Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Change in Product Mix of Surfactants and Pigments
(b)Name of the Company / Organisation M/S. ULTRAMARINE AND PIGMENTS LIMITED
(c)Registered Address Survey No: 52 & 846 Village: Karai Taluka: Walahaj District: Vellore,Tamil nadu,Vellore,Tamil Nadu-632403
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Vaithyalingam VP
(b)Designation (Owner/ Partner/ CEO) FM
(c)Address 25-B, SIPCOT Industrial Complex,,Wallajah,Vellore,Tamil Nadu-632403
(d)Pin code 632403
(e)E-mail fm@ultramarinepigments.net
(f)STD Code. 4172(f)Telephone No. 27850028
(g)Fax No. 278529
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/TN/IND2/171007/2019
(d)Master Proposal Number(Single Window) SW/171005/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey No 52 and 846, Plot no 25B, SIPCOT Industri
(b)Pincode 632403
(c)Bounded Latitudes (North)
From
Degree 12.950385
Minutes
Second
From
Degree 12.954337
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 79.313974
Minutes
Second
From
Degree 79.317860
Minutes
Second
(e)Survey of India Topo Sheet No. 57P/1, P/5 and O/8
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 185
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3.01
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Tamil Nadu
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number IA-J-11011/114/2019-IA-II(I)
(b)Date of Apply of TOR 31 Jul 2019
(c)Date of Issue of TOR / Standard ToR 13 Sep 2019
(d)Date of Apply of EC 02 Jan 2006
(e)Date of Issue of EC 01 Jan 2006
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project site is located inside the Notified Industrial Complex, SIPCOT
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By CPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on NIL
(iii)Letter No. Nil
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Mar 30 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Ultramarine Blue200100300OthersMT/MonthRoad,Rail
(2.)Linear Alkyl Benzene Sulphonic acid1350-3501000OthersMT/MonthRoad,Rail
(3.)Mixed metal Oxide Pigments05050OthersMT/MonthRoad,Rail
(4.)Speciality Surfactants0500500OthersMT/MonthRoad,Rail
(5.)Synthetic detergents4000-20002000OthersMT/MonthRoad,Rail
(6.)SLES or SLS015001500OthersMT/MonthRoad,Rail
(7.)Alpha olefin Sulphonate-AOS100001000OthersMT/MonthRoad,Rail
(8.)Bismuth Vanadate pigments-05050OthersMT/MonthRoad,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Compressors3 Nos-3 NosFilm Sulphonation Plant
(2.)Catalyst Tower1 Nos-1 nosFilm Sulphonation Plant
(3.)Electrical Panels3 Nos-3 NosFilm Sulphonation Plant
(4.)Scrubber1 Nos-1 NosFilm Sulphonation Plant
(5.)Chimney2 Nos-2 NosFilm Sulphonation Plant
(6.)Vacuum Pumps /Ejectors1 set-1 setFilm Sulphonation Plant
(7.)Kilns82 Nos-82 NosPigment Plant
(8.)Chimney6 Nos-6 NosPigment Plant
(9.)Agitating Tanks9 Nos-9 NosPigment Plant
(10.)Mixers5 Nos-5 NosPigment Plant
(11.)Bucket Elevator3 Nos-3 NosDetergent Plant
(12.)Vibrators7 nos-7 nosPigment Plant
(13.)Bucket Elevator3 Nos-3 NosDetergent Plant
(14.)Burners12 Nos-12 NosPigment plant
(15.)Storage Tanks2-2Detergent Plant
(16.)Thermic Fluid Heaters4 Nos-4 NosPigment plant
(17.)Multi Mills4 nos-4 nosPigment Plant
(18.)Storage Tanks35 Nos-35 NosFilm Sulphonation Plant
(19.)Pumps85 Nos-85 NosFilm Sulphonation Plant
(20.)Vacuum Drier1 No-1 NoFilm Sulphonation Plant
(21.)Cyclone Separator9 Nos-9 NosPigment Plant
(22.)Vibrators1 Nos-1nosPigment Plant
(23.)Reactors6 Nos-6 NosFilm Sulphonation Plant
(24.)Filters12 Nos-12 NosFilm Sulphonation Plant
(25.)Catalyst Tower1 Nos-1 nosFilm Sulphonation Plant
(26.)Catalyst Tower1 Nos-1 nosFilm Sulphonation Plant
(27.)Heat Exchanger7 Nos-7 NosFilm Sulphonation Plant
(28.)Agitating Tanks7 Nos-7 NosFilm Sulphonation Plant
(29.)Spray Drier2 Nos-2 NosFilm Sulphonation Plant
(30.)Scrubber1-1Pigment Plant
(31.)Storage Tanks4 Nos-4 NosPigment Plant
(32.)Ball Mills23 Nos-23 NosPigment Plant
(33.)Settling Tanks8 set-8 setPigment Plant
(34.)Filters3 Nos-3 NosPigment Plant
(35.)Blenders7 nos-7 nosPigment Plant
(36.)Dryers4 nos-4 nosPigment Plant
(37.)Electrostatic Precipitator1 No-1 NoFilm Sulphonation Plant
(38.)Burners12 Nos-12 NosPigment plant
(39.)Burners12 Nos-12 NosPigment plant
(40.)Burners12 Nos-12 NosPigment plant
(41.)Thermic Fluid Heaters4 Nos-4 NosPigment plant
(42.)Turbo Grinders7 nos-7 nosPigment Plant
(43.)Mixer2 nos-2 nosDetergent Plant
(44.)Bucket Elevator3 nos-3 nosPigment Plant
(45.)Bucket Elevator3 Nos-3 NosDetergent Plant
(46.)Cage Mills2 nos-2 nosDetergent Plant
(47.)Vibratos4-4Detergent Plant
(48.)Plodders3 nos-3 nosDetergent Plant
(49.)Blowers8 Nos-8 NosFilm Sulphonation Plant
(50.)Oven1 Nos-1 NosFilm Sulphonation Plant
(51.)Thermic Fluid Heaters4 Nos-4 NosPigment plant
(52.)Packing Machines9 nos-9 nosDetergent Plant
(53.)Catalyst Tower1 Nos-1 nosFilm Sulphonation Plant
(54.)Bucket Elevator3 Nos-3 NosDetergent Plant
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 03 Jul 2018
(iv)Valid Upto 03 Mar 2020
(v)File No. T2/TNPCB/F.0108VLR/RL/VLR/A/2018
(vi)Application No. F.0108VLR/RL/DEE/VLR/2017
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.4
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.03
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.0815
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? Yes
8.(a) If any Industrial Estate/Complex / Export processing Zones /Special Economic Zones/Biotech Parks / Leather Complex with homogeneous type of industries such as Items 4(d), 4(f), 5(e), 5(f), or those Industrial estates with pre –defined set of activities (not necessarily homogeneous, obtains prior environmental clearance, individual industries including proposed industrial housing within such estates /complexes will not be required to take prior environmental clearance, so long as the Terms and Conditions for the industrial estate/complex are complied with (Such estates/complexes must have a clearly identified management with the legal responsibility of ensuring adherence to the Terms and Conditions of prior environmental clearance, who may be held responsible for violation of the same throughout the life of the complex/estate
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 39
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 39
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)37 Raw materials8472.44OthersMT/monthLocalRoad20 Open MarketCopy of Linkage
(2.)LPG1250Otherskg/dayOpen MarketRoad12 Open MarketCopy of Linkage
(3.)HSD1000Otherslit/dayOpen MarketRoad6 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 15 Sep 2019 To 15 Mar 2020
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube36.8525.8636.6460
(2.)SO2Micro Gram per Meter Cube15.3610.7815.2780
(3.)NOxMicro Gram per Meter Cube31.9522.4231.7780
(4.)PM10Micro Gram per Meter Cube89.0462.4788.52100
    14.2.     No. of Ground Water monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l0.680.4311.5
(2.)Chloridesmg/l431.7274.292501000
(3.)Total Hardnessmg/l595172200600
(4.)pHNA8.017.126.58.5
(5.)TDSmg/l13323745002000
(6.)TSSmg/l1111
(7.)Heavy MetalsNickelmg/l0.010.010.020.02
    14.3.     No. of Surface Water monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.836.89A
(2.)CODmg/l25812E
(3.)BODmg/l82.31.9E
(4.)DOmg/l6.21.17E
    14.4.     No. of Ambient Noise monitoring locations : 08
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.952.255
(2.)Leq(Night)A-weighted decibels(dB(A))44.341.145
    14.5.     No. of Soil Sample Monitored locations : 08
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milligram per Kilogram43.7819.71
(2.)Electric ConductivityMillisiemens per Centimetre273.497.5
(3.)pH7.926.52
(4.)N(Nitrogen)Milligram per Kilogram309.52158.34
(5.)K(Potassium)Milligram per Kilogram381.24117.63
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersFrom SIPCOT412.80Copy of Permission LetterPipelineOtherspipelinenil09 Feb 2019412.8
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)industrial effluent39.240MEE and ATFDReuse within the Plant & Recycling39.2
(2.)Sewage460STPGreen Belt Renewal Plant4
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 43.2
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 43.2
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)InorganicMunicipal Solid Waste27.1Tons8RoadAuthorized Recyclers
(2.)OrganicMunicipal Solid Waste18.1Tons3RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube36.8510.1937.0560
(2.)NOxMicrogram per Meter Cube31.9510.193380
(3.)SO2Microgram per Meter Cube15.3611.621780
(4.)PM10Microgram per Meter Cube89.0413.2893100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)725 KVA DG - 2HSD90.25PM100.04
(2.)10 LKCal TFH -2LPG120.3NOx0.00
(3.)725 KVA DG -1HSD90.25SO20.02
(4.)10 LKCal TFH-1LPG90.3PM100.01
(5.)725 KVA DG - 1HSD90.25NOx0.00
(6.)10 LKCal TFH-1LGP90.3SO20.00
(7.)725 KVA DG _2HSD90.25NOx0.00
(8.)725 KVA DG - 2HSD90.25SO20.02
(9.)725 KVA DG - 1HSD90.25PM100.049
(10.)10 LKCal TFH-2LPG120.3PM100.02
(11.)10 LKCal TFH-2LPG120.3SO20.00
(12.)10 LKCal TFH -1LPG90.3NOx0.00
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1425
(b)Source TANGEDCO
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 725*2
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 8.66
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 8.66
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 19796
(b)Waste/Barren Land (ha.) 1442
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 4207
(e)Settlements (ha.) 2911
(f)Industrial (ha.) 325
(g)Forest (ha.) 3290
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : mines 258
    Total (ha.) 32229.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant8.66hectares
Total (ha.) 8.66
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Corridorsnil00
(2.)ESAsnil00
(3.)ESZsnil00
(4.)WLSnil00
(5.)NPAnil00
(6.)Critically Polluted AreaRanipet SIPCOT00
(7.)Wildlife Corridorsnil00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence Installationsnil00
(2.)Archaeological Sitesnil00
(3.)Forestnil00
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Ponnai River
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 4.24
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 250
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 360
(f)Total Manpower 250
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt30998.92500035998.92
(2.)Percentage of Total Project Area36642
(3.)No. of Plants46507505400
(4.)Funds Allocated45000500050000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Social250 people job
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0172
(ii)Name of the EIA Consultant HUBERT ENVIRO CARE SYSTEMS (P) LTD, CHENNAI
(iii)Address Hubert Enviro Care Systems (P) Ltd. A-21, (Behind Lions Club School) III Phase, Thiru Vi Ka Industrial Estate. Guindy, Chennai - 600 032. Ph: 044-43635555
(iv)Mobile No. 9884390811
(v)Landline No. 0444363555
(vi)Email Id moses@hecs.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 13 Oct 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. This is an expansion proposal accordingly, the PP shall submit the certified compliance report to the conditions of CTO from the SPCB. (S.No 9 of Form 2 has to revised and uploaded). 2. PP in form 2 (S.No. 27) has not adequately mentioned the details of R&R. Everything mentioned NA. 3. Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2). PP mentioned Not Applicable. 4. All old CTOs not uploaded to verify the violation, if any done by PP (S No. 9.1 of Form 2). 5. Details of earlier production capacity needs to be authenticated and uploaded to check the violation, if any. 6. Details of report as per OM dated 31.10.2019 (CPA) needs to be updated in form 2. 7. PP submitted the baseline data for the months ie. From 15 Sep 2019 To 15 Mar 2020, However it should be either October-December or Dec-Feb or March-May). 8. Details (S.No. 18.1 at Form 2) w.r.t. Air Quality Impact Prediction needs to checked. How incremental GLC for most of the parameters are same as 2.75. Please check again. 9. It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. 29 Sep 2020
2.NAThe correction have been made as per the instruction received 14 Oct 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVaithyalingam VP
DesignationFM
Name of Company (Applicant Name should not be given here)M/S. ULTRAMARINE AND PIGMENTS LIMITED
AddressSurvey No: 52 & 846 Village: Karai Taluka: Walahaj District: Vellore
Print