Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Development of Haryana Section from Km 0+000 to Km 135+056 of Delhi- Amritsar-Katra Expressway
(b)Name of the Company / Organisation National Highways Authority of India
(c)Registered Address G-5 & 6, Sector-10, Dwarka, New DElhi-110075,G-5 & 6, Sector-10, Dwarka, New DElhi-110075,South West,Delhi-110075
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Dr Biswajit Mukhopadhyay
(b)Designation (Owner/ Partner/ CEO) General Manager
(c)Address G-5 & 6, Sector-10, Dwarka, New DElhi-110075,G-5 & 6, Sector-10, Dwarka, New DElhi-110075,,New Delhi,Delhi-110075
(d)Pin code 110075
(e)E-mail biswajit@nhai.org
(f)STD Code. 11(f)Telephone No. 25074200
(g)Fax No. 25093543
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(f) Highways
Minor Activity
(b)Category A
(c)Proposal Number IA/HR/NCP/141416/2020
(d)Master Proposal Number(Single Window) SW/174368/2020
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Attached Seperately
(b)Pincode 147105
(c)Bounded Latitudes (North)
From
Degree 28.795561
Minutes
Second
From
Degree 29.826136
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 76.186669
Minutes
Second
From
Degree 76.880961
Minutes
Second
(e)Survey of India Topo Sheet No. 53D/13, 53D/9, 53C/12, 53C/11, 53C/6
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 238
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Haryana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)HaryanaKaithalKaithal
(2.)HaryanaKarnalAssandh
(3.)HaryanaSonipatGohana
(4.)HaryanaSonipatKharkhoda
(5.)HaryanaJindNarwana
(6.)HaryanaJindSafidon
(7.)HaryanaRohtakRohtak
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-17/2020-IA.III
(c)Date of Apply of TOR 12 Feb 2020
(d)Date of Issue of TOR / Standard ToR 16 Mar 2020
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :14 Aug 2020
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :16 Sep 2020
Distance of Public Hearing Venue from the Proposed Project :15
BDO Office, Asandh
State :Haryana
District :Karnal
Tehsil :Assandh
Village :Assandh
86Land Acquisition, access & irrigation issuesOthersAdditional District Collector
(2.)
Date of Advertisement :12 Aug 2020
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :18 Sep 2020
Distance of Public Hearing Venue from the Proposed Project :0.7
Govt. Girls Sr. Secondary School, Village Nilothi, Jhajjar
State :Haryana
District :Jhajjar
Tehsil :Bahadurgarh
Village :Nilothi
85Compensation, Access and Irrigation facilityOthersAdditional District Collector
(3.)
Date of Advertisement :15 Aug 2020
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :16 Sep 2020
Distance of Public Hearing Venue from the Proposed Project :4
Tehsil Camp, Gohana
State :Haryana
District :Sonipat
Tehsil :Gohana
Village :Gohana
70Related to compensation and acquisitionDistrict Collector
(4.)
Date of Advertisement :12 Aug 2020
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :15 Sep 2020
Distance of Public Hearing Venue from the Proposed Project :0.2
Rajiv Gandhi gramin Khel Parisar, Village Gangoli, Jind
State :Haryana
District :Jind
Tehsil :Jind
Village :Gangoli
89Compensation, access and irrigationOthersAdditional District Collector
(5.)
Date of Advertisement :13 Aug 2020
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :16 Sep 2020
Distance of Public Hearing Venue from the Proposed Project :0.5
Village Kharak Pandwa, Kaithal
State :Haryana
District :Kaithal
Tehsil :Kaithal
Village :Kharak Pandwa
131Land Acquisition, Compensation and Access IssuesOthersAdditional District Collector
(6.)
Date of Advertisement :17 Aug 2020
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :19 Sep 2020
Distance of Public Hearing Venue from the Proposed Project :1.6
Govt Senior Secondary School, Humayunpur, District Rohtak
State :Haryana
District :Rohtak
Tehsil :Rohtak
Village :Humayupur
65Related to compensation and accessOthersAdditional District Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Highway project including Structures4 Lane / 90 m RoW135.056 km
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Highway project including Structures135.06KilometersRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 6519
(b) Funds Allocated for Environment Management (Capital) (in Crores) 52.319
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 40.6
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.717
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0.00
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Borrow Earth26867737OtherscumNearby Approved SourceRoad1.7 Open MarketCopy of Linkage
(2.)Emulsion5304OthersMTApproved SourceRoad1600 Open MarketCopy of Linkage
(3.)Bitumen97088OthersMTNearby Approved SourceRoad152 Open MarketCopy of Linkage
(4.)Cement347228OthersMTNearby Approved SourceRoad50 Open MarketCopy of Linkage
(5.)Granular Sub- Base1426906OtherscumNearby Approved QuarryRoad112 Open MarketCopy of Linkage
(6.)Steel61711OthersMTNearby Approved SourceRoad50 Open MarketCopy of Linkage
(7.)Sand354899OtherscumNearby Approved QuarryRoad110 Open MarketCopy of Linkage
(8.)Fly Ash9757983OtherscumNearby Power PlantRoad88 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2018 To 28 Feb 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 11
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube88.562.386.6100
(2.)PM2.5Micro Gram per Meter Cube61.230.160.360
(3.)NOxMicro Gram per Meter Cube41.221.938.780
(4.)SO2Micro Gram per Meter Cube25.911.125.580
    14.2.     No. of Ground Water monitoring locations : 11
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l6.970.411.5
(2.)Total Hardnessmg/l112462200600
(3.)TSSmg/l62848860.000.00
(4.)pHNA8.57.56.58.5
(5.)TDSmg/l62808825002000
(6.)Chloridesmg/l223311.342501000
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.728.2E
(2.)CODmg/l1448E
(3.)DOmg/l7.86.9A
(4.)BODmg/l26.66E
    14.4.     No. of Ambient Noise monitoring locations : 11
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))68.349.775 & 55
(2.)Leq(Night)A-weighted decibels(dB(A))61.843.970 & 45
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Percent0.140.06
(2.)Electric ConductivityPercent1095190
(3.)P(Phosphorus)Percent320.00
(4.)pH8.928.19
(5.)K(Potassium)Percent0.570.09
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.53 To 35.39
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.35 To 36.68
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface100000.0Copy of Permission LettermodeOthersTankersOthers.NA21 Sep 20200.00
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)NA00NAGreen Belt Renewal PlantNo discharge is proposed0
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Camp Site WasteMunicipal Solid Waste438Tons5RoadOthersComposting for Biodegradable & landfill for others
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)Others(Specify)CONA1.140.010.451.592
(2.)NOxMicrogram per Meter Cube41.20.010.041.2180
(3.)PM2.5Microgram per Meter Cube61.20.010.061.2160
(4.)PM10Microgram per Meter Cube87.90.010.087.91100
(5.)SO2Microgram per Meter Cube25.90.010.025.9180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Not Applicable.0.000.00PM10.
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) .
(b)Source State electricity boards
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1500
(e)Stack Height (in m) .
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 26
(b)Private Land (ha.) 1394.6
(c)Government Land (ha.) 142.4
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1563
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 1394.6
(b)Waste/Barren Land (ha.) 0.0
(c)Grazing/ Community Land (ha.) 0.0
(d)Surface Water Bodies (ha.) 0.0
(e)Settlements (ha.) 0.0
(f)Industrial (ha.) 0.0
(g)Forest (ha.) 26
(h)Mangroves (ha.) 0.0
(i)Marine Area (ha.) 0.0
(j)Others (ha.) : Govt. Land 142.4
    Total (ha.) 1563.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersProject RoW including Intersections1563Project RoW including Intersections
Total (ha.) 1563
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANone0.0No within 10km
(2.)Wildlife CorridorsNone0No within 10km
(3.)CorridorsNone0.0No within 10km
(4.)Critically Polluted AreaNo Such Area0.00No within 10km
(5.)WLSNone0.0No within 10km
(6.)ESAsNone0.0No within 10km
(7.)ESZsNone0.0No within 10km
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestProtected Forest0.0Road and canal side plantation declared as forest
(2.)Defence InstallationsNone0.0No such installation
(3.)Archaeological SitesNone0.0No such site within 300m
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Under Process(Stage-II)
(b)Legal Status of Forest Land Protected
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 7855
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1563
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Under 3D Stage
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 59
(b)No. of Households 1756
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 1756
(e)Funds Allocated for R&R(in INR) (in Lacs) 0.0
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Pea fowl (Pavo cristatus)
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area 1 Pond, 41 Canals and 11 drains
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 1400
(b)Permanent Employment-During Operation 150
(c)Temporary Employment- During Construction 1650
(d)Temporary Employment- During Operation 100
(e)No. of working days 700
(f)Total Manpower 3300
32.
Green Belt in Ha:
(a)Total Area of Green Belt 526
(b)Percentage of Total Project Area 33.65
(c)No. of Plants to be Planted 247422
(d)Funds Allocated for Plantation 48.41
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalLesser Carbon Footprint
(2.)SocialSocial Upliftment
(3.)FinancialBetter reach to the bigger market areas
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) .
(b)Total No. of Flats to be Build .
(c)No. of Buildings .
(d)Total plot area (sqm) .
(e)Total built up area (sqm) .
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage .
(b)Capacity .
(c)No. of Recharge Pits 270
(d)Capacity .
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking .
5.
Energy Saving Measures:
(a)Source/Mode NA
(b)Percentage .
(c)Quantity .
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Bridge has been provided on all water bodies
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment 135.056
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
(a)Total No. of Bridges 40
(b)Total No. of ROB .
(c)Total No. of Interchanges 8
(d)Total No. of Flyovers 4
(e)Total No. of Vehicle Underpass 116
(f)Total No. of Pedestrian Underpass .
(g)Details of other utilities rail and road corridors 371 Box Culvert shall act as PUPs
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA0116
(ii)Name of the EIA Consultant Feedback Infra Pvt. Ltd.
(iii)Address 15th Floor, Tower, 9B, DLF Cyber City, DLF Phase 3, Sector 24, Gurugram, Haryana 122002
(iv)Mobile No. 9868563137
(v)Landline No. 0124431664
(vi)Email Id raj.singh@feedbackinfra.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 26 Aug 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterPlease find attached Stage 1 Forest Clearance Letter 23 Dec 2021
2.NAkindly enclose stage 1 forest clearance on parivesh portal 21 Dec 2021
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDr Biswajit Mukhopadhyay
DesignationGeneral Manager
Name of Company (Applicant Name should not be given here)National Highways Authority of India
AddressG-5 & 6, Sector-10, Dwarka, New DElhi-110075