Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed project for manufacturing of Synthetic Organic Chemicals - Pigment Green 7 by M/s. Shrey Industries
(b)Name of the Company / Organisation SHREY INDUSTRIES
(c)Registered Address Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar,,Gandhinagar,Gujarat-382715
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Sanjaykumar Bhogilal Patel
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address Survey No. 111 and 112, Plot No. 7 and 8, Dhanot, Kalol, Gandhinagar,,Kalol,Gandhinagar,Gujarat-382715
(d)Pin code 382715
(e)E-mail shreyindustries07@gmail.com
(f)STD Code. 79(f)Telephone No. 40083051
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/85152/2018
(d)Master Proposal Number(Single Window) SW/173096/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey No. 111 & 112, Plot No. 7&8, Vill: Dhanot
(b)Pincode 382715
(c)Bounded Latitudes (North)
From
Degree 23.303480
Minutes
Second
From
Degree 23.304019
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.426895
Minutes
Second
From
Degree 72.427431
Minutes
Second
(e)Survey of India Topo Sheet No. F43A07, F43A08, F43A11, F43A12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 71
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 55
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratGandhinagarKalol
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/369/2018-IA-II(I)
(b)Date of Apply of TOR 21 Nov 2018
(c)Date of Issue of TOR / Standard ToR 31 Dec 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :24 Aug 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :25 Sep 2019
Distance of Public Hearing Venue from the Proposed Project :0
At Project Site of M/s. Shrey Industries, Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar
State :Gujarat
District :Gandhinagar
Tehsil :Kalol
Village :Dhanot
37Regarding Employment Opportunities and wastewater managementOthersAdditional District Magistrate, Gandhinagar
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Filter press48”X48”X80 Plates x 4 Nos.PP
(2.)Blender6 KL X 1 no.SS
(3.)Air Clarifying mill200 Kg/Hr. x 1 No.SS
(4.)PP Centrifugal Pump3 nos.
(5.)Hoist2 MT x 2 nos.
(6.)Reaction Vessel20 KL x 2 Nos.SS
(7.)Centrifugal pump5 nos.
(8.)Glass lined Reaction Vessel4 KL x 3 nos.SS
(9.)Reaction Vessel35 KL x 2 Nos.MSRL
(10.)Steam Boiler2 TPH x 1 No.MS
(11.)Cooling Tower200 TR x 1 no.
(12.)Receiver8 KL x 2 nos.SS
(13.)Spin Flash Dryer300 Kg/Hr. x 1 no.SS
(14.)Thermic fluid heater3 Lac K.Cal x 1 No.
(15.)Air Compressor150 CFM x 1 no.
(16.)Storage Tanks10 KL x 4 Nos.HDPE
(17.)RO Plant6 Module x 1 no.
(18.)FRP Tank1 KL x 4 nos.FRP
(19.)DG set125 kVA x 1 no.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Pigment Green 7100OthersMT/MonthRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 3.0
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.565
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.06
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.952
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 5167.2
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 5167.2
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Salt476.4Tons per AnnumIndigenousRoad100 Open MarketCopy of Linkage
(2.)Caustic Flakes72Tons per AnnumIndigenousRoad100 Open MarketCopy of Linkage
(3.)Cupric Chloride96Tons per AnnumIndigenousRoad150 Open MarketCopy of Linkage
(4.)Aluminum chloride2190Tons per AnnumIndigenousRoad250 Open MarketCopy of Linkage
(5.)Emulsifier1524Tons per AnnumIndigenousRoad200 Open MarketCopy of Linkage
(6.)Mono Chloro Benzene (MCB)48Tons per AnnumIndigenousRoad250 Open MarketCopy of Linkage
(7.)CPC Blue666Tons per AnnumIndigenousRoad250 Open MarketCopy of Linkage
(8.)Chlorine94.8Tons per AnnumIndigenousRoad250 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 31 Dec 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube44.7730.4143.4860
(2.)SO2Micro Gram per Meter Cube42.029.4230.5980
(3.)NOxMicro Gram per Meter Cube49.9212.9944.3780
(4.)PM10Micro Gram per Meter Cube88.6672.4086.64100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l402.6262.462501000
(2.)Total Hardnessmg/l298238300600
(3.)TDSmg/l10979695002000
(4.)TSSmg/l0.50.500
(5.)Heavy MetalsIronmg/l0.270.130.31
(6.)pHNA7.97.18.50
(7.)Fluoridemg/l0.870.511.5
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l10.42E
(2.)CODmg/l444E
(3.)pHNA87.8C
(4.)DOmg/l5.23.5D
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))645275
(2.)Leq(Night)A-weighted decibels(dB(A))504270
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milligram per Kilogram114.16
(2.)Electric ConductivityOthersµmho/cm681178
(3.)K(Potassium)Milligram per Kilogram6942
(4.)pH8.37.6
(5.)N(Nitrogen)Milligram per Kilogram313126
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 40
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 20
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTanker Water Supply from GWSSB497 Not Appliacble modeOthersTankerOthersTanker Water Supply from GWSSBNA15 Sep 202050
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic0.81.0Soak PitOthersTo Soak Pit000.8
(2.)Industrial5480ETP, RO and Spray dried at common spray drying facilityOthersspray dried at common spray drying facility3618
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 54.8
(b)Total Discharged Water (Kilolitre per Day) 18.8
(c)Total Reused Water (Kilolitre per Day) 36
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.05Kilolitre30RoadOthersReuse OR sell to registered re-refiners
(2.)Dilute HCl (30%)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)2220Tons100RoadOthersSell to actual users having Rule 9 permission
(3.)Aluminium ChlorideHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5640Tons100RoadOthersSell to actual users having Rule 9 permission
(4.)ETP wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)72Tons80RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)Sodium HypochloriteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3360Tons100RoadOthersSell to actual users having Rule 9 permission
(6.)Discarded Containers/BagsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)18Tons25RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube30.150.10.3230.4880
(2.)SO2Microgram per Meter Cube19.790.20.4220.2280
(3.)PM2.5Microgram per Meter Cube39.240.20.3639.6160
(4.)PM10Microgram per Meter Cube80.600.20.5481.15100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Spin Flash Dryer--200.4OthersSPM0.0005 g/s
(2.)Reaction Vessel--110.3OthersHCl, Cl20.044 g/s, 0.01342 g/s
(3.)D G Set (125 kVA)Diesel110.3OthersSPM, SO2, NOx0.00046 g/s, 0.0000644 g/s, 0.00154 g/s
(4.)Steam Boiler (2 TPH)Coal/Agro Waste300.9OthersSPM, SO2, NOX0.0925 g/s, 0.02315 g/s, 0.01368 g/s
(5.)Thermic Fluid Heater (3 Lakhs kcal/hr.)LDO/Furnace Oil300.9OthersSPM, SO2, NOx0.000925 g/s, 0.0208 g/s, 0.01899 g/s
(6.)Hot Air Generator (2 Lakhs kcal/hr.)Coal/Agro waste200.4OthersSPM, SO2, NOx0.02312 g/s, 0.00578 g/s, 0.0342 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 150
(b)Source UGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1 x 125 kVA
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 00
(b)Private Land (ha.) 0.3366
(c)Government Land (ha.) 00
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 00
    Total Land (ha.) 0.3366
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 22817
(b)Waste/Barren Land (ha.) 941
(c)Grazing/ Community Land (ha.) 1475.56
(d)Surface Water Bodies (ha.) 467
(e)Settlements (ha.) 1595
(f)Industrial (ha.) 1322
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Scrub, Plantation 2409
    Total (ha.) 31026.5600
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.08445
(2.)Green belt0.1121
(3.)Area for Solid Waste Management0.012
(4.)Built Up Area0.0564
(5.)OthersInternal Roads, Parking, Open Area0.07165
Total (ha.) 0.3366
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone within 10 km radius0Project is not located in CPA
(2.)ESZsNone within 10 km radius0No ESZ present in the Study area.
(3.)Wildlife CorridorsNone within 10 km radius0No Wildlife corridors present in Study area.
(4.)CorridorsNone within 10 km radius0No corridors present in Study area.
(5.)WLSNone within 10 km radius0No WLS present in Study area.
(6.)NPANone within 10 km radius0No NPA is present in Study area.
(7.)ESAsNone within 10 km radius0No ESA is present in Study area.
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone within 10 km radius0No Archaeological site is present within study area
(2.)ForestNone within 10 km radius0No Forest land is present within study area.
(3.)Defence InstallationsNone within 10 km radius0No Defence Installations is present within study area.
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.33
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Peacock or Indian Peafowl (Pavo Cristatus)
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 220000/-
(iii)Period of Implementation within 3 yrs.
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Chhatral Pond
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 3.35
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 17
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 0
(e)No. of working days 312
(f)Total Manpower 37
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.11
(b)Percentage of Total Project Area 32.68
(c)No. of Plants to be Planted 250
(d)Funds Allocated for Plantation 75000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialProject will Increase the Revenue for State
(2.)SocialEmployment generation, improvement in infrastructure
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1921/RA 0156
(ii)Name of the EIA Consultant Bhagwati Enviro Care Pvt. Ltd.
(iii)Address Plot No. 28,29,30, Parmeshwar Estate-II, Opp. AMCO Bank, Phase-I, GIDC Estate, Vatva, Ahmedabad.
(iv)Mobile No. 9824051541
(v)Landline No. 0794008305
(vi)Email Id tech5@bhagwatienviro.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 23 May 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSanjaykumar Bhogilal Patel
DesignationPartner
Name of Company (Applicant Name should not be given here)SHREY INDUSTRIES
AddressSurvey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar