1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion / Modernization of existing facilities of Godawari Power and Ispat Ltd.& subsequent Merger of various ECs | (b)Name of the Company / Organisation | Godawari Power and Ispat Ltd | (c)Registered Address | Plot No. 428/2, Phase-I, Industrial Area, Siltara, Raipur - 493111 (Chhattisgarh) ,Plot No. 428/2, Phase-I, Industrial Area, Siltara, Raipur - 493111 (Chhattisgarh) ,Raipur,Chhattisgarh-492001 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Sanjay Srivastava | (b)Designation (Owner/ Partner/ CEO) | Associate Vice President | (c)Address | Plot No. 428/2, Phase-I, Industrial Area, Siltara, Raipur - 493111 (Chhattisgarh),,,Raipur,Chhattisgarh-493111 | (d)Pin code | 493111 | (e)E-mail | tonmoy.bose@hiragroup.com | (f)STD Code. | 771(f)Telephone No. | 4082333 | (g)Fax No. | 4082234 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/CG/IND/23490/2014 | (d)Master Proposal Number(Single Window) | SW/172771/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot No. 428/2, Phase-I | (b)Pincode | 493211 | (c)Bounded Latitudes (North) | | From | | Degree | 212224.9 | Minutes | | Second | | From | | Degree | 212238.7 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 814030.8 | Minutes | | Second | | From | | Degree | 814113.0 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 64/G11, 64 G/15 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 282 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 4.5 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Chhattisgarh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Chhattisgarh | Raipur | Raipur | | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/216/2014-IA-II(I) | (c)Date of Issue of TOR | 05 Nov 2014 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 30 Oct 2015 | (c)Date of Issue of EC | 07 Apr 2016 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 17 Feb 2020 | Distance of Public Hearing Venue from the Proposed Project : | 0.5 |
| Tanda Ground (Adjacent to Project Site), Siltara Industrial Area Phase – I, Raipur (C.G.) | State : | Chhattisgarh | District : | Raipur | Tehsil : | Raipur | Village : | Tanda |
| 400 | Employment, Development of Roads, Development of Education for Youth, Health Facilities, Pollution Control Devices | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Nagpur | (iii)Letter No. | EC-999/RON/209-NGP/7176 | (iv)Status of Compliance | Partially Complied | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Sep 8 2020 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Iron Ore Benificiation Plant | 1000000 | 2284000 | 3284000 | Tons per Annum(TPA) | | Road | | (2.) | Iron Ore Pelletization and coal gasification plant | 2100000 | 300000 | 2400000 | Tons per Annum(TPA) | | Road,Rail | | (3.) | Steel Billets (SMS) | 400000 | 300000 | 700000 | Tons per Annum(TPA) | | Road | | (4.) | Power Plant | 73 | 0 | 73 | Mega Watt(MW) | | Others | Transmission Line | (5.) | HB Wire | 00 | 100000 | 100000 | Tons per Annum(TPA) | | Road | | (6.) | Replacement of Arc Furnace to Induction Furnace | 00 | 5000 | 5000 | Tons per Annum(TPA) | | Road | | (7.) | Slag Crushing Plant | 00 | 175000 | 175000 | Tons per Annum(TPA) | | Road | | (8.) | Mineral Grinding Plant | 00 | 200000 | 200000 | Tons per Annum(TPA) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Power Generation (AFBC/WHRB & Biomass Power Plant) | 73MW (28 MW+ 25 MW + 20 MW) | Modernization by Installation of efficient TG set | 73 MW (48 MW + 25 MW) | Replacement of three existing turbine with one new energy efficient Turbine of 48 MW | (2.) | Oxygen Plant | 1200000 Nm3 | No change | 1200000 Nm3 | Operational | (3.) | Nitrogen Plant | 4500000 Nm3 | No change | 4500000 Nm3 | Operational | (4.) | Fly Ash Brick Plant | 16500000 Nos. | No change | 16500000 Nos. | Operation Discontinued | (5.) | Steel Billet | 400000 TPA | Modernization and capacity enhancement | 700000 TPA (7Tx10, 12T x6, 15Tx6 & 30 Tx4) | SMS is in operation to manufacture 400000 TPA Billets. | (6.) | Ferro Alloys or Pig Iron | 16500 TPA or 33000 TPA | No change | 16500 TPA or 33000 TPA | Operational | (7.) | H. B. Wire | 100000 TPA | 100000 TPA | 200000 TPA | Operational | (8.) | Oxygen Plant | 1200000 Nm3 | No change | 1200000 Nm3 | Operational | (9.) | Iron Ore Beneficiation plant | 1000000 TPA | Capacity enhancement | 3284000 TPA | 1.0 MTPA Iron Ore Beneficiation Operational | (10.) | Rolling Mill | 400000 TPA | No change | 400000 TPA | Operational | (11.) | Arc Furnace | 5000 TPA | Proposed (To be revised to Induction Furnace) | 5000 TPA | New Unit | (12.) | Slag Crushing Plant | - | Proposed | 175000 TPA | New Unit | (13.) | Mineral Grinding Plant | - | Proposed | 200000 TPA | New Unit | (14.) | Iron Ore Pelletization Plants | 2100000 TPA | Proposed enhancement in production capacity | 2400000 TPA | 2.1MTPA Iron Ore Pelletization Plant with 60000Nm3/hr Coal gasifier plant. | (15.) | Sponge Iron | 650000 TPA | No change | 650000 TPA (1 x 350 TPD & 3 x 500 TPD Kilns) | Plant is in operation for 495000 TPA, Applied for amendment in consent for 650000 TPA to CECB,Raipur | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 16 Jan 2020 | (iv)Valid Upto | 31 Oct 2020 | (v)File No. | 9249/TS/CECB/2020 | (vi)Application No. | 3339842 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 1988.87 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 3.4 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 4.0 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.63 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 3200000 | (b)Existing quantity of raw material/fuel | 1000000 | (c)Total quantity of raw material/fuel | 4200000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Silico Manganese | 10480 | Tons per Annum | | Own Source/ open market | Road | | 50 | Open Market | | Copy of Linkage | (2.) | Ferro Manganese | 16.5 | Tons per Annum | | Purchase from Open market | Road | | 300 | Open Market | | Copy of Linkage | (3.) | Inoculants | 3.3 | Tons per Annum | | Purchase from Open market | Road | | 300 | Open Market | | Copy of Linkage | (4.) | Iron Ore Fines and Mill scale | 2496000 | Tons per Annum | | Own source or out source | Road | | 160 | Others | Captive mines | Copy of Linkage | (5.) | Coal Dust | 15 | Tons per Annum | | Own Source/open market | Road | | 50 | Others | Own Source/ Open Market | Copy of Linkage | (6.) | Iron Ore Fines (DRY including Return Fines) and Mill scale | 2288000 | Tons per Annum | | Own source/Out Source | Road | | 160 | Others | Captive Mines/Open market | Copy of Linkage | (7.) | Sponge Iron | 760960 | Tons per Annum | | Own source / Purchase from Open market | Road | | 50 | Others | Inhouse & Open Market | Copy of Linkage | (8.) | Coal for Sponge Iron | 650000 | Tons per Annum | | Purchase from Open market | Road,Rail | | 200 | Others | Linkage/ e-auction & open market | Copy of Linkage | (9.) | Dolomite for Ferro Alloys/Pig Iron | 495 | Tons per Annum | | Purchase from Open market | Road | | 100 | Open Market | | Copy of Linkage | (10.) | Electrode Paste | 495 | Tons per Annum | | Purchase from Open market | Road | | 300 | Open Market | | Copy of Linkage | (11.) | Lime & Gypsum | 15000 | Tons per Annum | | Purchase from Open market | Road | | 100 | Open Market | | Copy of Linkage | (12.) | Steel Billets | 425500 | Tons per Annum | | -- | Others | -- | 0 | Others | -- | Copy of Linkage | (13.) | Scrap | 92030 | Tons per Annum | | Purchase from Open market/imported scrap | Road,Rail | | 500 | Open Market | | Copy of Linkage | (14.) | Coal | 113225 | Tons per Annum | | Coal india and its subsidiaries/open market | Road,Rail | | 200 | Linkage | | Copy of Linkage | (15.) | Rice Husk | 167111 | Tons per Annum | | Purchase from Open market | Road | | 100 | Open Market | | Copy of Linkage | (16.) | Quartz | 1320 | Tons per Annum | | Purchase from Open market | Road | | 500 | Open Market | | Copy of Linkage | (17.) | Crushed Iron Ore | 3284000 | Tons per Annum | | Captive Mines & Open Market | Road | | 160 | Captive | | Copy of Linkage | (18.) | High Mn Slag | 6600 | Tons per Annum | | Purchase from Open market | Road | | 100 | Open Market | | Copy of Linkage | (19.) | Bentonite | 2.5 | Tons per Annum | | Purchase from Open market | Road | | 1000 | Open Market | | Copy of Linkage | (20.) | Lime Stone / Dolomite | 35200 | Tons per Annum | | Purchase from Open market | Road | | 100 | Open Market | | Copy of Linkage | (21.) | Fly ash | 70000 | Tons per Annum | | Own Source | Road,Others | -- | 0 | Captive | | Copy of Linkage | (22.) | Dolomite | 19500 | Tons per Annum | | Purchase from Open Market | Road | | 100 | Open Market | | Copy of Linkage | (23.) | Coke/Steam coal | 9900 | Tons per Annum | | Purchase from Open market | Road | | 500 | Open Market | | Copy of Linkage | (24.) | PELLET | 942500 | Tons per Annum | | Own Source | Others | -- | 0 | Captive | | Copy of Linkage | (25.) | Lime | 5954 | Tons per Annum | | Purchase from Open market | Road | | 100 | Open Market | | Copy of Linkage | (26.) | Calcined Lime | 5954 | Tons per Annum | | Open Market | Road | | 100 | Open Market | | Copy of Linkage | (27.) | Manganese ore | 34650 | Tons per Annum | | Purchase from MOIL / open market and imported | Road,Rail | | 350 | Open Market | | Copy of Linkage | (28.) | MS Item | 165 | Tons per Annum | | Purchase from Open market | Road | | 500 | Open Market | | Copy of Linkage | (29.) | Sand | 8000 | Tons per Annum | | Purchase from Open market | Road | | 100 | Open Market | | Copy of Linkage | (30.) | Bentonite/ Binder | 24000 | Tons per Annum | | Purchase from Open market | Road | | 1000 | Open Market | | Copy of Linkage | (31.) | Dolochar | 2678 | Tons per Annum | | Own Source | Others | -- | 0 | Captive | | Copy of Linkage | (32.) | LDO | 2300 | Others | Killo Liters | Purchase from Open market | Road | | 50 | Open Market | | Copy of Linkage | (33.) | Coal for gasification system | 286364 | Tons per Annum | | Coal india and its subsidiaries/open market | Road,Rail | | 160 | Open Market | | Copy of Linkage | (34.) | Lancing Pipe | 50 | Tons per Annum | | Purchase from Open market | Road | | 100 | Open Market | | Copy of Linkage | (35.) | Steel Scrap & Borings | 2511 | Tons per Annum | | Purchase from Open market | Road | | 500 | Open Market | | Copy of Linkage | (36.) | Bentonite/ Binder | 22000 | Tons per Annum | | Purchase from Open market Bhuj -Gujarat | Road | | 1500 | Open Market | Captive Mines/Open Market | Copy of Linkage | (37.) | Silica Sand | 250 | Tons per Annum | | Purchase from Open market | Road | | 700 | Open Market | | Copy of Linkage | (38.) | Limestone/Dolomite | 38400 | Tons per Annum | | Purchase from Open market | Road | | 100 | Open Market | | Copy of Linkage | (39.) | Atmospheric Air | 416670 | Others | -- | NA | Others | -- | 0 | Others | -- | Copy of Linkage | (40.) | Pig Iron & Silicon | 277 | Tons per Annum | | Purchase from Open market | Road | | 300 | Open Market | | Copy of Linkage | (41.) | M.S. Wire Rods | 20300 | Tons per Annum | | Own Source/ Associate units | Road,Others | -- | 0 | Captive | -- | Copy of Linkage | (42.) | Granulated Ferro Alloys Slag | 7000 | Tons per Annum | | Own Source | Others | -- | 0 | Captive | | Copy of Linkage | (43.) | Ferro Silicon Magnesium | 10.5 | Tons per Annum | | Own Source | Others | -- | 0 | Captive | | Copy of Linkage | (44.) | LDO | 2300 | Others | Killo Liters | Purchase from Petroleum companies/open market | Road | | 50 | Open Market | | Copy of Linkage | (45.) | Following Engineering Items, Steel (Plates, Pipe, Structures etc), Bearing, Gear Box, Motor, Tools and Tackles etc | 2550 | Tons per Annum | | Purchase from Open market | Road | | 100 | Open Market | | Copy of Linkage | (46.) | Magnetite Ore | 200000 | Tons per Annum | | Own Source | Road | | 160 | Others | Captive mines | Copy of Linkage | (47.) | Mineral Ore | 200000 | Tons per Annum | | Own source / Purchase from Open market | Road,Rail | | 160 | Others | Captive mines/Open market | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 15 Mar 2019 To 15 Jun 2019 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 82.6 | 43.4 | 80.7 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 40.2 | 15.3 | 37.3 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 45.4 | 16.8 | 44.6 | 80 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 45.6 | 23.4 | 45.0 | 60 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | 474 | 290 | 300 | 600 | (2.) | TDS | | | mg/l | | 698 | 406 | 500 | 2000 | (3.) | pH | | | NA | | 7.8 | 7.1 | 6.5 | 8.5 | (4.) | Fluoride | | | mg/l | | 0.6 | 0.3 | 1 | 1.5 | (5.) | TSS | | | mg/l | | 5 | 0 | 5 | 5 | (6.) | Chlorides | | | mg/l | | 189.5 | 40.3 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | COD | | mg/l | | 22.4 | 0 | B | (2.) | BOD | | mg/l | | 3.6 | 0 | B | (3.) | DO | | mg/l | | 6.8 | 4.9 | B | (4.) | pH | | NA | | 7.8 | 7.4 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 62.7 | 41.0 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 50.4 | 39.7 | 45 | |
14.5. No. of Soil Sample Monitored locations : 3 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Kilogram per hectare | | 188.1 | 45.7 | (2.) | pH | | | 7.2 | 6.8 | (3.) | Electric Conductivity | Others | mmhos/cm | 0.35 | 0.25 | (4.) | N(Nitrogen) | Kilogram per hectare | | 284 | 103.8 | (5.) | P(Phosphorus) | Kilogram per hectare | | 27.3 | 7.1 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10.5 To 5.2 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3.8 To 7.2 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 18000 | 7 | Copy of Permission Letter | Pipeline | | Others | Pumping | L 385536 | 16 Aug 2019 | 18000 | (2.) | GroundWater | | 170 | 0 | Copy of Permission Letter | Pipeline | | Others | Borewell | CGWA/NOC/IND/ORIG/2019/4875 | 26 Feb 2019 | 479 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 136 | 136 | STP | Green Belt Renewal Plant | | 136 | | (2.) | Industrial | 1035 | 1035 | ETP | Reuse within the Plant & Recycling | | 1035 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1171 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 1171 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Mill Scale (E +P) | Industrial Waste | | 14000 | Tons | 0 | Conveyor Belt | | Others | In house utilization | (2.) | Fly Ash (E+P) | Industrial Waste | | 85071 | Tons | 80 | Road | | Others | MoU with Cement Industry | (3.) | Slag(E+P) | Industrial Waste | | 175000 | Tons | 100 | Road | | Others | In house utilization & MoU with Cment Industry | (4.) | Ash (Slinder) (E+P) | Industrial Waste | | 88200 | Tons | 80 | Road | | Others | Utilization for brick manufacturing & Land filling | (5.) | Tar (E+P) | Industrial Waste | | 17250 | Kilolitre | 100 | Road | | Others | In House & Sold authorised parties | (6.) | Dust Collected through Sweeping Machine | Industrial Waste | | 182.5 | Tons | 0 | Others | In house | Others | In house in pellet Plant | (7.) | Waste Refractories (E+P) | Industrial Waste | | 400 | Tons | 100 | Road | | Others | In house and sold to other parties | (8.) | STP Sludge | Industrial Waste | | 3.5 | Tons | 0 | Others | In House | Others | Used as Soil conditioner on site Plantation | (9.) | Electrical (E+P) | Industrial Waste | | 0.25 | Tons | 50 | Road | | Others | Sold to scrap vendors | (10.) | Wood Scrap (E+P) | Industrial Waste | | 1 | Tons | 0 | Others | In House | Others | reuse in usable wooden items. | (11.) | Misc waste metal (E) | Industrial Waste | | 4000 | Tons | 0 | Others | In House | Others | Use in SMS | (12.) | Biodegradable Waste (E+P) | Municipal Solid Waste | | 7.0 | Tons | 0 | Others | In House | Others | Composting | (13.) | tailings (E+P) | Industrial Waste | | 644000 | Tons | 100 | Road | | Others | MoU with UltraTech Cement Ltd. | (14.) | Char & Dolochar (E) | Industrial Waste | | 130000 | Tons | 7 | Road | | Others | Use in captive power Plant | (15.) | Dust from S C & ESP Dust (E) | Industrial Waste | | 91000 | Tons | 50 | Road | | Others | Brick, Road Making, land filling | (16.) | Process ETP Sludge | Industrial Waste | | 151 | Tons | 100 | Road | | Others | Disposal Through CTSDF | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 40.2 | 0.3 | 0.10 | 40.31 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 82.6 | 0.3 | 0.10 | 82.70 | 100 | (3.) | NOx | | Microgram per Meter Cube | 45.4 | 1.0 | 0.03 | 45.44 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 45.6 | 0 | 0 | 45.61 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Pellet Plant (0.6 MTPA) | Coal | 60 | 3.1 | PM10 | | 4.86 | (2.) | SMS | Electricity | 30 | 2 | PM10 | | 0.78 | (3.) | Pellet Plant Unit (1.5 MTPA) | Coal | 100 | 6.1 | PM10 | | 10.56 | (4.) | Induction Furnace (5000 TPA) Proposed | Electricity | 30 | 2 | PM10 | | 0.01 | (5.) | SMS Proposed | Electricity | 30 | 2 | PM10 | | 0.6 | (6.) | Kiln 1 (WHRB 01+ AFBC 70 TPH) | Coal & Waste Gases | 74 | 2.2 | PM10 | | 1.89 | (7.) | Ferro Alloy Furnace | Coal | 35 | 2 | PM10 | | 1.36 | (8.) | kiln 2 (WHRB 02 + AFBC 100 TPH) | Coal & Waste Gases | 74 | 4.2 | PM10 | | 3.49 | (9.) | Kiln 3( WHRB 03 + WHRB 04) | Waste gases | 74 | 4.2 | PM10 | | 3.52 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 142000 | (b)Source | 73 MW Captive Generation 25 MW from associate conc | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | Nil | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 79.351 | (c)Government Land (ha.) | 14.474 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 93.825 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 24697.18 | (b)Waste/Barren Land (ha.) | 4143.10 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 2012.08 | (e)Settlements (ha.) | 6835.49 | (f)Industrial (ha.) | 3431.27 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : nil | 0 | Total (ha.) | 41119.1200 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 18.574 | | (2.) | Others | Roads & Open Area | 44.288 | | (3.) | Green belt | | 30.963 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESZs | None | 0 | Nil | (2.) | Corridors | None | 0 | Nil | (3.) | NPA | None | 0 | Nil | (4.) | Critically Polluted Area | Siltara Industrial Area | 0 | Project site is in Critically Polluted area | (5.) | WLS | None | 0 | Nil | (6.) | ESAs | None | 0 | Nil | (7.) | Wildlife Corridors | None | 0 | Nil | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | None | 0 | Nil | (2.) | Forest | | None | 0 | NA | (3.) | Defence Installations | | None | 0 | Nil | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 93.82 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | | (b)No. of Households | | (c)No. of PDFs (Project Displaced Families) | | (d)No. of PAFs (Project Affected Families) | | (e)Funds Allocated for R&R(in INR) (in Lacs) | | (f)Status of R&R | NA | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kharoon River | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 4.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 1940 | (c)Temporary Employment- During Construction | 50 | (d)Temporary Employment- During Operation | 1595 | (e)No. of working days | 330 | (f)Total Manpower | 3585 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 29.70 | 1.26 | 30.96 | (2.) | Percentage of Total Project Area | 31.65 | 1.35 | 33 | (3.) | No. of Plants | 73439 | 7500 | 80939 | (4.) | Funds Allocated | 65000000 | 2000000 | 67000000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | Revenue generation in the form of GST,IT and other taxes for State and Central Government. | (2.) | Social | Various developmental activities under CER & CSR to uplift the life of local villagers. | (3.) | Environmental | • Green Belt development inside and Outside plant • Rain Water Harvesting | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/RA0101 | (ii)Name of the EIA Consultant | Pollution & Ecology Control Services | (iii)Address | Near Dhantoli Police Station, Dhantoli, Nagpur | (iv)Mobile No. | 7720076427 | (v)Landline No. | 0712229322 | (vi)Email Id | pecs_nagpur@rediffmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 15 Nov 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Duplicate proposal. Hence, it is returned. | 18 Sep 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Sanjay Srivastava | Designation | Associate Vice President | Name of Company (Applicant Name should not be given here) | Godawari Power and Ispat Ltd | Address | Plot No. 428/2, Phase-I, Industrial Area, Siltara, Raipur - 493111 (Chhattisgarh) |
|