|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Enhancement of Production Capacity of Existing Pellet Plant From 0.6 MTPA To 0.8 MTPA along with Upgradation of Existing 0.7 MTPA Iron Ore Grinding Unit to 1.0 MTPA Iron Ore Grinding & Beneficiation plant , proposed 1.2 MTPA Iron Ore Pellet Plant along with 20 nos Coal Gasifiers, 2.0 MTPA Iron Ore Grinding & Beneficiation Plant and 0.4 MTPA Ductile Pipe with Induction Furnace by Sarda Energy & Minerals Limited | (b)Name of the Company / Organisation | SARDA ENERGY AND MINERALS LIMITED | (c)Registered Address | Vanijya Bhawan, Jail Road,,Devendra Nagar Square, Raipur,Raipur,Chhattisgarh-492001 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | P S Dutta Gupta | (b)Designation (Owner/ Partner/ CEO) | Head - Corporate Affairs | (c)Address | M/s Sarda Energy & Minerals Limited 1st Floor, Vanijya Bhawan,,Jail Road, Devendra Nagar Square, Raipur (C.G.).,Raipur,Raipur,Chhattisgarh-492001 | (d)Pin code | 492001 | (e)E-mail | pduttagupta@seml.co.in | (f)STD Code. | 771(f)Telephone No. | 2214210 | (g)Fax No. | 2214213 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/CG/IND/25977/2014 | (d)Master Proposal Number(Single Window) | SW/172310/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | P. H No. - 97 Khasra No. - 665/1, 665/26, 665/28, | (b)Pincode | 493111 | (c)Bounded Latitudes (North) | | From | | Degree | 21.33298611 | Minutes | | Second | | From | | Degree | 21.36105556 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 81.6827778 | Minutes | | Second | | From | | Degree | 81.69555556 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 64 G/11, 64 G/15 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 282 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 8.0 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Chhattisgarh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Chhattisgarh | Raipur | Raipur | | (2.) | Chhattisgarh | Raipur | Raipur | | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/45/2012-IA.II(I) | (c)Date of Issue of TOR | 07 Jul 2015 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 04 Jun 2016 | (c)Date of Issue of EC | 28 Oct 2016 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 10 Jan 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0.5 |
| Public hall, Kundrapar | State : | Chhattisgarh | District : | Raipur | Tehsil : | Raipur | Village : | Mandhar |
| 200 | Mostly questions are related to Employment, to ensure PP to give preference to local people. | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Nagpur | (iii)Letter No. | EC-295/RON/2017-NGP/3778 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jun 28 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Iron ore Grinding & Beneficiation Plant | 700000 | 1000000 | 1700000 | Tons per Annum(TPA) | | Road,Conveyor Belt | | (2.) | Ductile Pipe with Induction Furnace | 0 | 400000 | 400000 | Tons per Annum(TPA) | | Road,Rail | | (3.) | Iron Ore Pellet Plant | 600000 | 200000 | 800000 | Tons per Annum(TPA) | | Road,Rail,Conveyor Belt | | (4.) | Coal Gasifier | 27046 | 54092 | 81138 | Others | Nm3/Hr | Others | Pipeline | (5.) | Iorn Ore Pellet Plant | 0 | 1200000 | 1200000 | Tons per Annum(TPA) | | Road,Rail,Conveyor Belt | | (6.) | Iron ore Grinding & Bebeficiation Plant | 0 | 2000000 | 2000000 | Tons per Annum(TPA) | | Road,Conveyor Belt | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Iron Ore Grinding & Beneficiation Plant | -- | 20,00,000 TPA | 20,00,000 TPA | -- | (2.) | Iron Ore Pellet Plant with Coal Gasifiers Plant | 6,00,000 TPA | 2,00,000 TPA | 8,00,000 TPA | The Enhancement will be achieved without changing any Plant and Machinery. | (3.) | Coal Gasifiers Plant (20 Nos) | -- | 54092 Nm3/Hr | 54092 Nm3/Hr | -- | (4.) | Ductile pipe with Induction furnace | -- | 4,00,000 TPA | 4,00,000 TPA | -- | (5.) | Iron Ore Grinding & Beneficiation Plant | 7,00,000 TPA | 3,00,000 TPA | 10,00,000 TPA | Existing Iron Ore Grinding Unit being upgraded to Iron Ore Grinding & Beneficiation Plant | (6.) | Iron Ore Pellet Plant | -- | 12,00,000 TPA | 12,00,000 TPA | -- | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 27 Dec 2019 | (iv)Valid Upto | 30 Sep 2022 | (v)File No. | 8338 /TS/CECB/2019 | (vi)Application No. | 3944355 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 818.66 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 29.64 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 9.15 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 5.4988 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 4220365 | (b)Existing quantity of raw material/fuel | 1000000 | (c)Total quantity of raw material/fuel | 5220365 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Cement | 35666 | Tons per Annum | | Local Market | Road | | 12 | Open Market | | Copy of Linkage | (2.) | Pig Iron | 324087 | Tons per Annum | | Local Market / SAIL | Road | | 55 | Open Market | | Copy of Linkage | (3.) | Scrap Steel | 40755 | Tons per Annum | | Local Market | Road | | 12 | Open Market | | Copy of Linkage | (4.) | Cement sand | 10165 | Tons per Annum | | Local Market | Road | | 12 | Open Market | | Copy of Linkage | (5.) | Core sand | 17120 | Tons per Annum | | Local Market | Road | | 12 | Open Market | | Copy of Linkage | (6.) | Coal | 307500 | Tons per Annum | | SECLs Dipika Gewra Mines | Road,Rail | | 302 | e-auction | | Copy of Linkage | (7.) | Bentonite/Limestone | 30000 | Tons per Annum | | M.P. & Rajasthan | Road | | 100 | Open Market | | Copy of Linkage | (8.) | Iron Ore fines | 3000000 | Tons per Annum | | Iron Ore Mines/Private miners at Odisha | Road,Rail | | 105 | Captive | | Copy of Linkage | (9.) | Iron Ore Concentrate | 420000 | Tons per Annum | | Local Market | Road | | 12 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Feb 2018 To 01 May 2018 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 08 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 46.7 | 24.8 | 44.3 | 60 | (2.) | NOx | | Micro Gram per Meter Cube | 44.7 | 19.2 | 42.7 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 90.8 | 41.6 | 90.3 | 100 | (4.) | SO2 | | Micro Gram per Meter Cube | 38.1 | 11.3 | 34.1 | 80 | |
14.2. No. of Ground Water monitoring locations : 08 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 5 | 5 | 0 | 0 | (2.) | Fluoride | | | mg/l | | 0.7 | 0.3 | 00 | 1.0 | (3.) | TDS | | | mg/l | | 752 | 428 | 0 | 500 | (4.) | Total Hardness | | | mg/l | | 420 | 219 | 0 | 200 | (5.) | Chlorides | | | mg/l | | 187.8 | 42.5 | 00 | 250 | (6.) | pH | | | NA | | 7.7 | 7.1 | 6.5 | 8.5 | |
14.3. No. of Surface Water monitoring locations : 06 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.9 | 7.1 | A | (2.) | BOD | | mg/l | | 2.0 | 1.0 | A | (3.) | DO | | mg/l | | 6.4 | 5.4 | B | (4.) | COD | | mg/l | | 8.9 | 4 | A | |
14.4. No. of Ambient Noise monitoring locations : 08 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 60.8 | 39.8 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 48.7 | 38.2 | 70 | |
14.5. No. of Soil Sample Monitored locations : 03 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Kilogram per hectare | | 190.4 | 48.2 | (2.) | P(Phosphorus) | Kilogram per hectare | | 28.2 | 7.6 | (3.) | Electric Conductivity | Others | mmhos/cm | 0.35 | 0.25 | (4.) | pH | | | 7.28 | 6.80 | (5.) | N(Nitrogen) | Kilogram per hectare | | 294 | 105 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10.5 To 5.2 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3.8 To 7.2 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 7283 | 8.0 | Copy of Permission Letter | Pipeline | | Others | Pumping | L576826 | 03 Jul 2019 | 45600 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial Waste | 66 | 100 | Neutralization Pit and Settling Tank | Others | Reuse | 66 | 0 | (2.) | Domestic Waste | 26 | 30 | STP | Green Belt Renewal Plant | | 26 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 92 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 92 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Ash (as Cinder) | Industrial Waste | | 146700 | Tons | 1.5 | Road | | Others | Will be raw material for brick manufacturing plant | (2.) | Tar | Industrial Waste | | 7800 | Tons | 40 | Road | | Others | Will be sold to the market to Authorized Vendors | (3.) | Furnace Recycled Scrap | Industrial Waste | | 16275 | Tons | 0.1 | Conveyor Belt | | Others | Will be recycled back in process | (4.) | Convertor Slag | Industrial Waste | | 3084 | Tons | 1.5 | Road | | Others | Will be utilized road making | (5.) | IF Slag | Industrial Waste | | 1782 | Tons | 1.5 | Road | | Others | crushed with slag crusher & brick manufacturing | (6.) | Waste | Industrial Waste | | 26861 | Tons | 1.5 | Road | | Others | Sold to tiles manufacturing | (7.) | Recycled Material | Industrial Waste | | 735 | Tons | 0.1 | Conveyor Belt | | Others | Will be recycled back in process | (8.) | ESP/Bag Filter | Industrial Waste | | 48000 | Tons | 0.5 | Conveyor Belt | | Others | Recycle as a raw material for respective plant | (9.) | Tailings | Industrial Waste | | 900000 | Tons | 62 | Road | | Others | Sold to Cement plant. MoU attached Annexure XVIII | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 44.7 | 0.1 | 0.05 | 44.76 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 90.8 | 0.1 | 0.5 | 91.31 | 100 | (3.) | PM2.5 | | Microgram per Meter Cube | 46.7 | 0 | 0 | 46.71 | 60 | (4.) | SO2 | | Microgram per Meter Cube | 38.1 | 0.1 | 0.2 | 38.31 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Ductile Pipe (with Induction Furnace) 4,00,000 TPA | - | 30 | 1.23 | PM10 | | 0.21 | (2.) | Pellet Plant (12,00,000 TPA) | Coal | 70 | 5.13 | PM10 | | 5.43 | (3.) | Pellet Plant (8,00,000 TPA) | Coal | 60 | 4.43 | PM10 | | 2.99 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 64290 | (b)Source | Chhattisgarh State Power Distribution Company Limi | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 0 | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 61.807 | (c)Government Land (ha.) | 142.645 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 204.452 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 13771.09 | (b)Waste/Barren Land (ha.) | 5718.78 | (c)Grazing/ Community Land (ha.) | 00 | (d)Surface Water Bodies (ha.) | 1103.84 | (e)Settlements (ha.) | 5285.95 | (f)Industrial (ha.) | 3820.08 | (g)Forest (ha.) | 00 | (h)Mangroves (ha.) | 00 | (i)Marine Area (ha.) | 00 | (j)Others (ha.) : Stone Quarry | 1691.9 | Total (ha.) | 31391.6400 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 20.321 | | (2.) | Water Reservoir | | 2.965 | | (3.) | Green belt | | 81 | 40% | (4.) | Tailing Pond | | 6.0 | | (5.) | Others | Other Facilities | 94.166 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Wildlife Corridors | NA | 0 | NA | (2.) | Corridors | NA | 0 | NA | (3.) | Critically Polluted Area | Siltara Industrial Area | 0 | Project Site is in Critically Polluted Area | (4.) | WLS | NA | 0 | NA | (5.) | NPA | NA | 0 | NA | (6.) | ESAs | NA | 0 | NA | (7.) | ESZs | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | NA | 0 | NA | (2.) | Archaeological Sites | | NA | 0 | NA | (3.) | Defence Installations | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 00 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 204.45 | (b)Land yet to be acquired(Ha) | 00 | (c)Status of Land acquisition if not acquired | 00 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | | (b)No. of Households | | (c)No. of PDFs (Project Displaced Families) | | (d)No. of PAFs (Project Affected Families) | | (e)Funds Allocated for R&R(in INR) (in Lacs) | | (f)Status of R&R | NA | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Peacock (Pavo cristatus) | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 8.33 | (iii)Period of Implementation | 5 Years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | Yes | (i)Uploaded copy of approval | Copy of approval | (ii)Letter No. | Sr.No./W.L./Management-485/2034 | (iii)Date of issue | 29 May 2020 | (iv)Recommendation | NA | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kharoon River | (ii)Direction of Water Bodies in Buffer Area | North West | (iii)Distance of Water Bodies in Buffer Area | 8 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 200 | (b)Permanent Employment-During Operation | 1165 | (c)Temporary Employment- During Construction | 300 | (d)Temporary Employment- During Operation | 1000 | (e)No. of working days | 330 | (f)Total Manpower | 2665 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 64.83 | 16.17 | 81 | (2.) | Percentage of Total Project Area | 33 | 7 | 40 | (3.) | No. of Plants | 97250 | 105250 | 202500 | (4.) | Funds Allocated | 8323350 | 1580000 | 9903350 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | MS scrap will be reused, Greenbelt Development | (2.) | Social | Employment generation, Development of Infrastructure under CER | (3.) | Financial | Revenue generation in form of GST, IT and Other Taxes for State and Central
Government. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/RA0101 | (ii)Name of the EIA Consultant | Pollution and Ecology Control Services | (iii)Address | Near Dhantoli Police Station, Dhantoli Nagpur | (iv)Mobile No. | 7720076427 | (v)Landline No. | 0712229322 | (vi)Email Id | pecs_nagpur@rediffmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 15 Nov 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Reply of ADS as per the MOM of 23rd reconstituted Expert Appraisal Committee held on 30th September 2020. | 13 Nov 2020 | 2. | NA | Proposal deferred for want of additional information. | 15 Oct 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | P S Dutta Gupta | Designation | Head - Corporate Affairs | Name of Company (Applicant Name should not be given here) | SARDA ENERGY AND MINERALS LIMITED | Address | Vanijya Bhawan, Jail Road, |
|