1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s. Virgo Laminates Limited | (b)Name of the Company / Organisation | VIRGO LAMINATES LIMITED | (c)Registered Address | Old Survey Number:342, Part of new survey No.342 paiki 1 amalgamated,Village-Sokhda,Taluka-Matar,District-Kheda,Kheda,Gujarat-387530 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Surinder Arora | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | Old Survey No.342 paiki part of new survey No.342 paiki 1 amalgamated,Village-Sokhda,Taluka-Matar,,District-Kheda,Matar,Kheda,Gujarat-387530 | (d)Pin code | 387530 | (e)E-mail | virgolaminates2019@gmail.com | (f)STD Code. | 79(f)Telephone No. | 27450694 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/115864/2019 | (d)Master Proposal Number(Single Window) | SW/170985/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 3 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Survey No.: 342 Paiki 1 amalgamated,Village: Sokhd | (b)Pincode | 387570 | (c)Bounded Latitudes (North) | | From | | Degree | 22.721822 | Minutes | | Second | | From | | Degree | 22.722494 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72.688175 | Minutes | | Second | | From | | Degree | 72.688642 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43G10 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 22 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1.28 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Kheda | Matar | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/264/2019-IA-II(I) | (b)Date of Apply of TOR | 02 Sep 2019 | (c)Date of Issue of TOR / Standard ToR | 18 Oct 2019 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 21 Aug 2020 | Distance of Public Hearing Venue from the Proposed Project : | 0.5 |
| near project site of M/s. Virgo Laminates Ltd., Survey No.: 374 and 375 | State : | Gujarat | District : | Kheda | Tehsil : | Matar | Village : | Sokhda |
| 58 | How many people will get employment from the proposed project? What precaution will be taken for workers working in the project?
Is there any impact on surrounding agriculture crop due to flue gas | District Magistrate | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | P. F. /P. U. F. Reaction vessel (MS) | 16 Ton | 4(Qty) | (2.) | R.O. plant-1 | 1 m3/hr. | 1(Qty) | (3.) | D. G. Set | 100 KVA | 1(Qty) | (4.) | M. F. Reaction vessel (MS) | 5 Ton | 5(Qty) | (5.) | Steam boiler | 2 TPH | 1(Qty) | (6.) | R.O. plant-1 | 1 m3/hr. | 1(Qty) | (7.) | Cooling Tower | 100 TR | 1(Qty) | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Phenol Formaldehyde Resin | 2500 | Others | MT/Month | Road,Rail | | (2.) | Melamine Formaldehyde Resin | 1500 | Others | MT/Month | Road,Rail | | (3.) | Phenol Urea Formaldehyde Resin | 1000 | Others | MT/Month | Road,Rail | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 2 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.456 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.04 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.824 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 62611.5 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 62611.5 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Phenol | 16596 | Tons per Annum | | local draders/suppliers | Road | | 100 | Open Market | | Copy of Linkage | (2.) | Caustic Flakes | 307.5 | Tons per Annum | | local draders/suppliers | Road | | 100 | Open Market | | Copy of Linkage | (3.) | Melamine | 7200 | Tons per Annum | | local Traders/suppliers | Road | | 100 | Open Market | | Copy of Linkage | (4.) | Urea | 2766 | Tons per Annum | | local Traders/suppliers | Road | | 100 | Open Market | | Copy of Linkage | (5.) | Formaldehyde (37%) | 35742 | Tons per Annum | | local Traders/suppliers | Road | | 100 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 09 Oct 2019 To 31 Dec 2019 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 28.09 | 21.56 | 27.93 | 80 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 43.81 | 38.61 | 43.65 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 15.64 | 9.84 | 15.53 | 80 | (4.) | PM10 | | Micro Gram per Meter Cube | 77.04 | 67.76 | 76.95 | 100 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.65 | 7.15 | 6.5 | 8.5 | (2.) | Total Hardness | | | mg/l | | 922 | 431 | 200 | 600 | (3.) | Others | DO | | mg/l | | 3 | 3 | 0 | 0 | (4.) | Chlorides | | | mg/l | | 401.5 | 276.1 | 250 | 1000 | (5.) | Others | Magnesium as Mg | | mg/l | | 121.9 | 9.1 | 30 | 100 | (6.) | Others | Mg Hardness | | mg/l | | 502 | 37 | 0 | 0 | (7.) | Others | Phosphorus as PO4-3 | | mg/l | | 3.61 | 0 | 0 | 0 | (8.) | Others | Color | | Others | cu | 0 | 0 | 5 | 15 | (9.) | Others | Turbidity | | Others | NTU | 1.24 | 0.14 | 1 | 5 | (10.) | TDS | | | mg/l | | 1912 | 1148 | 500 | 2000 | (11.) | Others | Ca Hardness | | mg/l | | 600 | 210 | 0 | 0 | (12.) | Others | COD | | mg/l | | 28 | 4 | 0 | 0 | (13.) | Fluoride | | | mg/l | | 1.68 | 0.34 | 1 | 1.5 | (14.) | Others | Temp | | Others | deg C | 34.1 | 31.9 | 0 | 0 | (15.) | Others | EC | | Others | Micro Sim | 2812 | 1688 | 0 | 0 | (16.) | Others | Calcium as Ca | | mg/l | | 240.5 | 82.5 | 75 | 200 | (17.) | Others | Carbonate | | mg/l | | 0 | 0 | 0 | 0 | (18.) | Others | Bicarbonate | | mg/l | | 252 | 54 | 0 | 0 | (19.) | Others | Sodium as Na | | mg/l | | 15 | 0 | 0 | 0 | (20.) | Others | Boron as B | | mg/l | | 0 | 0 | 0.5 | 1 | (21.) | Others | Phenol | | mg/l | | 0 | 0 | 0 | 0 | (22.) | Others | Phosphate as P | | mg/l | | 10.83 | 0 | 0 | 0 | (23.) | Others | Sulphate as SO4 | | mg/l | | 240.4 | 83 | 200 | 400 | (24.) | TSS | | | mg/l | | 92 | 60 | 0 | 0 | (25.) | Others | Ammonical Nitrogen | | mg/l | | 2.4 | 1.3 | 0 | 0 | (26.) | Others | Bicarbonate | | mg/l | | 252 | 54 | 0 | 0 | (27.) | Others | Nitrate as NO3 | | mg/l | | 5.13 | 1.56 | 45 | 45 | (28.) | Others | Sodium as Na | | mg/l | | 78 | 11 | 0 | 0 | (29.) | Others | Phosphate as P | | mg/l | | 10.83 | 0 | 0 | 0 | (30.) | Others | TS | | mg/l | | 1992 | 1232 | 0 | 0 | (31.) | Others | BOD | | mg/l | | 9.1 | 1.3 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | Others | Color | Others | cu | 0 | 0 | E | (2.) | Others | Bicarbonate | mg/l | | 99 | 9 | E | (3.) | Others | Bicarbonate | mg/l | | 99 | 9 | E | (4.) | Others | Potassium as K | mg/l | | 20 | 1 | E | (5.) | Others | Magnesium as Mg | mg/l | | 53.4 | 16.2 | E | (6.) | BOD | | mg/l | | 14.5 | 1.2 | E | (7.) | COD | | mg/l | | 48 | 4 | E | (8.) | Others | EC | Others | µS | 1482 | 341 | E | (9.) | Others | Turbidity | Others | NTU | 2.02 | 0.12 | E | (10.) | Others | Ca Hardness | mg/l | | 208 | 68.6 | E | (11.) | Others | Mg Hardness | mg/l | | 219.8 | 67 | E | (12.) | Others | Bicarbonate | mg/l | | 99 | 9 | E | (13.) | Others | Bicarbonate | mg/l | | 99 | 9 | E | (14.) | Others | Boron as B | mg/l | | 0 | 0 | E | (15.) | Others | Phenol | mg/l | | 0 | 0 | E | (16.) | Others | Phosphorus as P | mg/l | | 2.75 | 0 | E | (17.) | Others | Sulphate as SO4 | mg/l | | 104 | 26.3 | E | (18.) | Others | Nitrite as No2 | mg/l | | 0.65 | 0 | E | (19.) | Others | TSS | mg/l | | 56 | 20 | E | (20.) | Others | TS | mg/l | | 1064 | 256 | E | (21.) | Others | TS | mg/l | | 1064 | 256 | E | (22.) | Others | Sodium as Na | mg/l | | 42 | 5 | E | (23.) | Others | Total Hardness as CaCO3 | mg/l | | 208 | 68.6 | E | (24.) | Others | Phosphate as PO4-3 | mg/l | | 8.25 | 0 | E | (25.) | Others | Chloride as Cl | mg/l | | 341 | 84 | E | (26.) | pH | | mg/l | | 9 | 7.4 | E | (27.) | Others | Nitrate as NO3 | mg/l | | 3.87 | 1.74 | E | (28.) | DO | | mg/l | | 1.8 | 1 | E | (29.) | Others | Temperature | Others | °C | 35.5 | 33.5 | E | (30.) | Others | Ammonical Nitrogen | mg/l | | 3.5 | 1.4 | E | (31.) | Others | Calcium as Ca | mg/l | | 83.3 | 27.5 | E | (32.) | Others | Carbonate | mg/l | | 33 | 0 | E | (33.) | Others | Fluoride as F | mg/l | | 1.47 | 0.81 | E | (34.) | Others | TDS | mg/l | | 1008 | 232 | E | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 63.3 | 35.5 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 69 | 44.8 | 75 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | Electric Conductivity | Millisiemens per Centimetre | | 581 | 205 | (2.) | K(Potassium) | Others | mg/g | 6.55 | 2.99 | (3.) | pH | | | 8.49 | 7.13 | (4.) | N(Nitrogen) | Percent | | 27.63 | 14.8 | (5.) | P(Phosphorus) | Milligram per Kilogram | | 5.63 | 0 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.34 To 42.10 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.3 To 38.96 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 27.55 | 0 | Copy of Permission Letter | Pipeline | | Tube Well | | 21-4/5787/GJ/IND/2020 | 24 Feb 2020 | 27.55 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 19.865 | 20 | ETP | Others | Zero Liquid Discharge | 19.865 | 0 | (2.) | Domestic | 0.405 | 1 | Septic Tank/Soak Pit | Others | Septic Tank/ Soak Pit | 0.405 | 0.0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 20.27 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 20.27 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Discarded Drums and Bags | Industrial Waste | | 33.56 | Tons | 10 | Road | | Authorized Recyclers | | (2.) | ETP Sludge | Industrial Waste | | 45.19 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Used Oil | Industrial Waste | | 0.07 | Tons | 0 | Road | | Others | Reuse in Plant | (4.) | Evaporation Residue | Industrial Waste | | 24.85 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 23.08 | 0 | 0.01 | 23.10 | 80 | (2.) | NOx | | Microgram per Meter Cube | 36.57 | 0 | 0.01 | 36.59 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 85.27 | 0 | 0.05 | 85.33 | 100 | (4.) | PM2.5 | | Microgram per Meter Cube | 50.48 | 0 | 0.05 | 50.54 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Steam Boiler | Coal/BioCoal (3.9 MT/Month) | 30 | 0.5 | PM10 | | 8.71 | (2.) | Steam Boiler | Coal/ BioCoal(3.9 MT/Month) | 30 | 0.5 | SO2 | | 0.37 | (3.) | D.G.Set | Diesel | 11 | 0.5 | SO2 | | 0.03 | (4.) | D.G.Set | Diesel | 11 | 0.5 | PM10 | | 0.0004 | (5.) | Steam Boiler | Coal/BioCoal (3.96MT/Month) | 30 | 0.5 | NOx | | 1.809 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 125 | (b)Source | Madhya Gujarat Vij Company Limited (MGVCL) | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | One D.G. set (100 KVA) | (e)Stack Height (in m) | 11 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0.5860 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 0.5860 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 26736 | (b)Waste/Barren Land (ha.) | 1018 | (c)Grazing/ Community Land (ha.) | 832 | (d)Surface Water Bodies (ha.) | 1593 | (e)Settlements (ha.) | 1012 | (f)Industrial (ha.) | 100 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Water logged and salt pans | 124 | Total (ha.) | 31415.0000 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 0.1935 | | (2.) | Built Up Area | | 0.20583 | | (3.) | Others | Open /Road Area | 0.18667 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Corridors | NA | 0 | NA | (2.) | Critically Polluted Area | NA | 0 | NA | (3.) | ESAs | NA | 0 | NA | (4.) | NPA | NA | 0 | NA | (5.) | WLS | NA | 0 | NA | (6.) | ESZs | NA | 0 | NA | (7.) | Wildlife Corridors | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | NONE | 0 | NA | (2.) | Archaeological Sites | | NONE | 0 | NA | (3.) | Forest | | NONE | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.59 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | AQUIRED | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | | (b)No. of Households | | (c)No. of PDFs (Project Displaced Families) | | (d)No. of PAFs (Project Affected Families) | | (e)Funds Allocated for R&R(in INR) (in Lacs) | | (f)Status of R&R | NA | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Indian Peafowl (Peacock) | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | Incorporated in EMP cost | (iii)Period of Implementation | 5 year | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Mohar River – 1.28 km away in NE direction | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Vasna Bhujarg river | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 5.57 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 9 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 25 | (f)Total Manpower | 9 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.19 | (b)Percentage of Total Project Area | 32.42 | (c)No. of Plants to be Planted | 291 | (d)Funds Allocated for Plantation | 145000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | • Increase income of local population
• It will boost Indian Economy by paying Taxes | (2.) | Social | • Improvement in local amenities facilities
• Local people will get employment directly or indirectly
• Improvement in road link facilities
• Improvement in local civilization
• Awareness in local educated people for new technology. | (3.) | Environmental | • Adoption of new technology
• Increase requirement of man power | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Industrial Projects - 3 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1922/SA0142 (Rev.01) | (ii)Name of the EIA Consultant | T. R. ASSOCIATES | (iii)Address | T. R. Associates, A-401, S.G.Business Hub, Between Bhagwat Vidhyapith & Gota Over Bridge, Near Umiya Campus, S.G.Highway, Ahmedabad - 380060. | (iv)Mobile No. | 9825371099 | (v)Landline No. | 9825371099 | (vi)Email Id | adm.trassociates@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 3 | (ix)Validity of Accreditation | 09 Oct 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Surinder Arora | Designation | Director | Name of Company (Applicant Name should not be given here) | VIRGO LAMINATES LIMITED | Address | Old Survey Number:342, Part of new survey No.342 paiki 1 amalgamated,Village-Sokhda,Taluka-Matar |
|