Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Environmental Clearance For Expansion OF “Proposed Construction of 171 Nos. (T/II- 119, T/III-24, T/IV- 10 & T/V-18) Family quarters & 01-180 Men barracks, Phase 1 at BCS Bawana, CRPF, New Delhi
(b)Name of the Company / Organisation CENTRAL RESERVE POLICE FORCE, BAWANA
(c)Registered Address 55 Bn, CRPF Bawana, New Delhi,,North West,Delhi-110039
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Deepak Dhoundiyal
(b)Designation (Owner/ Partner/ CEO) COM
(c)Address 55 Bn, CRPF Bawana, New Delhi,,Narela,North West,Delhi-110039
(d)Pin code 110039
(e)E-mail crpfbawanaeia@gmail.com
(f)STD Code. 11(f)Telephone No. 27751197
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(a) Building and Construction projects
Minor Activity
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/DL/MIS/173639/2020
(d)Master Proposal Number(Single Window) SW/173637/2020
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. details are given in land document which is attach
(b)Pincode 110039
(c)Bounded Latitudes (North)
From
Degree 28.809315
Minutes
Second
From
Degree 28.809861
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 77.046928
Minutes
Second
From
Degree 77.046980
Minutes
Second
(e)Survey of India Topo Sheet No. 53H1
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 218
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 16
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application No
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason As it is a building and construction project
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)NANANA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)NA0OthersNARoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 62.23
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.56
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.24
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.22
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)**0OthersNA0Road0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 04 Feb 2020 To 29 Feb 2020
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube21889217.8660
(2.)SO2Micro Gram per Meter Cube17.3010.6017.1680
(3.)PM10Micro Gram per Meter Cube365162361.92100
(4.)NOxMicro Gram per Meter Cube45.5023.6045.4280
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.208.206.58.5
(2.)Heavy MetalsZinemg/l0.010.01515
(3.)Chloridesmg/l2602602501000
(4.)Fluoridemg/l0.260.2611.5
(5.)Total Hardnessmg/l396396200600
(6.)TSSmg/l0000
(7.)TDSmg/l106810685002000
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.336.87E
(2.)DOmg/l6.31.1D
(3.)BODmg/l639.2D
(4.)CODmg/l24050D
    14.4.     No. of Ambient Noise monitoring locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))55.344.155
(2.)Leq(Night)A-weighted decibels(dB(A))43.938.545
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milligram per Kilogram52.052.0
(2.)pH8.218.21
(3.)P(Phosphorus)Milligram per Kilogram9.49.4
(4.)Electric ConductivityOthersµS/cm522522
(5.)N(Nitrogen)Milligram per Kilogram3434
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 11 To 14
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 11 To 14
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersDJB750.1Copy of Permission LetterPipelineOthersPipe LineWill be submitted at the time of presentation12 Aug 202075
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)On Site84100On site STPReuse within the Plant & Recycling,Green Belt Renewal Plant84
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 84
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 84
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Solid WasteMunicipal Solid Waste200.75Tons0.1RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube157.250.20.21157.4760
(2.)PM10Microgram per Meter Cube267.630.20.32267.96100
(3.)NOxMicrogram per Meter Cube38.130.23.1941.3380
(4.)SO2Microgram per Meter Cube14.760.20.4615.2380
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetUltra Low Sulphur60.45PM100.21
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1421
(b)Source TPDDL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1000 (500x2)
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 00
(b)Private Land (ha.) 00
(c)Government Land (ha.) 42.89
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 00
    Total Land (ha.) 42.89
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) .
(b)Waste/Barren Land (ha.) .
(c)Grazing/ Community Land (ha.) .
(d)Surface Water Bodies (ha.) .
(e)Settlements (ha.) .
(f)Industrial (ha.) .
(g)Forest (ha.) .
(h)Mangroves (ha.) .
(i)Marine Area (ha.) .
(j)Others (ha.) : NA .
    Total (ha.) NaN
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt1.92Proposed Green Area
Total (ha.) 1.92
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNothing Specific0Nothing Specific
(2.)CorridorsNA0Nothing Specific
(3.)ESAsNothing Specific0Nothing Specific
(4.)ESZsNA0Nothing Specific
(5.)Critically Polluted AreaNA0Nothing Specific
(6.)NPAMamupur PF8.6NE
(7.)Wildlife CorridorsNA0Nothing Specific
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNot Envisaged0Not Envisaged
(2.)Defence InstallationsAir Force Station, Ghoga0.25NW direction
(3.)ForestBawana RF1NE
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 09
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 42.89
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired The Landuse of 97 acres out of total 106 acres was
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Western Yamuna Canal
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 0.05
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 61
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 39
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 100
32.
Green Belt in Ha:
(a)Total Area of Green Belt 1.92
(b)Percentage of Total Project Area 4.48
(c)No. of Plants to be Planted 865
(d)Funds Allocated for Plantation 1400000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment will be generated during construction phase.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 33.6
(b)Total No. of Flats to be Build 171
(c)No. of Buildings 5
(d)Total plot area (sqm) 69146.38
(e)Total built up area (sqm) 23441.48
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 4
(d)Capacity 22.2
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 468
5.
Energy Saving Measures:
(a)Source/Mode As per ECBC
(b)Percentage .
(c)Quantity .
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area NA
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court Districts Courts
(c)Name of the Sub Court Delhi
(d)Case No. LAC No. 45/2017 filed by Surjeet @ Surajmal vs Uni
(e)Orders/Directions of the court ,if any and its relevance with the proposed project Court passed order on 19th January 2019 on LAC No.
(f)Case Details Final hearing to take place.
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA 0098
(ii)Name of the EIA Consultant Ind Tech House Consult
(iii)Address G 8/6, Ground Floor, Rohini Sector 11, New Delhi
(iv)Mobile No. 8860080363
(v)Landline No. 0112757141
(vi)Email Id dubeyakw1@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 31 Jan 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAplease specify whether it is expansion of existing facility or new construction. Pl indicate in specified column about built up area. 04 Oct 2020
2.NAThe correction have been made as per the instruction received 06 Oct 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDeepak Dhoundiyal
DesignationCOM
Name of Company (Applicant Name should not be given here)CENTRAL RESERVE POLICE FORCE, BAWANA
Address55 Bn, CRPF Bawana, New Delhi
Print