1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Industrial Park near Kosalanagaram Village, Vijayapuram Mandal of Chittoor District, Andhra Pradesh | (b)Name of the Company / Organisation | ANDHRA PRADESH INDUSTRIAL INFRA STRUCTURE CORPORATION | (c)Registered Address | ANDHRA PRADESH INDUSTRIAL INFRASTRUCTURE CORPORATION, 4th FLOOR, PARISRAMA BHAVAN, 5-9-58/B, FATEH MAIDAN ROAD.,,Hyderabad,Telangana-500004 | (d)Legal Status of the Company | State Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Vice Chairman and Managing Director VCMD | (b)Designation (Owner/ Partner/ CEO) | VCMD | (c)Address | ANDHRA PRADESH INDUSTRIAL INFRASTRUCTURE CORPORATION LIMITED, Tower – 1, Plot No – 1, IT Park, Auto Nagar,
Mangalagiri – 522 503,
Guntur District, Andhra Pradesh,,,Guntur,Andhra Pradesh-522503 | (d)Pin code | 522503 | (e)E-mail | apiicempcell@gmail.com | (f)STD Code. | 863(f)Telephone No. | 2381850 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
| Minor Activity | 7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
| (b)Category | A | (c)Proposal Number | IA/AP/NCP/121081/2019 | (d)Master Proposal Number(Single Window) | SW/173570/2020 | (e)EAC concerned (for category A Projects only) | INFRA-1 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 1,123,120 & 121 | (b)Pincode | 517586 | (c)Bounded Latitudes (North) | | From | | Degree | 79.730706 | Minutes | | Second | | From | | Degree | 79.741708 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 13.251764 | Minutes | | Second | | From | | Degree | 13.262897 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | D44N11 D44N12 D44N15 D44N16 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 383 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 3.7 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Andhra Pradesh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Andhra Pradesh | Chittoor | Vijayapuram | | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | Yes | (b)MoEF&CC / SEIAA File Number | 21-76/2019-IA.III | (c)Date of Apply of TOR | 10 Oct 2019 | (d)Date of Issue of TOR / Standard ToR | 21 Nov 2019 | (e)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 14 Jul 2020 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Project Site | State : | Andhra Pradesh | District : | Chittoor | Tehsil : | Vijayapuram | Village : | Kosalanagaram |
| 100 | Requested for Eco-friendly industries, No DKT land belonging to SC,ST&BC are to be acquired, employment to local people | Others | District Revenue Officer and Additional District Magistrate, Chittoor District | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | industrial park | 631.22 ha | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Industrial park | 631.22 | Hectares | | Road,Rail | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 55.5 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 4.4 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 3.57 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | d)Inter-State boundaries and international boundaries | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | Yes | 8.(a) | If any Industrial Estate/Complex / Export processing Zones /Special Economic Zones/Biotech Parks / Leather Complex with homogeneous type of industries such as Items 4(d), 4(f), 5(e), 5(f), or those Industrial estates with pre –defined set of activities (not necessarily homogeneous, obtains prior environmental clearance, individual industries including proposed industrial housing within such estates /complexes will not be required to take prior environmental clearance, so long as the Terms and Conditions for the industrial estate/complex are complied with (Such estates/complexes must have a clearly identified management with the legal responsibility of ensuring adherence to the Terms and Conditions of prior environmental clearance, who may be held responsible for violation of the same throughout the life of the complex/estate | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Not applicable | 631.22 | Hectares | | NA | Others | Not Applicable | 0 | Linkage | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 08 Nov 2019 To 27 Jan 2020 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 56.00 | 35.0 | 53.9 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 24 | 10 | 22.5 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 8.0 | 3.7 | 7.1 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 17.7 | 8.7 | 16.2 | 80 | |
14.2. No. of Ground Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 1627 | 293 | 0 | 0 | (2.) | pH | | | NA | | 7.42 | 6.67 | 6.5 | 8.5 | (3.) | Total Hardness | | | mg/l | | 459 | 91 | 200 | 600 | (4.) | Chlorides | | | mg/l | | 282 | 63 | 250 | 1000 | (5.) | TDS | | | mg/l | | 1625 | 292 | 500 | 2000 | (6.) | Fluoride | | | mg/l | | 0.75 | 0.42 | 1 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.86 | 6.6 | C | (2.) | DO | | mg/l | | 6.5 | 5.1 | C | (3.) | COD | | mg/l | | 47 | 20 | C | (4.) | BOD | | mg/l | | 8 | 3 | C | |
14.4. No. of Ambient Noise monitoring locations : 6 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 43.84 | 40.32 | 45 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 52.75 | 50.39 | 55 | |
14.5. No. of Soil Sample Monitored locations : 6 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | Electric Conductivity | Others | µMohs/Cm | 2110 | 115 | (2.) | P(Phosphorus) | Kilogram per hectare | | 488 | 85 | (3.) | pH | | | 8.03 | 7.14 | (4.) | K(Potassium) | Kilogram per hectare | | 155.7 | 21.6 | (5.) | N(Nitrogen) | Kilogram per hectare | | 463 | 125 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.35 To 19.00 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.03 To 18.75 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 3400 | 50 | Copy of Permission Letter | Pipeline | | Intake Well | | ENC(I)/EE/DEE1/AEE2/IWS(CMP Industrial Park) | 15 Sep 2020 | 24000 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Effluent from industries | 1500 | 1500 | CETP | Reuse within the Plant & Recycling,Others | Non Potable usage | 1000 | 500 | (2.) | Sewage from residential area | 250 | 250 | STP | Green Belt Renewal Plant,Others | Non Potable usage | 200 | 50 | (3.) | Sewage from industrial area | 300 | 300 | CETP | Reuse within the Plant & Recycling,Others | Non Potable usage | 200 | 100 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 2050 | (b)Total Discharged Water (Kilolitre per Day) | 650 | (c)Total Reused Water (Kilolitre per Day) | 1400 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Industrial waste | Industrial Waste | | 29 | Tons | 102 | Road,Others | Closed containers | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | Municipal Solid Waste | Municipal Solid Waste | | 6.5 | Tons | 0 | Others | APPCB approved vendors by respective industry | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 6.6 | 1.9 | 15.48 | 22.09 | 80 | (2.) | NOx | | Microgram per Meter Cube | 16.4 | 1.9 | 11.91 | 28.32 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 56 | 1.5 | 2.66 | 58.7 | 100 | (4.) | PM2.5 | | Microgram per Meter Cube | 24 | 1.5 | 1.06 | 25.07 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG set | Diesel | 15 | 0.2 | SO2 | | 0.059 | (2.) | DG set | Diesel | 30 | 0.3 | Others | PM 2.5 | 0.0051 | (3.) | DG set | Diesel | 15 | 0.1 | Others | PM 2.5 | 0.0001 | (4.) | DG set | Diesel | 15 | 0.1 | NOx | | 0.163 | (5.) | DG set | Diesel | 15 | 0.2 | PM10 | | 0.0008 | (6.) | DG set | Diesel | 30 | 0.3 | NOx | | 1.314 | (7.) | DG set | Diesel | 15 | 0.1 | PM10 | | 0.0002 | (8.) | DG set | Diesel | 15 | 0.1 | SO2 | | 0.029 | (9.) | DG set | Diesel | 15 | 0.2 | Others | PM 2.5 | 0.0003 | (10.) | DG set | diesel | 30 | 0.3 | PM10 | | 0.0126 | (11.) | DG set | Diesel | 15 | 0.2 | NOx | | 0.325 | (12.) | DG set | Diesel | 30 | 0.3 | SO2 | | 0.237 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 28700 | (b)Source | APTRANSCO/APSPDCL | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | DG sets will be used in case of uninterrupted powe | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 7.44 | (c)Government Land (ha.) | 623.78 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 631.22 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 45.40 | (b)Waste/Barren Land (ha.) | 585.82 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 631.2200 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 304.69 | | (2.) | Township | | 35.04 | Residential | (3.) | Green belt | | 114.64 | Green areas, open spaces, Green Belt | (4.) | Water Reservoir | | 9.37 | Water bodies, retention ponds | (5.) | Built Up Area | | 76.55 | Amenities, logistic hub, utilities | (6.) | Others | Roads, 100 m buffer along state boundary | 90.91 | roads, buffer | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Corridors | NA | 0 | NA | (2.) | Wildlife Corridors | NA | 0 | NA | (3.) | WLS | NA | 0 | NA | (4.) | NPA | NA | 0 | NA | (5.) | ESAs | NA | 0 | NA | (6.) | ESZs | NA | 0 | NA | (7.) | Critically Polluted Area | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Allikuli RF(TN) | 0.1 | Pulikundram RF-5.1 km, Nayappakkam RF(TN)-9.6 km, Kolattur RF(TN)-9.6 | (2.) | Defence Installations | | NA | 0 | NA | (3.) | Archaeological Sites | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 623.79 | (b)Land yet to be acquired(Ha) | 7.44 | (c)Status of Land acquisition if not acquired | Land Acquisition is under process | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | | (b)No. of Households | | (c)No. of PDFs (Project Displaced Families) | | (d)No. of PAFs (Project Affected Families) | | (e)Funds Allocated for R&R(in INR) (in Lacs) | | (f)Status of R&R | NA | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Indian Peafowl | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 55 Lakhs | (iii)Period of Implementation | 5 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | Yes | (i)Uploaded copy of approval | Copy of approval | (ii)Letter No. | Email correspondence with DFO Chittoor | (iii)Date of issue | 16 Sep 2020 | (iv)Recommendation | Suggested extra budget of 15 lc. for insitu conser | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Natural streams are present in project site | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Nandi river-5.6 km, SW; Allikuli Nadi-2.4 km, E; Poondi lake or Satyamurthi sagar-9.2 km, SE | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 2.4 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 250 | (b)Permanent Employment-During Operation | 10000 | (c)Temporary Employment- During Construction | 250 | (d)Temporary Employment- During Operation | 15000 | (e)No. of working days | 345 | (f)Total Manpower | 25500 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 283.26 | (b)Percentage of Total Project Area | 44.88 | (c)No. of Plants to be Planted | 127367 | (d)Funds Allocated for Plantation | 12400000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Increased Employment opportunities and improved socio-economic conditions in the villages. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-1 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 15 | (b)Total No. of Flats to be Build | 15100 | (c)No. of Buildings | 320 | (d)Total plot area (sqm) | 521356.461 | (e)Total built up area (sqm) | 1042713 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 4 | (b)Capacity | 11.58 | (c)No. of Recharge Pits | 0 | (d)Capacity | 0 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | Parking arrangements are considered in the master | |
|
5. | Energy Saving Measures: | (a)Source/Mode | Solar Power | (b)Percentage | 0.07 | (c)Quantity | 0.02 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
(1.) | Automobile and Auto Components | 23 | A | (2.) | Engineering (Heavy & Light) | 20 | A | (3.) | MSME | 12 | B | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/2023/RA 0175 | (ii)Name of the EIA Consultant | L&T Infrastructure Engineering Limited, Hyderabad | (iii)Address | House No. 6-3-1192/1/1, 5th Floor, Block No. 3, White House, Kundan Bagh, Begumpet, Hyderabad – 500016 | (iv)Mobile No. | 9491035052 | (v)Landline No. | 0404035444 | (vi)Email Id | sap@lntiel.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-1 | (ix)Validity of Accreditation | 02 Mar 2023 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Vice Chairman and Managing Director VCMD | Designation | VCMD | Name of Company (Applicant Name should not be given here) | ANDHRA PRADESH INDUSTRIAL INFRA STRUCTURE CORPORATION | Address | ANDHRA PRADESH INDUSTRIAL INFRASTRUCTURE CORPORATION, 4th FLOOR, PARISRAMA BHAVAN, 5-9-58/B, FATEH MAIDAN ROAD. |
|