Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Virgo Laminates Limited
(b)Name of the Company / Organisation VIRGO LAMINATES LIMITED
(c)Registered Address Old Survey Number:342, Part of new survey No.342 paiki 1 amalgamated,Village-Sokhda,Taluka-Matar,District-Kheda,Kheda,Gujarat-387530
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Surinder Arora
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Old Survey No.342 paiki part of new survey No.342 paiki 1 amalgamated,Village-Sokhda,Taluka-Matar,,District-Kheda,Matar,Kheda,Gujarat-387530
(d)Pin code 387530
(e)E-mail virgolaminates2019@gmail.com
(f)STD Code. 79(f)Telephone No. 27450694
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/115864/2019
(d)Master Proposal Number(Single Window) SW/170985/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey No.: 342 Paiki 1 amalgamated,Village: Sokhd
(b)Pincode 387570
(c)Bounded Latitudes (North)
From
Degree 22.721822
Minutes
Second
From
Degree 22.722494
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.688175
Minutes
Second
From
Degree 72.688642
Minutes
Second
(e)Survey of India Topo Sheet No. F43G10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 22
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.28
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratKhedaMatar
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/264/2019-IA-II(I)
(b)Date of Apply of TOR 02 Sep 2019
(c)Date of Issue of TOR / Standard ToR 18 Oct 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :20 Jul 2020
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :21 Aug 2020
Distance of Public Hearing Venue from the Proposed Project :0.5
near project site of M/s. Virgo Laminates Ltd., Survey No.: 374 and 375
State :Gujarat
District :Kheda
Tehsil :Matar
Village :Sokhda
58How many people will get employment from the proposed project? What precaution will be taken for workers working in the project? Is there any impact on surrounding agriculture crop due to flue gasDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)P. F. /P. U. F. Reaction vessel (MS)16 Ton4(Qty)
(2.)R.O. plant-11 m3/hr.1(Qty)
(3.)D. G. Set100 KVA1(Qty)
(4.)M. F. Reaction vessel (MS)5 Ton5(Qty)
(5.)Steam boiler2 TPH1(Qty)
(6.)R.O. plant-11 m3/hr.1(Qty)
(7.)Cooling Tower100 TR1(Qty)
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Phenol Formaldehyde Resin2500OthersMT/MonthRoad,Rail
(2.)Melamine Formaldehyde Resin1500OthersMT/MonthRoad,Rail
(3.)Phenol Urea Formaldehyde Resin1000OthersMT/MonthRoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.456
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.04
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.824
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 62611.5
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 62611.5
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Phenol16596Tons per Annumlocal draders/suppliersRoad100 Open MarketCopy of Linkage
(2.)Caustic Flakes307.5Tons per Annumlocal draders/suppliersRoad100 Open MarketCopy of Linkage
(3.)Melamine7200Tons per Annumlocal Traders/suppliersRoad100 Open MarketCopy of Linkage
(4.)Urea2766Tons per Annumlocal Traders/suppliersRoad100 Open MarketCopy of Linkage
(5.)Formaldehyde (37%)35742Tons per Annumlocal Traders/suppliersRoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 09 Oct 2019 To 31 Dec 2019
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube28.0921.5627.9380
(2.)PM2.5Micro Gram per Meter Cube43.8138.6143.6560
(3.)SO2Micro Gram per Meter Cube15.649.8415.5380
(4.)PM10Micro Gram per Meter Cube77.0467.7676.95100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.657.156.58.5
(2.)Total Hardnessmg/l922431200600
(3.)OthersDOmg/l3300
(4.)Chloridesmg/l401.5276.12501000
(5.)OthersMagnesium as Mgmg/l121.99.130100
(6.)OthersMg Hardnessmg/l5023700
(7.)OthersPhosphorus as PO4-3mg/l3.61000
(8.)OthersColorOtherscu00515
(9.)OthersTurbidityOthersNTU1.240.1415
(10.)TDSmg/l191211485002000
(11.)OthersCa Hardnessmg/l60021000
(12.)OthersCODmg/l28400
(13.)Fluoridemg/l1.680.3411.5
(14.)OthersTempOthersdeg C34.131.900
(15.)OthersECOthersMicro Sim2812168800
(16.)OthersCalcium as Camg/l240.582.575200
(17.)OthersCarbonatemg/l0000
(18.)OthersBicarbonatemg/l2525400
(19.)OthersSodium as Namg/l15000
(20.)OthersBoron as Bmg/l000.51
(21.)OthersPhenolmg/l0000
(22.)OthersPhosphate as Pmg/l10.83000
(23.)OthersSulphate as SO4mg/l240.483200400
(24.)TSSmg/l926000
(25.)OthersAmmonical Nitrogenmg/l2.41.300
(26.)OthersBicarbonatemg/l2525400
(27.)OthersNitrate as NO3mg/l5.131.564545
(28.)OthersSodium as Namg/l781100
(29.)OthersPhosphate as Pmg/l10.83000
(30.)OthersTSmg/l1992123200
(31.)OthersBODmg/l9.11.300
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)OthersColorOtherscu00E
(2.)OthersBicarbonatemg/l999E
(3.)OthersBicarbonatemg/l999E
(4.)OthersPotassium as Kmg/l201E
(5.)OthersMagnesium as Mgmg/l53.416.2E
(6.)BODmg/l14.51.2E
(7.)CODmg/l484E
(8.)OthersECOthersµS1482341E
(9.)OthersTurbidityOthersNTU2.020.12E
(10.)OthersCa Hardnessmg/l20868.6E
(11.)OthersMg Hardnessmg/l219.867E
(12.)OthersBicarbonatemg/l999E
(13.)OthersBicarbonatemg/l999E
(14.)OthersBoron as Bmg/l00E
(15.)OthersPhenolmg/l00E
(16.)OthersPhosphorus as Pmg/l2.750E
(17.)OthersSulphate as SO4mg/l10426.3E
(18.)OthersNitrite as No2mg/l0.650E
(19.)OthersTSSmg/l5620E
(20.)OthersTSmg/l1064256E
(21.)OthersTSmg/l1064256E
(22.)OthersSodium as Namg/l425E
(23.)OthersTotal Hardness as CaCO3mg/l20868.6E
(24.)OthersPhosphate as PO4-3mg/l8.250E
(25.)OthersChloride as Clmg/l34184E
(26.)pHmg/l97.4E
(27.)OthersNitrate as NO3mg/l3.871.74E
(28.)DOmg/l1.81E
(29.)OthersTemperatureOthers°C35.533.5E
(30.)OthersAmmonical Nitrogenmg/l3.51.4E
(31.)OthersCalcium as Camg/l83.327.5E
(32.)OthersCarbonatemg/l330E
(33.)OthersFluoride as Fmg/l1.470.81E
(34.)OthersTDSmg/l1008232E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))63.335.570
(2.)Leq(Day)A-weighted decibels(dB(A))6944.875
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityMillisiemens per Centimetre581205
(2.)K(Potassium)Othersmg/g6.552.99
(3.)pH8.497.13
(4.)N(Nitrogen)Percent27.6314.8
(5.)P(Phosphorus)Milligram per Kilogram5.630
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.34 To 42.10
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.3 To 38.96
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater27.550Copy of Permission LetterPipelineTube Well21-4/5787/GJ/IND/202024 Feb 202027.55
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial19.86520ETPOthersZero Liquid Discharge19.8650
(2.)Domestic0.4051Septic Tank/Soak PitOthersSeptic Tank/ Soak Pit0.4050.0
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 20.27
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 20.27
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Discarded Drums and BagsIndustrial Waste33.56Tons10RoadAuthorized Recyclers
(2.)ETP SludgeIndustrial Waste45.19Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Used OilIndustrial Waste0.07Tons0RoadOthersReuse in Plant
(4.)Evaporation ResidueIndustrial Waste24.85Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube23.0800.0123.1080
(2.)NOxMicrogram per Meter Cube36.5700.0136.5980
(3.)PM10Microgram per Meter Cube85.2700.0585.33100
(4.)PM2.5Microgram per Meter Cube50.4800.0550.5460
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Steam BoilerCoal/BioCoal (3.9 MT/Month)300.5PM108.71
(2.)Steam BoilerCoal/ BioCoal(3.9 MT/Month)300.5SO20.37
(3.)D.G.SetDiesel110.5SO20.03
(4.)D.G.SetDiesel110.5PM100.0004
(5.)Steam BoilerCoal/BioCoal (3.96MT/Month)300.5NOx1.809
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 125
(b)Source Madhya Gujarat Vij Company Limited (MGVCL)
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) One D.G. set (100 KVA)
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.5860
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.5860
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 26736
(b)Waste/Barren Land (ha.) 1018
(c)Grazing/ Community Land (ha.) 832
(d)Surface Water Bodies (ha.) 1593
(e)Settlements (ha.) 1012
(f)Industrial (ha.) 100
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Water logged and salt pans 124
    Total (ha.) 31415.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.1935
(2.)Built Up Area0.20583
(3.)OthersOpen /Road Area0.18667
Total (ha.) 0.586
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNA0NA
(2.)Critically Polluted AreaNA0NA
(3.)ESAsNA0NA
(4.)NPANA0NA
(5.)WLSNA0NA
(6.)ESZsNA0NA
(7.)Wildlife CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNONE0NA
(2.)Archaeological SitesNONE0NA
(3.)ForestNONE0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.59
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired AQUIRED
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Peafowl (Peacock)
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Incorporated in EMP cost
(iii)Period of Implementation 5 year
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Mohar River – 1.28 km away in NE direction
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Vasna Bhujarg river
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 5.57
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 9
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 25
(f)Total Manpower 9
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.19
(b)Percentage of Total Project Area 32.42
(c)No. of Plants to be Planted 291
(d)Funds Allocated for Plantation 145000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Financial• Increase income of local population • It will boost Indian Economy by paying Taxes
(2.)Social• Improvement in local amenities facilities • Local people will get employment directly or indirectly • Improvement in road link facilities • Improvement in local civilization • Awareness in local educated people for new technology.
(3.)Environmental• Adoption of new technology • Increase requirement of man power
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/SA0142 (Rev.01)
(ii)Name of the EIA Consultant T. R. ASSOCIATES
(iii)Address T. R. Associates, A-401, S.G.Business Hub, Between Bhagwat Vidhyapith & Gota Over Bridge, Near Umiya Campus, S.G.Highway, Ahmedabad - 380060.
(iv)Mobile No. 9825371099
(v)Landline No. 9825371099
(vi)Email Id adm.trassociates@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 09 Oct 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSurinder Arora
DesignationDirector
Name of Company (Applicant Name should not be given here)VIRGO LAMINATES LIMITED
AddressOld Survey Number:342, Part of new survey No.342 paiki 1 amalgamated,Village-Sokhda,Taluka-Matar
Print