1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Development of Haryana Section from Km 0+000 to Km 135+056 of Delhi- Amritsar-Katra Expressway | (b)Name of the Company / Organisation | National Highways Authority of India | (c)Registered Address | G-5 & 6, Sector-10, Dwarka, New DElhi-110075,G-5 & 6, Sector-10, Dwarka, New DElhi-110075,South West,Delhi-110075 | (d)Legal Status of the Company | Central Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Dr Biswajit Mukhopadhyay | (b)Designation (Owner/ Partner/ CEO) | General Manager | (c)Address | G-5 & 6, Sector-10, Dwarka, New DElhi-110075,G-5 & 6, Sector-10, Dwarka, New DElhi-110075,,New Delhi,Delhi-110075 | (d)Pin code | 110075 | (e)E-mail | biswajit@nhai.org | (f)STD Code. | 11(f)Telephone No. | 25074200 | (g)Fax No. | 25093543 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(f) Highways
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/HR/NCP/141416/2020 | (d)Master Proposal Number(Single Window) | SW/174368/2020 | (e)EAC concerned (for category A Projects only) | INFRA-1 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Attached Seperately | (b)Pincode | 147105 | (c)Bounded Latitudes (North) | | From | | Degree | 28.795561 | Minutes | | Second | | From | | Degree | 29.826136 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 76.186669 | Minutes | | Second | | From | | Degree | 76.880961 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 53D/13, 53D/9, 53C/12, 53C/11, 53C/6 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 238 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Haryana | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Haryana | Kaithal | Kaithal | | (2.) | Haryana | Karnal | Assandh | | (3.) | Haryana | Sonipat | Gohana | | (4.) | Haryana | Sonipat | Kharkhoda | | (5.) | Haryana | Jind | Narwana | | (6.) | Haryana | Jind | Safidon | | (7.) | Haryana | Rohtak | Rohtak | | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | Yes | (b)MoEF&CC / SEIAA File Number | 10-17/2020-IA.III | (c)Date of Apply of TOR | 12 Feb 2020 | (d)Date of Issue of TOR / Standard ToR | 16 Mar 2020 | (e)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 16 Sep 2020 | Distance of Public Hearing Venue from the Proposed Project : | 15 |
| BDO Office, Asandh | State : | Haryana | District : | Karnal | Tehsil : | Assandh | Village : | Assandh |
| 86 | Land Acquisition, access & irrigation issues | Others | Additional District Collector | (2.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 18 Sep 2020 | Distance of Public Hearing Venue from the Proposed Project : | 0.7 |
| Govt. Girls Sr. Secondary School, Village Nilothi, Jhajjar | State : | Haryana | District : | Jhajjar | Tehsil : | Bahadurgarh | Village : | Nilothi |
| 85 | Compensation, Access and Irrigation facility | Others | Additional District Collector | (3.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 16 Sep 2020 | Distance of Public Hearing Venue from the Proposed Project : | 4 |
| Tehsil Camp, Gohana | State : | Haryana | District : | Sonipat | Tehsil : | Gohana | Village : | Gohana |
| 70 | Related to compensation and acquisition | District Collector | | (4.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 15 Sep 2020 | Distance of Public Hearing Venue from the Proposed Project : | 0.2 |
| Rajiv Gandhi gramin Khel Parisar, Village Gangoli, Jind | State : | Haryana | District : | Jind | Tehsil : | Jind | Village : | Gangoli |
| 89 | Compensation, access and irrigation | Others | Additional District Collector | (5.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 16 Sep 2020 | Distance of Public Hearing Venue from the Proposed Project : | 0.5 |
| Village Kharak Pandwa, Kaithal | State : | Haryana | District : | Kaithal | Tehsil : | Kaithal | Village : | Kharak Pandwa |
| 131 | Land Acquisition, Compensation and Access Issues | Others | Additional District Collector | (6.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 19 Sep 2020 | Distance of Public Hearing Venue from the Proposed Project : | 1.6 |
| Govt Senior Secondary School, Humayunpur, District Rohtak | State : | Haryana | District : | Rohtak | Tehsil : | Rohtak | Village : | Humayupur |
| 65 | Related to compensation and access | Others | Additional District Collector | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Highway project including Structures | 4 Lane / 90 m RoW | 135.056 km | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Highway project including Structures | 135.06 | Kilometers | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 6519 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 52.319 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 40.6 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.717 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0.00 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Borrow Earth | 26867737 | Others | cum | Nearby Approved Source | Road | | 1.7 | Open Market | | Copy of Linkage | (2.) | Emulsion | 5304 | Others | MT | Approved Source | Road | | 1600 | Open Market | | Copy of Linkage | (3.) | Bitumen | 97088 | Others | MT | Nearby Approved Source | Road | | 152 | Open Market | | Copy of Linkage | (4.) | Cement | 347228 | Others | MT | Nearby Approved Source | Road | | 50 | Open Market | | Copy of Linkage | (5.) | Granular Sub- Base | 1426906 | Others | cum | Nearby Approved Quarry | Road | | 112 | Open Market | | Copy of Linkage | (6.) | Steel | 61711 | Others | MT | Nearby Approved Source | Road | | 50 | Open Market | | Copy of Linkage | (7.) | Sand | 354899 | Others | cum | Nearby Approved Quarry | Road | | 110 | Open Market | | Copy of Linkage | (8.) | Fly Ash | 9757983 | Others | cum | Nearby Power Plant | Road | | 88 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2018 To 28 Feb 2019 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 11 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 88.5 | 62.3 | 86.6 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 61.2 | 30.1 | 60.3 | 60 | (3.) | NOx | | Micro Gram per Meter Cube | 41.2 | 21.9 | 38.7 | 80 | (4.) | SO2 | | Micro Gram per Meter Cube | 25.9 | 11.1 | 25.5 | 80 | |
14.2. No. of Ground Water monitoring locations : 11 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Fluoride | | | mg/l | | 6.97 | 0.4 | 1 | 1.5 | (2.) | Total Hardness | | | mg/l | | 1124 | 62 | 200 | 600 | (3.) | TSS | | | mg/l | | 6284 | 886 | 0.00 | 0.00 | (4.) | pH | | | NA | | 8.5 | 7.5 | 6.5 | 8.5 | (5.) | TDS | | | mg/l | | 6280 | 882 | 500 | 2000 | (6.) | Chlorides | | | mg/l | | 2233 | 11.34 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.72 | 8.2 | E | (2.) | COD | | mg/l | | 144 | 8 | E | (3.) | DO | | mg/l | | 7.8 | 6.9 | A | (4.) | BOD | | mg/l | | 26.6 | 6 | E | |
14.4. No. of Ambient Noise monitoring locations : 11 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 68.3 | 49.7 | 75 & 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 61.8 | 43.9 | 70 & 45 | |
14.5. No. of Soil Sample Monitored locations : 10 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Percent | | 0.14 | 0.06 | (2.) | Electric Conductivity | Percent | | 1095 | 190 | (3.) | P(Phosphorus) | Percent | | 32 | 0.00 | (4.) | pH | | | 8.92 | 8.19 | (5.) | K(Potassium) | Percent | | 0.57 | 0.09 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.53 To 35.39 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.35 To 36.68 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 10000 | 0.0 | Copy of Permission Letter | modeOthers | Tankers | Others | . | NA | 21 Sep 2020 | 0.00 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | NA | 0 | 0 | NA | Green Belt Renewal Plant | No discharge is proposed | 0 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 0 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Camp Site Waste | Municipal Solid Waste | | 438 | Tons | 5 | Road | | Others | Composting for Biodegradable & landfill for others | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | Others(Specify) | CO | NA | 1.14 | 0.01 | 0.45 | 1.59 | 2 | (2.) | NOx | | Microgram per Meter Cube | 41.2 | 0.01 | 0.0 | 41.21 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 61.2 | 0.01 | 0.0 | 61.21 | 60 | (4.) | PM10 | | Microgram per Meter Cube | 87.9 | 0.01 | 0.0 | 87.91 | 100 | (5.) | SO2 | | Microgram per Meter Cube | 25.9 | 0.01 | 0.0 | 25.91 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Not Applicable | . | 0.00 | 0.00 | PM10 | | . | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | . | (b)Source | State electricity boards | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 1500 | (e)Stack Height (in m) | . | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 26 | (b)Private Land (ha.) | 1394.6 | (c)Government Land (ha.) | 142.4 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 1563 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 1394.6 | (b)Waste/Barren Land (ha.) | 0.0 | (c)Grazing/ Community Land (ha.) | 0.0 | (d)Surface Water Bodies (ha.) | 0.0 | (e)Settlements (ha.) | 0.0 | (f)Industrial (ha.) | 0.0 | (g)Forest (ha.) | 26 | (h)Mangroves (ha.) | 0.0 | (i)Marine Area (ha.) | 0.0 | (j)Others (ha.) : Govt. Land | 142.4 | Total (ha.) | 1563.0000 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Project RoW including Intersections | 1563 | Project RoW including Intersections | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | None | 0.0 | No within 10km | (2.) | Wildlife Corridors | None | 0 | No within 10km | (3.) | Corridors | None | 0.0 | No within 10km | (4.) | Critically Polluted Area | No Such Area | 0.00 | No within 10km | (5.) | WLS | None | 0.0 | No within 10km | (6.) | ESAs | None | 0.0 | No within 10km | (7.) | ESZs | None | 0.0 | No within 10km | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Protected Forest | 0.0 | Road and canal side plantation declared as forest | (2.) | Defence Installations | | None | 0.0 | No such installation | (3.) | Archaeological Sites | | None | 0.0 | No such site within 300m | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | Under Process(Stage-II) | (b)Legal Status of Forest Land | Protected | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 1563 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Under 3D Stage | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 59 | (b)No. of Households | 1756 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 1756 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0.0 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Indian Pea fowl (Pavo cristatus) | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | 1 Pond, 41 Canals and 11 drains | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 1400 | (b)Permanent Employment-During Operation | 150 | (c)Temporary Employment- During Construction | 1650 | (d)Temporary Employment- During Operation | 100 | (e)No. of working days | 700 | (f)Total Manpower | 3300 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 526 | (b)Percentage of Total Project Area | 33.65 | (c)No. of Plants to be Planted | 247422 | (d)Funds Allocated for Plantation | 48.41 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Lesser Carbon Footprint | (2.) | Social | Social Upliftment | (3.) | Financial | Better reach to the bigger market areas | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-1 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | . | (b)Total No. of Flats to be Build | . | (c)No. of Buildings | . | (d)Total plot area (sqm) | . | (e)Total built up area (sqm) | . | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | . | (b)Capacity | . | (c)No. of Recharge Pits | 270 | (d)Capacity | . | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | . | |
|
5. | Energy Saving Measures: | (a)Source/Mode | NA | (b)Percentage | . | (c)Quantity | . | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | 135.056 | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | (a)Total No. of Bridges | 40 | (b)Total No. of ROB | . | (c)Total No. of Interchanges | 8 | (d)Total No. of Flyovers | 4 | (e)Total No. of Vehicle Underpass | 116 | (f)Total No. of Pedestrian Underpass | . | (g)Details of other utilities rail and road corridors | 371 Box Culvert shall act as PUPs | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1821/RA0116 | (ii)Name of the EIA Consultant | Feedback Infra Pvt. Ltd. | (iii)Address | 15th Floor, Tower, 9B, DLF Cyber City, DLF Phase 3, Sector 24, Gurugram, Haryana 122002 | (iv)Mobile No. | 9868563137 | (v)Landline No. | 0124431664 | (vi)Email Id | raj.singh@feedbackinfra.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-1 | (ix)Validity of Accreditation | 26 Aug 2021 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Please find attached Stage 1 Forest Clearance Letter | 23 Dec 2021 | 2. | NA | kindly enclose stage 1 forest clearance on parivesh portal | 21 Dec 2021 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Dr Biswajit Mukhopadhyay | Designation | General Manager | Name of Company (Applicant Name should not be given here) | National Highways Authority of India | Address | G-5 & 6, Sector-10, Dwarka, New DElhi-110075 |
|