Project Name Shyam Enterprise Company/Organisation Name SHYAM ENTERPRISE
Registered Address Plot No. C1B-1512, GIDC Estate, Ankleshwar. Gujarat 393002 Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Chirag Vekariya
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address Plot No. C1B-1512, GIDC Estate, Ankleshwar.,,Anklesvar,Bharuch,Gujarat-393002
(d)Pin code 393002
(e)E-mail shyamenterprise@yahoo.co.in
(f)Telephone No. 0
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f)-API
(b)Minor Project/ActivityNIL
(c)Category B2
(d)Proposal Number IA/GJ/IND2/175089/2020
(e)Master Proposal Number(Single Window) SW/175082/2020
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type(New/Expansion/Modernization) Expansion
4.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
5.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(c)Reason -1
(d)Supporting Document Copy of Supporting Document

Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No Expansion project will be carry out at existing plot.
1.2 Clearance of existing land, vegetation and buildings? No Plots are already marked by GIDC Estate.
1.3 Creation of new land uses? No The project activity will be carried out in industrial plot so there will be no need to utilize of any new land.
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Investigation is already done by GIDC.
1.5 Construction works? Yes There will be construction work related to proposed plant as per plant design.
1.6 Demolition works? Yes Minor demolition work will be done.
1.7 Temporary sites used for construction works or housing of construction workers? No Not Required
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations Yes Plant Layout is attached as ANNEXURE IV.
1.9 Underground works including mining or tunneling? No No such underground activity will be carried out.
1.10 Reclamation works? No Not required.
1.11 Dredging? No Not required.
1.12 Offshore structures? No Not required.
1.13 Production and manufacturing processes? Yes Product list & its capacity is attached as ANNEXURE-II. Raw Material list with product is attached as ANNEXURE-V. Manufacturing Process is attached as ANNEXURE -VI.
1.14 Facilities for storage of goods or materials? Yes Proper facility for storage of raw material and finished goods will be provided in the unit.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? No Unit will be zero liquid discharge. Details of treatment facility is attached as ANNEXURE-VIII.
1.16 Facilities for long term housing of operational workers? No Not required. Local people will be recruited during operation.
1.17 New road, rail or sea traffic during construction or operation? No The site is well connected to roadway. No new road, rail or sea traffic required. Movement of construction material only by existing road of industrial estate.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Not Applicable.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Proposed project is located in Notified industrial area and there will be no closure or diversion of existing transport routes or infrastructure.
1.20 New or diverted transmission lines or pipelines? No There will be no such change caused due to the project.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not Applicable
1.22 Stream crossings? No No such activity is involved in the project.
1.23 Abstraction or transfers of water from ground or surface waters? No No such activity will be involved. The unit will use water from GIDC during construction and operational phase.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No There is no change in water bodies or the land surface affecting drainage or run- off as project is in notified industrial estate.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Infrastructure facilities will be utilized for the transport of personnel/ materials for project.
1.26 Long-term dismantling or decommissioning or restoration works? No No such activity is involved in the project.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No There will be no decommissioning activity for the project.
1.28 Influx of people to an area in either temporarily or permanently? No Local man power will be employed.
1.29 Introduction of alien species? No ------
1.30 Loss of native species or genetic diversity? No ------
1.31 Any other actions? No ------
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No Project is located in Notified Industrial Area, GIDC Estate.
2.2 Water (expected source & competing users) unit: KLD Yes Details of Water Consumption and Waste Water Generation are attached as ANNEXURE-VII.
2.3 Minerals (MT) Yes For construction: Minor minerals like manufactured sand, Grit and pebbles will be used.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Unit will required Aggregates, Cements, sand and Steel During construction phase.
2.5 Forests and timber (source – MT) No No forest and timber products will be used.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Detail of Energy and Fuel consumption is attached as ANNEXURE – IX.
2.7 Any other natural resources (use appropriate standard units) No Not applicable.
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes The entire operation will be carried out in a closed system. Adequate precautions shall be in place to prevent and control any environmental impact arising from any accidental spillage of materials.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not Applicable
3.3 Affect the welfare of people e.g. by changing living conditions? Yes The project will benefit the people living in the neighboring areas by providing them with direct and indirect employment opportunities associated with the construction and operation of the Project.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not Applicable
3.5 Any other causes No No other cause.
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No No mine waste / mine activity. No Over burden soil. The excavated material, during the foundation will be used for filling.
4.2 Municipal waste (domestic and or commercial wastes) Yes Office and Canteen waste will be collected and disposed as per MSW rules.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes List of Hazardous Waste is enclosed as ANNEXURE- XI.
4.4 Other industrial process wastes Yes A detail of Industrial process waste is attached as ANNEXURE-XI.
4.5 Surplus product No No surplus product will be produced.
4.6 Sewage sludge or other sludge from effluent treatment Yes Sewage sludge will not be generated and sludge generated through ETP will be sent to TSDF site for disposal.
4.7 Construction or demolition wastes Yes The construction debris from the project site during construction phase will be used for land filling materials.
4.8 Redundant machinery or equipment No Not Applicable
4.9 Contaminated soils or other materials No Not Applicable
4.10 Agricultural wastes No No agriculture waste will be generated.
4.11 Other solid wastes No No other solid waste will be generated from the project.
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes There may be an emission due to transportation. But it will be managed by following steps. 1) Proper maintenance of vehicles and machines. 2) PUC certified vehicles will be allowed for transportation. Details of Flue Gas Emission are attached as ANNEXURE-X.
5.2 Emissions from production processes Yes Details of Process Emission are attached as ANNEXURE-X.
5.3 Emissions from materials handling including storage or transport No Adequate measures will be taken to control emissions from material handling including storage or transport.
5.4 Emissions from construction activities including plant and equipment Yes Temporary in nature, which may originate during construction of building or roads, this will be taken care by proper dust suppression by sprinkling of water and providing PPE to all workers.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes The project may cause rise in dust levels during construction phase. Precautions would be taken to reduce dust generation during construction phase. Maximum use of RMC will minimize the handling of cement, sand and concrete thus dust emission will be minimized. Water sprinkling will be done at regular intervals to reduce the air borne dust.
5.6 Emissions from incineration of waste No Not Applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No No burning activity will be carried out in the unit.
5.8 Emissions from any other sources No No other emissions from any other source.
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Maximum noise levels expected will be less than 75 dbA in day time at plant boundary. The DG sets will be of CPCB specifications.
6.2 From industrial or similar processes No Adequate measures will be taken by the unit.
6.3 From construction or demolition No Adequate measures will be taken by the unit.
6.4 From blasting or piling No No blasting or piling operation required.
6.5 From construction or operational traffic Yes There will be temporary increase in traffic during construction stage. As the material is available locally and not requires any stagnation of material or vehicle stagnation.
6.6 From lighting or cooling systems No Not Applicable.
6.7 From any other sources No No emission from any other sources.
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No All necessary safety measures will be provided for handling, spillage and storage of hazardous chemicals.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No No treated effluent or sewage will be disposed on land.
7.3 By deposition of pollutants emitted to air into the land or into water No Not Applicable
7.4 From any other sources No Nil
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No No pollutants will be built up in the Environment. Therefore no risk from any sources.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes There will be chances of risk of accident from the proposed activity. Adequate control measures will be provided. Proper on site and off site emergency plans will be prepared. Unit will be carried out each and every activity in a safety manner.
8.2 From any other causes No No risk of accident from any other causes. Adequate precautionary measure will be taken by the unit.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes However, the unit will be designed and constructed considering the impact of floods, earthquakes etc.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Will lead to development of nearby areas by generating employment and providing infrastructure.
9.2 Lead to after-use of the site, which could have an impact on the environment No There will be no significant impact on environment.
9.3 Set a precedent for later developments No The Notified area is already well developed.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No There will be no cumulative effect from the proposed project.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Yes It is fully developed GIDC estate Ankleshwar.
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes The Narmada river is approximately 12 km away from project site.
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No --
4 Inland, coastal, marine or underground waters No --
5 State, National boundaries No --
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No --
7 Defence installations No --
8 Densely populated or built-up area No --
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Ankleshwar City is Approx. 3 Km. away.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes Academic institutes and hospital are approximate 7 km away from project site.
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No --
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No --
Document to be attached
1. Upload a copy of PFR Uploaded a copy of PFR.
2. Upload a copy of EMP Uploaded a copy of EMP.
3. Upload Scanned copy of covering letter. Uploaded Scanned copy of covering letter..
4. Upload Additional attached if any(Single PDF) Uploaded Additional attached if any(Single PDF).
5. Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)29/09/20201. This is an expansion proposal accordingly, the PP shall submit the certified compliance report to the conditions of CTO from the SPCB. 2. Based on the information submitted by PP it is Category B2 project. It is not clear why PP has applied at Central Level on Parivesh Portal. SEIAA Gujarat is in existence. 3. Moreover, some of the products are API Intermediate, However, the Notification dated 27.03.2020 is only for API. Please recheck your products mentioned in the application. 4. Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted. 5. All old CTOs not uploaded to verify the violation, if any done by PP. 6. Details of earlier production capacity needs to be authenticated and uploaded to check the violation, if any. 7. Please check your proposal once again and submit the above mentioned information. It is also mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance and accordingly the PP/Consultant are kindly requested to revise the application and resubmit the same.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantChirag Vekariya
DesignationPartner
Name of Company (Applicant Name should not be given here)SHYAM ENTERPRISE
AddressPlot No. C1B-1512, GIDC Estate, Ankleshwar.
Print