(a)Name of the project(s) Proposed 110 KLPD Molasses Based Distillery along with 4.0 MW Co-generation Power Plant at Village Sewrahi, Block & Post Office Seorahi, Tehsil Tamkuhi Raj, District Kushinagar, Uttar Pradesh by The United Provinces Sugar Company Limited (Distillery Division)
(b)Name of the Company / Organisation THE UNITED PROVINCES SUGAR CO. LTD.
(c)Registered Address C/o 401/405, Jolly Bhavan 1, 10, New Marine Lines, Mumbai,,Mumbai City,Maharashtra-400020
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ramgopal Rameshwarlal Panchbhai
(b)Designation (Owner/ Partner/ CEO) CFO
(c)Address C/o 401/405, Jolly Bhavan 1, 10, New Marine Lines, Mumbai,,Mumbai,Mumbai City,Maharashtra-400020
(d)Pin code 400020
(e)E-mail upsclmumbai@rediffmail.com
(f)STD Code. 22(f)Telephone No. 22003231
(g)Fax No. 22060745
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity
(b)Category A
(c)Proposal Number IA/UP/IND2/113544/2019
(d)Master Proposal Number(Single Window) SW/174135/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 344, 476, 475, 372, 354, 359, 369, 370, 366, 365,
(b)Pincode 274406
(c)Bounded Latitudes (North)
From
Degree 26.72555556
Minutes
Second
From
Degree 26.72944444
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 84.22861111
Minutes
Second
From
Degree 84.23250000
Minutes
Second
(e)Survey of India Topo Sheet No. 72B1, 72B2, 72B5 & 72B6
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 84
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.7
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Uttar PradeshKushinagarTamkuhi Raj
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/249/2019-IA-II(I)
(b)Date of Apply of TOR 05 Aug 2019
(c)Date of Issue of TOR / Standard ToR 21 Aug 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :13 Feb 2020
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :19 Mar 2020
Distance of Public Hearing Venue from the Proposed Project :0.1
Sugar Mill premises
State :Uttar Pradesh
District :Kushinagar
Tehsil :Tamkuhi Raj
Village :Sewrahi
149Water pollution, air pollution, odor problems, fly ash handlingOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Co-generation power plant4.0MW
(2.)Molasses Based Distillery Plant110KLPD
(3.)IMFL/CL bottling plant5000cases/day
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Power4.0Mega Watt(MW)OthersThrough cables
(2.)Ethanol / Extra Neutral Alcohol(ENA)/ Rectified Spirit(RS) / Impure alcohol110Kilo Litre per DayRoad
(3.)IMFL/CL bottles5000Otherscases/dayRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. Not applicable Greenfield project
(vi)Application No. Not applicable Greenfield project
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 135
(b) Funds Allocated for Environment Management (Capital) (in Crores) 40
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.525
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.5
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 175000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 175000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Conc Spent wash as fuel for co generation power plant119000Tons per AnnumInhouse distillery operationsOtherspipelines0 CaptiveCopy of Linkage
(2.)Bagasse as fuel for co generation power plant70000Tons per AnnumOwn sugar millConveyor Belt0.2 LinkageCopy of Linkage
(3.)Molasses as raw material for distillery175000Tons per AnnumOwn & Nearby Sugar MillsRoad,OthersPipeline150 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2019 To 31 Dec 2019
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube52.928.951.4960
(2.)SO2Micro Gram per Meter Cube16.46.216.0480
(3.)PM10Micro Gram per Meter Cube92.464.491.83100
(4.)NOxMicro Gram per Meter Cube30.612.629.9180
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.967.496.58.5
(2.)Chloridesmg/l168.7431.572501000
(3.)Fluoridemg/l0.620.2411.5
(4.)TSSmg/l0000
(5.)TDSmg/l8984025002000
(6.)Total Hardnessmg/l589.5263.68200600
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l86.2A
(2.)BODmg/l3.61.6C
(3.)CODmg/l14.26.8C
(4.)pHNA7.797.22A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))68.951.8Industrial 75, Commercial 65 & Residential 55
(2.)Leq(Night)A-weighted decibels(dB(A))59.741.7Industrial 70, Commercial 55 & Residential 45
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.257.51
(2.)P(Phosphorus)Kilogram per hectare40.7122.61
(3.)Electric ConductivityMillisiemens per Centimetre1.20.23
(4.)N(Nitrogen)Kilogram per hectare275.85117.16
(5.)K(Potassium)Kilogram per hectare192.83104
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.94 To 5.89
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.38 To 4.55
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater8720Copy of Permission LetterPipelineTube WellApplication no. 21-4/9299/UP/IND/202015 Sep 2020872
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial Process9391000ETP/CPU (Anaerobic, aerobic, filters & RO)Reuse within the Plant & Recycling939
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 939
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 939
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)AshFly Ash21350Tons200RoadOthersUsed as manure/given to Brick manufacturers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube27.410.4727.8780
(2.)PM10Microgram per Meter Cube88.210.1188.32100
(3.)PM2.5Microgram per Meter Cube44.60.750.0344.6460
(4.)SO2Microgram per Meter Cube12.610.3913.080
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)35 TPH Incineration BoilerConc. spent wash & Bagasse702PM1050
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 3125
(b)Source 4.0 MW co-generation power plant
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1000 & 1500 KVA
(e)Stack Height (in m) 8
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 4.872
    Total Land (ha.) 4.872
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 25439.24
(b)Waste/Barren Land (ha.) 136.51
(c)Grazing/ Community Land (ha.) 1995.48
(d)Surface Water Bodies (ha.) 2002.09
(e)Settlements (ha.) 3044.69
(f)Industrial (ha.) 13.34
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 32631.3500
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant1.323main plant,machinery & utilities
(2.)Green belt1.619
(3.)OthersStorage, road, office & open area1.93Storage, road, office & open area
Total (ha.) 4.872
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNot Applicable0No CPA within 10 km radius
(2.)Wildlife CorridorsNot Applicable0No Wildlife Corridors within 10 km radius
(3.)WLSNot Applicable0No WLS within 10 km radius
(4.)ESAsNot Applicable0No ESAs within 10 km radius
(5.)NPANot Applicable0No NPA within 10 km radius
(6.)ESZsNot Applicable0No ESZs within 10 km radius
(7.)CorridorsNot Applicable0No Corridors within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNo RF & PF0No forest within 10 km radius
(2.)Archaeological SitesNot Applicable0No Archaeological sites within 10 km radius
(3.)Defence InstallationsNot Applicable0No defence installations within 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 4.87
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired The land is already industrial and in company's po
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Bansi River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 0.7
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 10
(b)Permanent Employment-During Operation 60
(c)Temporary Employment- During Construction 300
(d)Temporary Employment- During Operation 25
(e)No. of working days 350
(f)Total Manpower 395
32.
Green Belt in Ha:
(a)Total Area of Green Belt 1.61
(b)Percentage of Total Project Area 33.05
(c)No. of Plants to be Planted 2440
(d)Funds Allocated for Plantation 2500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalProject will contribute in Ethanol Blending Program (EBP) driven by Govt. of India
(2.)SocialEmployment generation and CER activities
(3.)FinancialImproved Livelihood with increased business opportunities
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/SA 0097
(ii)Name of the EIA Consultant J M EnviroNet Pvt. Ltd.
(iii)Address JM EnviroNet Pvt. Ltd., 202A, ABW Tower, Near Iffco Chowk, Sector 25, Gurugram (Haryana)
(iv)Mobile No. 9015209362
(v)Landline No. 9015209362
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 29 Sep 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRamgopal Rameshwarlal Panchbhai
DesignationCFO
Name of Company (Applicant Name should not be given here)THE UNITED PROVINCES SUGAR CO. LTD.
AddressC/o 401/405, Jolly Bhavan 1, 10, New Marine Lines, Mumbai