
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))000
(2.)Leq(Night)A-weighted decibels(dB(A))000
    14.5.     No. of Soil Sample Monitored locations : 0
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH00
(2.)K(Potassium)00
(3.)Electric Conductivity00
(4.)N(Nitrogen)00
(5.)P(Phosphorus)00
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.5 To 4.5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.5 To 4.5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMCGM1500Copy of Permission LetterPipelineOthersPipelineHE/000373/2020/L/ES01 Feb 2020150
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Treated sewage175225MBBROthersReuse for secondary requirement9283
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 175
(b)Total Discharged Water (Kilolitre per Day) 83
(c)Total Reused Water (Kilolitre per Day) 92
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Non-biodegradableMunicipal Solid Waste181Tons0RoadOthersAuthorized recyclers
(2.)Biodegradable wateMunicipal Solid Waste120Tons0Otherson siteTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxNA0000.10
(2.)PM2.5NA0000.10
(3.)PM10NA0000.10
(4.)SO2NA0000.10
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG set on project siteDiesel50OthersSPM, SO20
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 3662
(b)Source Adani Power Limited
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) DG sets of 400 kVA
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.944
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.944
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Project site is in Special Industrial zone (I3) as 0.944
    Total (ha.) 0.9440
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersBuilding Construction0.944
Total (ha.) 0.944
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsNA0--
(2.)CorridorsNA0--
(3.)Wildlife CorridorsNA0--
(4.)Critically Polluted AreaNA0--
(5.)ESAsNA0--
(6.)WLSThane Creek Flamingo Sanctuary6.00--
(7.)NPANA0--
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesMahakali (Kondivite)Caves3.00--
(2.)Defence InstallationsNA0--
(3.)ForestSanjay Gandhi National Park4.00--
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 24
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.94
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Land completely acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 0
(e)No. of working days 1825
(f)Total Manpower 150
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt00.180.18
(2.)Percentage of Total Project Area02222
(3.)No. of Plants39129168
(4.)Funds Allocated09.889.88
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialWill create job opportunities in the construction and operation phase with support staff like security, maintenance, household workers, shop keepers etc. also will create commercial jobs.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 57.70
(b)Total No. of Flats to be Build 343
(c)No. of Buildings 1
(d)Total plot area (sqm) 9443.50
(e)Total built up area (sqm) 49158.52
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 2
(b)Capacity 120
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 4 Wheeler: 425 nos.
5.
Energy Saving Measures:
(a)Source/Mode Adani Power Limited
(b)Percentage 20.5
(c)Quantity 211
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area --
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA0094
(ii)Name of the EIA Consultant ULTRA TECH
(iii)Address Unit No. 224, 225, 206 Jai Commercial Complex, Eastern Express Highway, Opp. Cadbury Factory, Khopat,Thane(w).400601
(iv)Mobile No. 8692900073
(v)Landline No. 0222534277
(vi)Email Id dipti@ultratech.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 22 Sep 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPl submit the certified compliance report of existing EC as per OM issued by MoEF&CC of 7.09.2017. 05 Oct 2020
2.NAThe correction have been made as per the instruction received 03 Nov 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMohit Arora
DesignationBusiness Head
Name of Company (Applicant Name should not be given here)MAHINDRA LIFESPACE DEVELOPERS LIMITED
AddressMahindra Towers, 5th floor, Dr. G.M. Bhosale Marg, Worli, Mumbai
Print