1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed project for manufacturing of Synthetic Organic Chemicals - Pigment Green 7 by M/s. Shrey Industries | (b)Name of the Company / Organisation | SHREY INDUSTRIES | (c)Registered Address | Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar,,Gandhinagar,Gujarat-382715 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Sanjaykumar Bhogilal Patel | (b)Designation (Owner/ Partner/ CEO) | Partner | (c)Address | Survey No. 111 and 112, Plot No. 7 and 8, Dhanot, Kalol, Gandhinagar,,Kalol,Gandhinagar,Gujarat-382715 | (d)Pin code | 382715 | (e)E-mail | shreyindustries07@gmail.com | (f)STD Code. | 79(f)Telephone No. | 40083051 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/85152/2018 | (d)Master Proposal Number(Single Window) | SW/173096/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 3 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Survey No. 111 & 112, Plot No. 7&8, Vill: Dhanot | (b)Pincode | 382715 | (c)Bounded Latitudes (North) | | From | | Degree | 23.303480 | Minutes | | Second | | From | | Degree | 23.304019 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72.426895 | Minutes | | Second | | From | | Degree | 72.427431 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43A07, F43A08, F43A11, F43A12 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 71 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 55 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Gandhinagar | Kalol | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/369/2018-IA-II(I) | (b)Date of Apply of TOR | 21 Nov 2018 | (c)Date of Issue of TOR / Standard ToR | 31 Dec 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 25 Sep 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| At Project Site of M/s. Shrey Industries, Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar | State : | Gujarat | District : | Gandhinagar | Tehsil : | Kalol | Village : | Dhanot |
| 37 | Regarding Employment Opportunities and wastewater
management | Others | Additional District Magistrate, Gandhinagar | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Filter press | 48”X48”X80 Plates x 4 Nos. | PP | (2.) | Blender | 6 KL X 1 no. | SS | (3.) | Air Clarifying mill | 200 Kg/Hr. x 1 No. | SS | (4.) | PP Centrifugal Pump | 3 nos. | | (5.) | Hoist | 2 MT x 2 nos. | | (6.) | Reaction Vessel | 20 KL x 2 Nos. | SS | (7.) | Centrifugal pump | 5 nos. | | (8.) | Glass lined Reaction Vessel | 4 KL x 3 nos. | SS | (9.) | Reaction Vessel | 35 KL x 2 Nos. | MSRL | (10.) | Steam Boiler | 2 TPH x 1 No. | MS | (11.) | Cooling Tower | 200 TR x 1 no. | | (12.) | Receiver | 8 KL x 2 nos. | SS | (13.) | Spin Flash Dryer | 300 Kg/Hr. x 1 no. | SS | (14.) | Thermic fluid heater | 3 Lac K.Cal x 1 No. | | (15.) | Air Compressor | 150 CFM x 1 no. | | (16.) | Storage Tanks | 10 KL x 4 Nos. | HDPE | (17.) | RO Plant | 6 Module x 1 no. | | (18.) | FRP Tank | 1 KL x 4 nos. | FRP | (19.) | DG set | 125 kVA x 1 no. | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Pigment Green 7 | 100 | Others | MT/Month | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 3.0 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.565 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.06 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.952 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 5167.2 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 5167.2 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Salt | 476.4 | Tons per Annum | | Indigenous | Road | | 100 | Open Market | | Copy of Linkage | (2.) | Caustic Flakes | 72 | Tons per Annum | | Indigenous | Road | | 100 | Open Market | | Copy of Linkage | (3.) | Cupric Chloride | 96 | Tons per Annum | | Indigenous | Road | | 150 | Open Market | | Copy of Linkage | (4.) | Aluminum chloride | 2190 | Tons per Annum | | Indigenous | Road | | 250 | Open Market | | Copy of Linkage | (5.) | Emulsifier | 1524 | Tons per Annum | | Indigenous | Road | | 200 | Open Market | | Copy of Linkage | (6.) | Mono Chloro Benzene (MCB) | 48 | Tons per Annum | | Indigenous | Road | | 250 | Open Market | | Copy of Linkage | (7.) | CPC Blue | 666 | Tons per Annum | | Indigenous | Road | | 250 | Open Market | | Copy of Linkage | (8.) | Chlorine | 94.8 | Tons per Annum | | Indigenous | Road | | 250 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2018 To 31 Dec 2018 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 44.77 | 30.41 | 43.48 | 60 | (2.) | SO2 | | Micro Gram per Meter Cube | 42.02 | 9.42 | 30.59 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 49.92 | 12.99 | 44.37 | 80 | (4.) | PM10 | | Micro Gram per Meter Cube | 88.66 | 72.40 | 86.64 | 100 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Chlorides | | | mg/l | | 402.6 | 262.46 | 250 | 1000 | (2.) | Total Hardness | | | mg/l | | 298 | 238 | 300 | 600 | (3.) | TDS | | | mg/l | | 1097 | 969 | 500 | 2000 | (4.) | TSS | | | mg/l | | 0.5 | 0.5 | 0 | 0 | (5.) | Heavy Metals | | Iron | mg/l | | 0.27 | 0.13 | 0.3 | 1 | (6.) | pH | | | NA | | 7.9 | 7.1 | 8.5 | 0 | (7.) | Fluoride | | | mg/l | | 0.87 | 0.5 | 1 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 10.4 | 2 | E | (2.) | COD | | mg/l | | 44 | 4 | E | (3.) | pH | | NA | | 8 | 7.8 | C | (4.) | DO | | mg/l | | 5.2 | 3.5 | D | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 64 | 52 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 50 | 42 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Milligram per Kilogram | | 11 | 4.16 | (2.) | Electric Conductivity | Others | µmho/cm | 681 | 178 | (3.) | K(Potassium) | Milligram per Kilogram | | 69 | 42 | (4.) | pH | | | 8.3 | 7.6 | (5.) | N(Nitrogen) | Milligram per Kilogram | | 313 | 126 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 40 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 20 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Tanker Water Supply from GWSSB | 49 | 7 | Not Appliacble | modeOthers | Tanker | Others | Tanker Water Supply from GWSSB | NA | 15 Sep 2020 | 50 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 0.8 | 1.0 | Soak Pit | Others | To Soak Pit | 00 | 0.8 | (2.) | Industrial | 54 | 80 | ETP, RO and Spray dried at common spray drying facility | Others | spray dried at common spray drying facility | 36 | 18 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 54.8 | (b)Total Discharged Water (Kilolitre per Day) | 18.8 | (c)Total Reused Water (Kilolitre per Day) | 36 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.05 | Kilolitre | 30 | Road | | Others | Reuse OR sell to registered re-refiners | (2.) | Dilute HCl (30%) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2220 | Tons | 100 | Road | | Others | Sell to actual users having Rule 9 permission | (3.) | Aluminium Chloride | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 5640 | Tons | 100 | Road | | Others | Sell to actual users having Rule 9 permission | (4.) | ETP waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 72 | Tons | 80 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (5.) | Sodium Hypochlorite | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 3360 | Tons | 100 | Road | | Others | Sell to actual users having Rule 9 permission | (6.) | Discarded Containers/Bags | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 18 | Tons | 25 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 30.15 | 0.1 | 0.32 | 30.48 | 80 | (2.) | SO2 | | Microgram per Meter Cube | 19.79 | 0.2 | 0.42 | 20.22 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 39.24 | 0.2 | 0.36 | 39.61 | 60 | (4.) | PM10 | | Microgram per Meter Cube | 80.60 | 0.2 | 0.54 | 81.15 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Spin Flash Dryer | -- | 20 | 0.4 | Others | SPM | 0.0005 g/s | (2.) | Reaction Vessel | -- | 11 | 0.3 | Others | HCl, Cl2 | 0.044 g/s, 0.01342 g/s | (3.) | D G Set (125 kVA) | Diesel | 11 | 0.3 | Others | SPM, SO2, NOx | 0.00046 g/s, 0.0000644 g/s, 0.00154 g/s | (4.) | Steam Boiler (2 TPH) | Coal/Agro Waste | 30 | 0.9 | Others | SPM, SO2, NOX | 0.0925 g/s, 0.02315 g/s, 0.01368 g/s | (5.) | Thermic Fluid Heater (3 Lakhs kcal/hr.) | LDO/Furnace Oil | 30 | 0.9 | Others | SPM, SO2, NOx | 0.000925 g/s, 0.0208 g/s, 0.01899 g/s | (6.) | Hot Air Generator (2 Lakhs kcal/hr.) | Coal/Agro waste | 20 | 0.4 | Others | SPM, SO2, NOx | 0.02312 g/s, 0.00578 g/s, 0.0342 g/s | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 150 | (b)Source | UGVCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 1 x 125 kVA | (e)Stack Height (in m) | 11 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 00 | (b)Private Land (ha.) | 0.3366 | (c)Government Land (ha.) | 00 | (d)Revenue Land (ha.) | 00 | (e)Other Land (ha.) | 00 | Total Land (ha.) | 0.3366 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 22817 | (b)Waste/Barren Land (ha.) | 941 | (c)Grazing/ Community Land (ha.) | 1475.56 | (d)Surface Water Bodies (ha.) | 467 | (e)Settlements (ha.) | 1595 | (f)Industrial (ha.) | 1322 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Scrub, Plantation | 2409 | Total (ha.) | 31026.5600 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0.08445 | | (2.) | Green belt | | 0.1121 | | (3.) | Area for Solid Waste Management | | 0.012 | | (4.) | Built Up Area | | 0.0564 | | (5.) | Others | Internal Roads, Parking, Open Area | 0.07165 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | None within 10 km radius | 0 | Project is not located in CPA | (2.) | ESZs | None within 10 km radius | 0 | No ESZ present in the Study area. | (3.) | Wildlife Corridors | None within 10 km radius | 0 | No Wildlife corridors present in Study area. | (4.) | Corridors | None within 10 km radius | 0 | No corridors present in Study area. | (5.) | WLS | None within 10 km radius | 0 | No WLS present in Study area. | (6.) | NPA | None within 10 km radius | 0 | No NPA is present in Study area. | (7.) | ESAs | None within 10 km radius | 0 | No ESA is present in Study area. | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | None within 10 km radius | 0 | No Archaeological site is present within study area | (2.) | Forest | | None within 10 km radius | 0 | No Forest land is present within study area. | (3.) | Defence Installations | | None within 10 km radius | 0 | No Defence Installations is present within study area. | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.33 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | | (b)No. of Households | | (c)No. of PDFs (Project Displaced Families) | | (d)No. of PAFs (Project Affected Families) | | (e)Funds Allocated for R&R(in INR) (in Lacs) | | (f)Status of R&R | NA | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Peacock or Indian Peafowl (Pavo Cristatus) | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 220000/- | (iii)Period of Implementation | within 3 yrs. | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Chhatral Pond | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 3.35 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 17 | (c)Temporary Employment- During Construction | 20 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 312 | (f)Total Manpower | 37 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.11 | (b)Percentage of Total Project Area | 32.68 | (c)No. of Plants to be Planted | 250 | (d)Funds Allocated for Plantation | 75000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | Project will Increase the Revenue for State | (2.) | Social | Employment generation, improvement in infrastructure | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Industrial Projects - 3 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1921/RA 0156 | (ii)Name of the EIA Consultant | Bhagwati Enviro Care Pvt. Ltd. | (iii)Address | Plot No. 28,29,30, Parmeshwar Estate-II, Opp. AMCO Bank, Phase-I, GIDC Estate, Vatva, Ahmedabad. | (iv)Mobile No. | 9824051541 | (v)Landline No. | 0794008305 | (vi)Email Id | tech5@bhagwatienviro.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 3 | (ix)Validity of Accreditation | 23 May 2021 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Sanjaykumar Bhogilal Patel | Designation | Partner | Name of Company (Applicant Name should not be given here) | SHREY INDUSTRIES | Address | Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar |
|