APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Capacity Expansion project for Manufacturing of Unsaturated Polyester Resin 500MT per Month to 2000 MT per Month at A-528, RIICO Industrial Area, Chopanki, Tapukara, Alwar, Rajasthan by M/s Revex Plasticisers Pvt. Ltd.
(b)Name of the Company / Organisation M/S REVEX PLASTICISERS PVT. LTD.
(c)Registered Address A-528, Chopanki Tapukara, Alwar, Rajasthan,,Alwar,Rajasthan-301707
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ramesh Chand Gupta
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address E-21, Basement, Naraina Vihar, New Delhi,,Delhi Cantonment.,South West,Delhi-110028
(d)Pin code 110028
(e)E-mail revexplasticisers528@gmail.com
(f)STD Code. 0(f)Telephone No.
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/RJ/IND2/172484/1989
(d)Master Proposal Number(Single Window) SW/172454/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. A-528
(b)Pincode 301707
(c)Bounded Latitudes (North)
From
Degree 28.9.30.4
Minutes
Second
From
Degree 28.9.34.2
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 76.52.36.4
Minutes
Second
From
Degree 76.52.41.7
Minutes
Second
(e)Survey of India Topo Sheet No. H43W16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 250
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.21
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number IA-J-11011/150/2020-IA-II(I)
(c)Date of Issue of TOR 06 Mar 1989
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 25 Mar 2021
(c)Date of Issue of EC 19 May 2021
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason As the existing project site is located in Notified Industrial Area, RIICO.
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. RPCB/RO/BWD/415/3390
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jan 15 2021 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Unsaturated Polyester Resin50015002000OthersMT/MonthRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Unsaturated Polyester Resin500 MT/Month1500 MT/Month2000 MT/Month
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 17 Apr 2017
(iv)Valid Upto 31 Aug 2021
(v)File No. F(Tech)/Alwar(Tijara)/3978(1)/2016-2017/23-24
(vi)Application No. 15766
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 10.93
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.15
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.05
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.058
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 17820000
(b)Existing quantity of raw material/fuel 5940000
(c)Total quantity of raw material/fuel 23760000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Maleic Anhydride3600000Tons per AnnumLocal marketRoad50 LinkageCopy of Linkage
(2.)Styrene7200000Tons per AnnumLocal marketRoad50 LinkageCopy of Linkage
(3.)Phthalic Anhydride6000000Tons per AnnumLocal marketRoad50 LinkageCopy of Linkage
(4.)Monoethylene Glycol (MEG)960000Tons per AnnumLocal marketRoad50 LinkageCopy of Linkage
(5.)Diehylene glycol (DEG)3600000Tons per AnnumLocal marketRoad50 LinkageCopy of Linkage
(6.)Propylene Glycol2400000Tons per AnnumGujaratRoad50 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2019 To 31 Dec 2019
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube38.720.738.280
(2.)SO2Micro Gram per Meter Cube35.812.435.580
(3.)PM2.5Micro Gram per Meter Cube56.924.856.360
(4.)PM10Micro Gram per Meter Cube93.471.492.6100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000.1
(2.)Chloridesmg/l92.6025.912501000
(3.)Heavy MetalsBoronmg/l000.51
(4.)Heavy MetalsCoppermg/l0.610.310.051.5
(5.)Heavy MetalsZincmg/l1.610.95515
(6.)Heavy MetalsAluminiummg/l000.030.2
(7.)Heavy MetalsManganesemg/l000.10.3
(8.)pHNA7.727.356.58.5
(9.)Total Hardnessmg/l272.0210.0200600
(10.)Fluoridemg/l0.710.3911.5
(11.)TDSmg/l562.0390.05002000
(12.)Heavy MetalsCoppermg/l0.610.310.051.5
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.797.42A
(2.)DOmg/l5.85.0B
(3.)BODmg/l149B
(4.)CODmg/l45.1030.10B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))63.2041.6070.00
(2.)Leq(Day)A-weighted decibels(dB(A))69.7051.6075.00
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare231.60212.33
(2.)K(Potassium)Kilogram per hectare234.0172.12
(3.)P(Phosphorus)Kilogram per hectare32.3418.65
(4.)pH7.617.24
(5.)Electric ConductivityMillisiemens per Centimetre0.360.33
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 4.70 To 75.0
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 5.72 To 76.10
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater120.5 Not Appliacble PipelineTube WellCGWA/NOC/IND/ORIG/2021/1035402 Jan 202112
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic wastewater1.51.5Septic TankReuse within the Plant & Recycling1.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1.5
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 1.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.01Kilolitre50RoadAuthorized Recyclers
(2.)Domestic wasteMunicipal Solid Waste2.0Tons0.0Otherswill be use within the plantOthersGreen belt
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube56.90.50.0156.9260
(2.)PM10Microgram per Meter Cube93.400.50.0793.48100
(3.)SO2Microgram per Meter Cube35.80.20.0135.8280
(4.)NOxMicrogram per Meter Cube38.70.60.0138.7280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler (10 Lack Kcal/hr)Wood Briquettes300.6SO20.01
(2.)DG SET (62.5 KVA)HSD60.2SO20.01
(3.)DG SET (125 KVA)HSD60.2PM100.07
(4.)Boiler (10 Lack Kcal/hr)Wood Briquettes300.6NOx0.01
(5.)DG SET (400 KVA)HSD60.2SO20.01
(6.)Boiler (2 Lack Kcal/hr)HSD300.5SO20.01
(7.)Boiler (10 Lack Kcal/hr))LPG300.5NOx0.01
(8.)DG SET (125 KVA)HSD60.2NOx0.01
(9.)Boiler (10 Lack Kcal/hr)Wood Briquettes300.6PM100.07
(10.)Boiler (2 Lack Kcal/hr)HSD300.5PM100.07
(11.)DG SET (125 KVA)HSD60.2SO20.01
(12.)DG SET (125 KVA)HSD60.2SO20.01
(13.)Boiler (2 Lack Kcal/hr)HSD300.5NOx0.01
(14.)Boiler (10 Lack Kcal/hr)LPG300.6SO20.01
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 142353
(b)Source Jaipur Vidyut Vitaran Nigam Limited
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) Existing- 1*125 KVA & 1*62.5 KVA Proposed
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0.00
(b)Private Land (ha.) 0.00
(c)Government Land (ha.) 1.00
(d)Revenue Land (ha.) 0.00
(e)Other Land (ha.) 0.00
    Total Land (ha.) 1.0
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 9072
(b)Waste/Barren Land (ha.) 1341
(c)Grazing/ Community Land (ha.) 00
(d)Surface Water Bodies (ha.) 58
(e)Settlements (ha.) 00
(f)Industrial (ha.) 2280
(g)Forest (ha.) 2325
(h)Mangroves (ha.) 00
(i)Marine Area (ha.) 00
(j)Others (ha.) : Rocky wasteland+ Built up+ Open Scrub+ Fallow Land 16719
    Total (ha.) 31795.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.37
(2.)Built Up Area0.24
(3.)OthersOpen Area0.39
Total (ha.) 1
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NA
(2.)CorridorsNA0NA
(3.)NPANA0NA
(4.)ESZsNA0NA
(5.)WLSNA0NA
(6.)Wildlife CorridorsNA0NA
(7.)ESAsNA00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NA
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.00
(b)Land yet to be acquired(Ha) 0.00
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Indori Nala
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 5.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 120
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 120
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt0.370.000.37
(2.)Percentage of Total Project Area370.0037
(3.)No. of Plants320175495
(4.)Funds Allocated50000106475156475
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialProposed capacity expansion project will provide direct and indirect employment to the local people. Thus, improves their livelihoods. It will also contribute to CER activities.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0166
(ii)Name of the EIA Consultant VARDAN ENVIRONET
(iii)Address Plot No. 82 A, Sec-5, IMT Manesar, Gurugram
(iv)Mobile No. 9971684812
(v)Landline No. 0124434375
(vi)Email Id industry@vardanenvironet.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 06 Nov 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. This is an expansion proposal accordingly, the PP shall submit the certified compliance report to the conditions of CTO from the SPCB. (S.No 9 of Form 2 has to revised and uploaded). 2. Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2). PP mentioned Not Applicable. 3. All old CTOs not uploaded to verify the violation, if any done by PP (S No. 9.1 of Form 2). 4. Details of earlier production capacity needs to be authenticated and uploaded to check the violation, if any. 5. Details (S.No. 18.1 at Form 2) w.r.t. Air Quality Impact Prediction needs to checked. How incremental GLC for most of the parameters are same. Please check again. 6. It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. 29 Sep 2020
2.NAThe correction have been made as per the instruction received 25 Mar 2021
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRamesh Chand Gupta
DesignationDirector
Name of Company (Applicant Name should not be given here)M/S REVEX PLASTICISERS PVT. LTD.
AddressA-528, Chopanki Tapukara, Alwar, Rajasthan
Print