Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Industrial Park near Kosalanagaram Village, Vijayapuram Mandal of Chittoor District, Andhra Pradesh
(b)Name of the Company / Organisation ANDHRA PRADESH INDUSTRIAL INFRA STRUCTURE CORPORATION
(c)Registered Address ANDHRA PRADESH INDUSTRIAL INFRASTRUCTURE CORPORATION, 4th FLOOR, PARISRAMA BHAVAN, 5-9-58/B, FATEH MAIDAN ROAD.,,Hyderabad,Telangana-500004
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Vice Chairman and Managing Director VCMD
(b)Designation (Owner/ Partner/ CEO) VCMD
(c)Address ANDHRA PRADESH INDUSTRIAL INFRASTRUCTURE CORPORATION LIMITED, Tower – 1, Plot No – 1, IT Park, Auto Nagar, Mangalagiri – 522 503, Guntur District, Andhra Pradesh,,,Guntur,Andhra Pradesh-522503
(d)Pin code 522503
(e)E-mail apiicempcell@gmail.com
(f)STD Code. 863(f)Telephone No. 2381850
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
Minor Activity7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
(b)Category A
(c)Proposal Number IA/AP/NCP/121081/2019
(d)Master Proposal Number(Single Window) SW/173570/2020
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 1,123,120 & 121
(b)Pincode 517586
(c)Bounded Latitudes (North)
From
Degree 79.730706
Minutes
Second
From
Degree 79.741708
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 13.251764
Minutes
Second
From
Degree 13.262897
Minutes
Second
(e)Survey of India Topo Sheet No. D44N11 D44N12 D44N15 D44N16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 383
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3.7
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Andhra Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Andhra PradeshChittoorVijayapuram
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 21-76/2019-IA.III
(c)Date of Apply of TOR 10 Oct 2019
(d)Date of Issue of TOR / Standard ToR 21 Nov 2019
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :13 Jun 2020
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :14 Jul 2020
Distance of Public Hearing Venue from the Proposed Project :0
Project Site
State :Andhra Pradesh
District :Chittoor
Tehsil :Vijayapuram
Village :Kosalanagaram
100Requested for Eco-friendly industries, No DKT land belonging to SC,ST&BC are to be acquired, employment to local peopleOthersDistrict Revenue Officer and Additional District Magistrate, Chittoor District
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)industrial park631.22 ha
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Industrial park631.22HectaresRoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores)
(b) Funds Allocated for Environment Management (Capital) (in Crores) 55.5
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.4
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 3.57
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? Yes
8.(a) If any Industrial Estate/Complex / Export processing Zones /Special Economic Zones/Biotech Parks / Leather Complex with homogeneous type of industries such as Items 4(d), 4(f), 5(e), 5(f), or those Industrial estates with pre –defined set of activities (not necessarily homogeneous, obtains prior environmental clearance, individual industries including proposed industrial housing within such estates /complexes will not be required to take prior environmental clearance, so long as the Terms and Conditions for the industrial estate/complex are complied with (Such estates/complexes must have a clearly identified management with the legal responsibility of ensuring adherence to the Terms and Conditions of prior environmental clearance, who may be held responsible for violation of the same throughout the life of the complex/estate
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Not applicable631.22HectaresNAOthersNot Applicable0 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 08 Nov 2019 To 27 Jan 2020
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube56.0035.053.9100
(2.)PM2.5Micro Gram per Meter Cube241022.560
(3.)SO2Micro Gram per Meter Cube8.03.77.180
(4.)NOxMicro Gram per Meter Cube17.78.716.280
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l162729300
(2.)pHNA7.426.676.58.5
(3.)Total Hardnessmg/l45991200600
(4.)Chloridesmg/l282632501000
(5.)TDSmg/l16252925002000
(6.)Fluoridemg/l0.750.4211.5
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.866.6C
(2.)DOmg/l6.55.1C
(3.)CODmg/l4720C
(4.)BODmg/l83C
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))43.8440.3245
(2.)Leq(Day)A-weighted decibels(dB(A))52.7550.3955
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityOthersµMohs/Cm2110115
(2.)P(Phosphorus)Kilogram per hectare48885
(3.)pH8.037.14
(4.)K(Potassium)Kilogram per hectare155.721.6
(5.)N(Nitrogen)Kilogram per hectare463125
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.35 To 19.00
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.03 To 18.75
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface340050Copy of Permission LetterPipelineIntake WellENC(I)/EE/DEE1/AEE2/IWS(CMP Industrial Park)15 Sep 202024000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Effluent from industries15001500CETPReuse within the Plant & Recycling,OthersNon Potable usage1000500
(2.)Sewage from residential area250250STPGreen Belt Renewal Plant,OthersNon Potable usage20050
(3.)Sewage from industrial area300300CETPReuse within the Plant & Recycling,OthersNon Potable usage200100
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 2050
(b)Total Discharged Water (Kilolitre per Day) 650
(c)Total Reused Water (Kilolitre per Day) 1400
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Industrial wasteIndustrial Waste29Tons102Road,OthersClosed containersTreatment, Storage and Disposal Facility(TSDF)
(2.)Municipal Solid WasteMunicipal Solid Waste6.5Tons0OthersAPPCB approved vendors by respective industryAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube6.61.915.4822.0980
(2.)NOxMicrogram per Meter Cube16.41.911.9128.3280
(3.)PM10Microgram per Meter Cube561.52.6658.7100
(4.)PM2.5Microgram per Meter Cube241.51.0625.0760
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG setDiesel150.2SO20.059
(2.)DG setDiesel300.3OthersPM 2.50.0051
(3.)DG setDiesel150.1OthersPM 2.50.0001
(4.)DG setDiesel150.1NOx0.163
(5.)DG setDiesel150.2PM100.0008
(6.)DG setDiesel300.3NOx1.314
(7.)DG setDiesel150.1PM100.0002
(8.)DG setDiesel150.1SO20.029
(9.)DG setDiesel150.2OthersPM 2.50.0003
(10.)DG setdiesel300.3PM100.0126
(11.)DG setDiesel150.2NOx0.325
(12.)DG setDiesel300.3SO20.237
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 28700
(b)Source APTRANSCO/APSPDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) DG sets will be used in case of uninterrupted powe
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 7.44
(c)Government Land (ha.) 623.78
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 631.22
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 45.40
(b)Waste/Barren Land (ha.) 585.82
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 631.2200
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant304.69
(2.)Township35.04Residential
(3.)Green belt114.64Green areas, open spaces, Green Belt
(4.)Water Reservoir9.37Water bodies, retention ponds
(5.)Built Up Area76.55Amenities, logistic hub, utilities
(6.)OthersRoads, 100 m buffer along state boundary90.91roads, buffer
Total (ha.) 631.2
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNA0NA
(2.)Wildlife CorridorsNA0NA
(3.)WLSNA0NA
(4.)NPANA0NA
(5.)ESAsNA0NA
(6.)ESZsNA0NA
(7.)Critically Polluted AreaNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestAllikuli RF(TN)0.1Pulikundram RF-5.1 km, Nayappakkam RF(TN)-9.6 km, Kolattur RF(TN)-9.6
(2.)Defence InstallationsNA0NA
(3.)Archaeological SitesNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 4635
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 623.79
(b)Land yet to be acquired(Ha) 7.44
(c)Status of Land acquisition if not acquired Land Acquisition is under process
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Peafowl
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 55 Lakhs
(iii)Period of Implementation 5 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. Email correspondence with DFO Chittoor
(iii)Date of issue 16 Sep 2020
(iv)Recommendation Suggested extra budget of 15 lc. for insitu conser
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Natural streams are present in project site
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Nandi river-5.6 km, SW; Allikuli Nadi-2.4 km, E; Poondi lake or Satyamurthi sagar-9.2 km, SE
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 2.4
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 250
(b)Permanent Employment-During Operation 10000
(c)Temporary Employment- During Construction 250
(d)Temporary Employment- During Operation 15000
(e)No. of working days 345
(f)Total Manpower 25500
32.
Green Belt in Ha:
(a)Total Area of Green Belt 283.26
(b)Percentage of Total Project Area 44.88
(c)No. of Plants to be Planted 127367
(d)Funds Allocated for Plantation 12400000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialIncreased Employment opportunities and improved socio-economic conditions in the villages.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 15
(b)Total No. of Flats to be Build 15100
(c)No. of Buildings 320
(d)Total plot area (sqm) 521356.461
(e)Total built up area (sqm) 1042713
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 4
(b)Capacity 11.58
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking Parking arrangements are considered in the master
5.
Energy Saving Measures:
(a)Source/Mode Solar Power
(b)Percentage 0.07
(c)Quantity 0.02
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area In Kosalanagaram IP both, open box type and trapez
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
(1.)Automobile and Auto Components23A
(2.)Engineering (Heavy & Light)20A
(3.)MSME12B
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2023/RA 0175
(ii)Name of the EIA Consultant L&T Infrastructure Engineering Limited, Hyderabad
(iii)Address House No. 6-3-1192/1/1, 5th Floor, Block No. 3, White House, Kundan Bagh, Begumpet, Hyderabad – 500016
(iv)Mobile No. 9491035052
(v)Landline No. 0404035444
(vi)Email Id sap@lntiel.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 02 Mar 2023
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVice Chairman and Managing Director VCMD
DesignationVCMD
Name of Company (Applicant Name should not be given here)ANDHRA PRADESH INDUSTRIAL INFRA STRUCTURE CORPORATION
AddressANDHRA PRADESH INDUSTRIAL INFRASTRUCTURE CORPORATION, 4th FLOOR, PARISRAMA BHAVAN, 5-9-58/B, FATEH MAIDAN ROAD.