1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | CAPACITY EXPANSION PROJECT FOR MANUFACTURING OF UNSATURATED POLYESTER RESIN FROM 250 MT PER MONTH TO 1200 MT PER MONTH IN ADDITION WITH PROPOSED MANUFACTURING OF PIGMENT PASTE 50 M.T PER MONTH | (b)Name of the Company / Organisation | M/S REVEX PLASTICISERS PVT. LTD. | (c)Registered Address | G-1, 466/467, RIICO Industrial Area, Phase-1, Bhiwadi, Rajasthan,,Alwar,Rajasthan-301019 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Ramesh Chand Gupta | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | E-21, Basement, Naraina Vihar, New Delhi-110028,,Delhi Cantonment.,South West,Delhi-110028 | (d)Pin code | 110028 | (e)E-mail | revexplasticisers2019@gmail.com | (f)STD Code. | 0(f)Telephone No. | | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/RJ/IND2/174359/2004 | (d)Master Proposal Number(Single Window) | SW/174351/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 3 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | G-1, 466/467 | (b)Pincode | 301019 | (c)Bounded Latitudes (North) | | From | | Degree | 2813021 | Minutes | | Second | | From | | Degree | 2813041 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 7650589 | Minutes | | Second | | From | | Degree | 7651015 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | H43W11, H43W12, H43W15, H43W16 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 265 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 5 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Rajasthan | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | fdsgdsjahdfsajk | (b)Date of Apply of TOR | 01 Jan 2004 | (c)Date of Issue of TOR / Standard ToR | 12 Feb 2004 | (d)Date of Apply of EC | 01 Sep 2004 | (e)Date of Issue of EC | 17 Dec 2004 | (f)Previous TOR Letter | Copy of Previous TOR letter | (g)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Public Hearing is exempted as the project site is located inside the notified RIICO Industrial Area, Bhiwadi | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | SPCB | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | | (iii)Letter No. | NA | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Mar 3 2005 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Unsaturated Polyester Resin | 250 | 950 | 1200 | Others | MT/Month | Road | | (2.) | Pigment Paste | 0 | 50 | 50 | Others | MT/Month | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Boiler | 1 Lac KCal/H | 0 | 0 | HSD | (2.) | Boiler | 2 Lac KCal/H | 0 | 0 | HSD Based | (3.) | Boiler | 0 | 10 Lac KCal/H | 10 Lac KCal/H | LPG | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 22 Jun 2017 | (iv)Valid Upto | 31 Mar 2022 | (v)File No. | F(TECH)/ALWAR(TIJARA)/4920(1)/2017-2018/128-129 | (vi)Application No. | 2017-2018/BHIWADI/4907 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 3 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.09 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.03 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.03 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | d)Inter-State boundaries and international boundaries | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 11160000 | (b)Existing quantity of raw material/fuel | 2790000 | (c)Total quantity of raw material/fuel | 13950000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Phthalic Anhydride | 2400000 | Tons per Annum | | Gujarat | Road | | 100 | Open Market | | Copy of Linkage | (2.) | Maleic anhydride | 2400000 | Tons per Annum | | Gujarat | Road | | 150 | Open Market | | Copy of Linkage | (3.) | Propylene Glycol | 750000 | Tons per Annum | | Gujarat | Road | | 150 | Open Market | | Copy of Linkage | (4.) | Diethylene Glycol (DEG) | 3000000 | Tons per Annum | | Gujarat | Road | | 150 | Open Market | | Copy of Linkage | (5.) | Mono Ethylene Glycol | 900000 | Tons per Annum | | Gujarat | Road | | 150 | Open Market | | Copy of Linkage | (6.) | Styrene Monomer | 4500000 | Tons per Annum | | Gujarat | Road | | 150 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2019 To 31 Dec 2019 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 98.4 | 52.9 | 97.31 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 54.7 | 23.5 | 53.19 | 60 | (3.) | NOx | | Micro Gram per Meter Cube | 39.8 | 21.3 | 39.37 | 80 | (4.) | SO2 | | Micro Gram per Meter Cube | 43.6 | 15.7 | 42.95 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.62 | 7.25 | 6.5 | 8.5 | (2.) | TSS | | | mg/l | | 150 | 120 | 500 | 2000 | (3.) | Total Hardness | | | mg/l | | 264 | 210 | 200 | 600 | (4.) | Heavy Metals | | Zinc | mg/l | | 1.58 | 0.95 | 5 | 15 | (5.) | Chlorides | | | mg/l | | 72 | 25.91 | 250 | 1000 | (6.) | Fluoride | | | mg/l | | 0.71 | 0.39 | 1.0 | 1.5 | (7.) | TDS | | | mg/l | | 490 | 351 | 500 | 2000 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.79 | 7.42 | A | (2.) | Others | Potassium | mg/l | | 28 | 16.24 | A | (3.) | DO | | mg/l | | 5.60 | 5.0 | A | (4.) | COD | | mg/l | | 42 | 30 | A | (5.) | BOD | | mg/l | | 13 | 9 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 71.4 | 45.2 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 67.36 | 37.12 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.74 | 7.19 | (2.) | N(Nitrogen) | Kilogram per hectare | | 238 | 209 | (3.) | Electric Conductivity | Millisiemens per Centimetre | | 0.36 | 0.34 | (4.) | P(Phosphorus) | Kilogram per hectare | | 38.12 | 17.89 | (5.) | K(Potassium) | Kilogram per hectare | | 263 | 219 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 40 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 20 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 12 | 3 | Copy of Permission Letter | Pipeline | | Others | RIICO | 76/421460052 | 01 Feb 2005 | 12 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic waste water | 5 | 5 | Septic Tank and STP | Green Belt Renewal Plant | | 5 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 5 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 5 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | 0 | Industrial Waste | | 0 | Kilolitre | 0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 98.4 | 5 | 0.30 | 98.80 | 100 | (2.) | NOx | | Microgram per Meter Cube | 39.8 | 3 | 0.23 | 40.36 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 54.7 | 4 | 0.02 | 54.80 | 60 | (4.) | SO2 | | Microgram per Meter Cube | 43.6 | 5 | 0.76 | 44.80 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler | LPG | 30 | 0.6 | PM10 | | 1.22 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 122500 | (b)Source | Jaipur Vidyut Vitran Nigam Limited | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 2 Existing DG sets with capacity of 125 KVA and 62 | (e)Stack Height (in m) | 6 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0.4 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 0.4 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 62.1 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 30.2 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 2221.6 | (g)Forest (ha.) | 326.6 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Built up Land, fellow Land, Crop land | 29003.9 | Total (ha.) | 31644.4000 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 0.1604 | | (2.) | Built Up Area | | 0.1597 | | (3.) | Others | Open Area | 0.0799 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | NA | 0 | 0 | (2.) | ESAs | NA | 0 | 0 | (3.) | ESZs | NA | 0 | 0 | (4.) | Wildlife Corridors | NA | 0 | 0 | (5.) | Corridors | NA | 0 | 0 | (6.) | Critically Polluted Area | NA | 0 | 0 | (7.) | NPA | NA | 0 | 0 | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | NA | 0 | 0 | (2.) | Defence Installations | | NA | 0 | 0 | (3.) | Archaeological Sites | | NA | 0 | 0 | (4.) | Others | N/A | NA | 0 | 0 | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.4 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | | (b)No. of Households | | (c)No. of PDFs (Project Displaced Families) | | (d)No. of PAFs (Project Affected Families) | | (e)Funds Allocated for R&R(in INR) (in Lacs) | | (f)Status of R&R | NA | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 109 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 300 | (f)Total Manpower | 109 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 0.11 | 0.05 | 0.16 | (2.) | Percentage of Total Project Area | 27.5 | 12.5 | 40 | (3.) | No. of Plants | 400 | 300 | 700 | (4.) | Funds Allocated | 1 | 1 | 2 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Employment Generation | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Industrial Projects - 3 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1922/RA 0166 | (ii)Name of the EIA Consultant | Vardan Environet | (iii)Address | Plot No. 82A, Sector- 5, IMT Manesar, Gurugram, Haryana | (iv)Mobile No. | 9953147268 | (v)Landline No. | 0124434375 | (vi)Email Id | industry@vardanenvironet.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 3 | (ix)Validity of Accreditation | 06 Nov 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | 1. This is an expansion proposal accordingly; the PP shall submit the certified compliance report to the conditions of CTO from the SPCB. (S.No 9 of Form 2 has to revised and uploaded). PP in S.No. 9 mentioned certified compliance report is not applicable. However as per TOR point is must.
2. PP in form 2 (S.No. 8) has not submitted the list of products for which EC is required.
3. PP in form 2 (S.No. 27) has not adequately mentioned the details of R&R. Everything mentioned NA.
4. Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2). PP mentioned Not Applicable.
5. All old CTOs not uploaded to verify the violation, if any done by PP (S No. 9.1 of Form 2).
6. Details of earlier production capacity needs to be authenticated and uploaded to check the violation, if any.
7. Details (S.No. 18.1 at Form 2) w.r.t. Air Quality Impact Prediction needs to checked. PM10 & PM2.5 are very high and reaching the standard of 100 & 60 respectively; please provide detailed mitigation measures in this regard. Please check again and resubmit the data.
8. It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful | 29 Oct 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Ramesh Chand Gupta | Designation | Director | Name of Company (Applicant Name should not be given here) | M/S REVEX PLASTICISERS PVT. LTD. | Address | G-1, 466/467, RIICO Industrial Area, Phase-1, Bhiwadi, Rajasthan |
|