Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed 45 KLPD Molasses/sugarcane Juice based Distillery & 20.5 MW Cogeneration Power
(b)Name of the Company / Organisation SHREE LAXMI NARSHINHA SUGAR LLP
(c)Registered Address At Amdapur, post Singnapur, Tal & Dist Parbhani,,Parbhani,Maharashtra-431402
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ashok Thorat
(b)Designation (Owner/ Partner/ CEO) General Manager
(c)Address At Amdapur, post Singnapur, Tal Dist Parbhani,,,Parbhani,Maharashtra-431402
(d)Pin code 431402
(e)E-mail mnsugars@gmail.com
(f)STD Code. 20(f)Telephone No. 66289407
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/MH/IND2/173992/2020
(d)Master Proposal Number(Single Window) SW/173965/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 34,40,43,45,47,48,49,51,52,53,54,55,58,59,61,62,63
(b)Pincode 431402
(c)Bounded Latitudes (North)
From
Degree 19.1719
Minutes
Second
From
Degree 19.1730
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 76.7622
Minutes
Second
From
Degree 76.770
Minutes
Second
(e)Survey of India Topo Sheet No. 56 A/11, 56 A/12, 56 A/15, 56A/16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 422
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 13
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number SIA/MH/IND/49916/2020
(b)Date of Apply of TOR 21 Jan 2020
(c)Date of Issue of TOR / Standard ToR 29 May 2020
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :20 Jun 2020
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :22 Jul 2020
Distance of Public Hearing Venue from the Proposed Project :9.3
Collector Office, Parbhani
State :Maharashtra
District :Parbhani
Tehsil :Parbhani
Village :Amdapur
40Queries on Air, Water and Noise pollutionOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Cogeneration20.5 MWBagasses based
(2.)Distillery45 KLPDmolasses/sugarcane juice based distillery
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Cogeneration power plant20.5Mega Watt(MW)Road
(2.)ENA/RS/AA/Ethanol45Kilo Litre per DayRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 18 Sep 2020
(iv)Valid Upto 18 Sep 2020
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 115.84
(b) Funds Allocated for Environment Management (Capital) (in Crores) 8.3
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.73
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.29
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 37800
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 37800
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Molasses37800Tons per Annumown Sugar unitRoad0.3 OthersOwn sugar factoryCopy of Linkage
(2.)sugarcane juice128000Othersm3/AOwn sugarRoad0.3 OthersOwn sugar factoryCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2019 To 31 Dec 2019
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube58.737.453.5100
(2.)PM2.5Micro Gram per Meter Cube23.614.221.260
(3.)SO2Micro Gram per Meter Cube15.06.112.4780
(4.)NOxMicro Gram per Meter Cube18.79.316.4580
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l4952525002000
(2.)pHNA7.67.06.58.5
(3.)TSSmg/l4400
(4.)Heavy MetalsHexavalent Chromiummg/l0000
(5.)Total Hardnessmg/l195.15113.0200600
(6.)Fluoridemg/l0.010.0111.5
(7.)Chloridesmg/l58.1425.622501000
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.277.0A
(2.)BODmg/l11D
(3.)DOmg/l5.34.8C
(4.)CODmg/l55D
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))44.139.845
(2.)Leq(Day)A-weighted decibels(dB(A))50.144.555
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.37.9
(2.)K(Potassium)Kilogram per hectare200.4104.2
(3.)N(Nitrogen)Kilogram per hectare136.5112.5
(4.)P(Phosphorus)Kilogram per hectare25.216.5
(5.)Electric ConductivityMillisiemens per Centimetre1500.8712.8
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 13.5 To 3.5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.3 To 14.85
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface4000.4Copy of Permission LetterPipelineOthersPumpingNA18 Sep 202000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Spent lees, condensate water, blow down426.5465Condensate treatment plantReuse within the Plant & Recycling426.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 426.5
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 426.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)CPU sludgeOthersCPU sludge480Tons0.3RoadOthersComposting
(2.)Yeast sludgeOthersYeast sludge6750Tons0.3RoadOthersComposting
(3.)Bagasse ashOthersBagasse Ash5400Tons0.3RoadOthersComposting/ directly sell to farmers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube21.30.620.021.3260
(2.)NOxMicrogram per Meter Cube16.10.410.9117.280
(3.)PM10Microgram per Meter Cube57.40.60.057.42100
(4.)SO2Microgram per Meter Cube12.70.42.1114.8180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)90 TPH boilerBagasse653.5PM100.0134
(2.)15 TPH BoilerBagasse and Biogas453.0SO23.2
(3.)15 TPH BoilerBagasse and Biogas453.0PM100.0007
(4.)90 TPH BoilerBagasse653.5SO27.6
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 8000
(b)Source own power generation
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 500vkVA and 250 kVA
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 41.45
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 41.45
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 28719
(b)Waste/Barren Land (ha.) 1278
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 99
(e)Settlements (ha.) 1263
(f)Industrial (ha.) 0
(g)Forest (ha.) 00
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 54
    Total (ha.) 31413.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersSugar, Distillery, open space and road27.6319Total industrial activity area
(2.)Green belt13.8240Total greenbelt area
Total (ha.) 41.4559
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNA0NA
(2.)ESZsNA0NA
(3.)CorridorsNA0NA
(4.)Critically Polluted AreaNA0NA
(5.)WLSNA00
(6.)NPANA00
(7.)Wildlife CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NA
(2.)Defence InstallationsNA0NA
(3.)Archaeological SitesNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not acquisition is not required.
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Water canal
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 0.53
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 30
(c)Temporary Employment- During Construction 40
(d)Temporary Employment- During Operation 47
(e)No. of working days 270
(f)Total Manpower 117
32.
Green Belt in Ha:
(a)Total Area of Green Belt 13.82
(b)Percentage of Total Project Area 33.34
(c)No. of Plants to be Planted 8000
(d)Funds Allocated for Plantation 2000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialAvailable infrastructure, fuel, & water for renewable energy power generation project. ? Provides an initiative to sugar mill to concentrate more on conservation of energy & reduction of operation cost
(2.)SocialThe industry is in the rural and backward region. Creation of job opportunity.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/SA0115
(ii)Name of the EIA Consultant MITCON Consultancy & Engineering Services Ltd.
(iii)Address Behind DIC Office, Agriculture College Campus, Shivajinagar, Pune 411 005, Maharashtra (INDIA)
(iv)Mobile No. 9665043400
(v)Landline No. 2066289400
(vi)Email Id eme@mitconindia.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 04 Feb 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAshok Thorat
DesignationGeneral Manager
Name of Company (Applicant Name should not be given here)SHREE LAXMI NARSHINHA SUGAR LLP
AddressAt Amdapur, post Singnapur, Tal & Dist Parbhani