Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Shyam Dye Chem
(b)Name of the Company / Organisation SHYAM DYE CHEM
(c)Registered Address Bunglow No. 19, Vaikunth Society GIDC, Ankleshwar,,Bharuch,Gujarat-393002
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Keshavbhai Savaliya
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address Plot No. 6919 , 6901 ,GIDC, Ankleashwar,,Anklesvar,Bharuch,Gujarat-393002
(d)Pin code 393002
(e)E-mail shyamdyes@gmail.com
(f)STD Code. 2646(f)Telephone No. 2210000
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/170801/2019
(d)Master Proposal Number(Single Window) SW/170764/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No.: 6919 & 6901
(b)Pincode 393001
(c)Bounded Latitudes (North)
From
Degree 21.6179
Minutes
Second
From
Degree 21.6179
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.0411
Minutes
Second
From
Degree 73.0411
Minutes
Second
(e)Survey of India Topo Sheet No. F43M14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 20
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.7
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number SEIAA/GUJ/TOR/5(f)/1122/2019
(b)Date of Apply of TOR 24 May 2019
(c)Date of Issue of TOR / Standard ToR 30 Jul 2019
(d)Date of Apply of EC
(e)Date of Issue of EC
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter NA
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Unit is in GIDC Area
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. ---
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 23 2020 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Solvent Oil Orange3611641200Tons per Annum(TPA)Road
(2.)Solvent Oil Red-233611641200Tons per Annum(TPA)Road
(3.)Solvent Violet-133611641200Tons per Annum(TPA)Road
(4.)Pigment Red-12012001200Tons per Annum(TPA)Road
(5.)Pigment Red-2012001200Tons per Annum(TPA)Road
(6.)Pigment Red-32012001200Tons per Annum(TPA)Road
(7.)Pigment Yelloe-12012001200Tons per Annum(TPA)Road
(8.)Acid Blue-73611641200Tons per Annum(TPA)Road
(9.)Acid Yellow-113611641200Tons per Annum(TPA)Road
(10.)Acid Yellow-113611641200Tons per Annum(TPA)Road
(11.)Acid Brown-143611641200Tons per Annum(TPA)Road
(12.)Reactive Golden Yellow3611641200Tons per Annum(TPA)Road
(13.)Fast Garnet GBC3611641200Tons per Annum(TPA)Road
(14.)Pigment Red-53:1012001200Tons per Annum(TPA)Road
(15.)Acid Violet-493611641200Tons per Annum(TPA)Road
(16.)Acid Blue-1133611641200Tons per Annum(TPA)Road
(17.)Acid Blue-33611641200Tons per Annum(TPA)Road
(18.)Acid Yellow-423611641200Tons per Annum(TPA)Road
(19.)Solvent Yellow 723611641200Tons per Annum(TPA)Road
(20.)Solvent Green-33611641200Tons per Annum(TPA)Road
(21.)Pigment Yelow-2012001200Tons per Annum(TPA)Road
(22.)Pigment Rubin Toner012001200Tons per Annum(TPA)Road
(23.)Pigment Red- 210012001200Tons per Annum(TPA)Road
(24.)Pigment Yellow-14012001200Tons per Annum(TPA)Road
(25.)Bismark Brown012001200Tons per Annum(TPA)Road
(26.)Acid Orange -ll3611641200Tons per Annum(TPA)Road
(27.)Solvent Red-1113611641200Tons per Annum(TPA)Road
(28.)Solvent Red-183611641200Tons per Annum(TPA)Road
(29.)Solvent Blue-363611641200Tons per Annum(TPA)Road
(30.)Pigment Red-60:1012001200Tons per Annum(TPA)Road
(31.)Acid Red-523611641200Tons per Annum(TPA)Road
(32.)Solvent Oil Red-243611641200Tons per Annum(TPA)Road
(33.)Pigment Yelow-3012001200Tons per Annum(TPA)Road
(34.)Pigment Yelow-3012001200Tons per Annum(TPA)Road
(35.)Pigment Rubin Toner012001200Tons per Annum(TPA)Road
(36.)Pigment Rubin Toner012001200Tons per Annum(TPA)Road
(37.)Pigment Rubin Toner012001200Tons per Annum(TPA)Road
(38.)Pigment Yellow-74012001200Tons per Annum(TPA)Road
(39.)Acid Yellow-1133611641200Tons per Annum(TPA)Road
(40.)Solvent Yellow-23611641200Tons per Annum(TPA)Road
(41.)Pigment Rubin Toner012001200Tons per Annum(TPA)Road
(42.)Pigment Red-31012001200Tons per Annum(TPA)Road
(43.)Basic Crysoline012001200Tons per Annum(TPA)Road
(44.)Acid Brown-553611641200Tons per Annum(TPA)Road
(45.)Solvent Brown 13611641200Tons per Annum(TPA)Road
(46.)Solvent Blue-353611641200Tons per Annum(TPA)Road
(47.)Solvent Brown-413611641200Tons per Annum(TPA)Road
(48.)Pigment Red- 112012001200Tons per Annum(TPA)Road
(49.)Acid Scarlet-3R3611641200Tons per Annum(TPA)Road
(50.)Acid Red-883611641200Tons per Annum(TPA)Road
(51.)Solvent Red-13611641200Tons per Annum(TPA)Road
(52.)Pigment Red-4012001200Tons per Annum(TPA)Road
(53.)Basic Green-4012001200Tons per Annum(TPA)Road
(54.)Pigment Red-48012001200Tons per Annum(TPA)Road
(55.)Basic Blue-9012001200Tons per Annum(TPA)Road
(56.)Ramazole Black3611641200Tons per Annum(TPA)Road
(57.)Reactive Red3611641200Tons per Annum(TPA)Road
(58.)Pigment Yellow-1012001200Tons per Annum(TPA)Road
(59.)Pigment Yello-13012001200Tons per Annum(TPA)Road
(60.)Basic Violet-16012001200Tons per Annum(TPA)Road
(61.)Acid Blue-1943611641200Tons per Annum(TPA)Road
(62.)Pigment Red-3012001200Tons per Annum(TPA)Road
(63.)Basic Brown-1012001200Tons per Annum(TPA)Road
(64.)Pigment Red-57012001200Tons per Annum(TPA)Road
(65.)Pigment Yellow-65012001200Tons per Annum(TPA)Road
(66.)Acid Blue-13611641200Tons per Annum(TPA)Road
(67.)Acid Blue-1193611641200Tons per Annum(TPA)Road
(68.)Acid Yellow-493611641200Tons per Annum(TPA)Road
(69.)Ramazole Orange3611641200Tons per Annum(TPA)Road
(70.)Pigment Yelow-3012001200Tons per Annum(TPA)Road
(71.)Pigment Red-53012001200Tons per Annum(TPA)Road
(72.)Pigment Yellow-17012001200Tons per Annum(TPA)Road
(73.)Acid Yellow-363611641200Tons per Annum(TPA)Road
(74.)Pigment Orange-14012001200Tons per Annum(TPA)Road
(75.)Pigment Red-8012001200Tons per Annum(TPA)Road
(76.)Pigment Yellow-13012001200Tons per Annum(TPA)Road
(77.)Basic Orange-2012001200Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)MSRL1016 KL
(2.)Pulverize112
(3.)Filter Press101
(4.)MSRL011
(5.)Dryer112
(6.)MSRL10112 KL
(7.)Ball mill101
(8.)Ball mill112
(9.)Dryer112
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 06 Aug 2018
(iv)Valid Upto 22 Aug 2023
(v)File No. AWH-95210
(vi)Application No. 137275
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 3.29
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.57
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.065
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.14
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 196.2
(b)Existing quantity of raw material/fuel 7149.89
(c)Total quantity of raw material/fuel 7346.09
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Ortho Toluidine1200Tons per AnnumShreeji Industries, AnkleshwarRoad10 Open MarketCopy of Linkage
(2.)Chloro Sulpho Toludine708Tons per Annumsun white chemicals, AnkleshwarRoad9 Open MarketCopy of Linkage
(3.)Sulphanilic Acid600Tons per AnnumYomas Enterprise, AnkleshwarRoad7 Open MarketCopy of Linkage
(4.)HCl420Tons per AnnumTriveni ChemicalsRoad8 Open MarketCopy of Linkage
(5.)H Acid564Tons per AnnumShrihari Chemicals TradingRoad9 Open MarketCopy of Linkage
(6.)Para Amino Azo Benzne98Tons per AnnumShreeji Industries, AnkleshwarRoad3 Open MarketCopy of Linkage
(7.)Caustic456Tons per AnnumAmrut Enterprises, AnkleshwarRoad8 Open MarketCopy of Linkage
(8.)Cynuric chloride336Tons per AnnumGomoswa International, AnkleshwarRoad6 Open MarketCopy of Linkage
(9.)Aniline504Tons per AnnumPar Industries, AnkleshwarRoad5 Open MarketCopy of Linkage
(10.)Beta Naphthol756Tons per AnnumPar Industries, AnkleshwarRoad9 Open MarketCopy of Linkage
(11.)Sodium Nitrite432Tons per AnnumKrishna Enterprise, AnkleshwarRoad9 Open MarketCopy of Linkage
(12.)Salt1272Tons per AnnumPadmavati salt Pvt. Ltd., AnkleshwarRoad6 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube905989100
(2.)PM2.5Micro Gram per Meter Cube48224760
(3.)SO2Micro Gram per Meter Cube4894680
(4.)NOxMicro Gram per Meter Cube50124980
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l6020100500
(2.)Chloridesmg/l8441812501000
(3.)Fluoridemg/l0.490.0511.5
(4.)TDSmg/l259110985002000
(5.)Total Hardnessmg/l481129300600
(6.)pHNA8.27.16.58.5
(7.)Heavy MetalsIronmg/l0.540.10.31
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.53.8C
(2.)CODmg/l00C
(3.)pHNA96C
(4.)BODmg/l00C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))504575
(2.)Leq(Night)A-weighted decibels(dB(A))623770
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milliequivalents per 100 Gram15.310.2
(2.)N(Nitrogen)Milliequivalents per 100 Gram15.111.48
(3.)Electric ConductivityMillisiemens per Centimetre1.921.18
(4.)pH8.57.2
(5.)K(Potassium)Milliequivalents per 100 Gram1.890.39
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 0
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 0
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC Ankleshwar83Copy of Permission LetterPipelineOthersPipeline / TankerNTA/ANK/DEE(WS)/20811 Feb 202065
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial5960ETP,RO,MEE,ATFDReuse within the Plant & Recycling,Others3 KLD ETP Sludge and MEE salt dispose in TSDF site563
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 59
(b)Total Discharged Water (Kilolitre per Day) 3
(c)Total Reused Water (Kilolitre per Day) 56
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Empty barrels/containers/linersIndustrial Waste30Tons2RoadAuthorized Recyclers
(2.)RO MembraneIndustrial Waste2Tons3RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Spent CarbonIndustrial Waste1Tons3RoadCo-Processing
(4.)Used OilIndustrial Waste4Tons2RoadAuthorized Recyclers
(5.)ETP SludgeIndustrial Waste150Tons3RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)MEE SaltIndustrial Waste474.5Tons3RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube489.760.4548.580
(2.)PM2.5Microgram per Meter Cube482.420.0148.160
(3.)NOxMicrogram per Meter Cube502.730.3750.480
(4.)PM10Microgram per Meter Cube909.760.0590.1100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Hot Air GeneratorNatural Gas11400OthersPM, SO2, NOx120,80,40
(2.)BoilerNatural Gas11400OthersPM, SO2, NOx120,80,40
(3.)D. G. SetDiesel11300OthersPM, SO2, NOx120,80,40
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 60
(b)Source DGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) D.G. Set (250 KVA)
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.1607
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.1607
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 4743.53
(b)Waste/Barren Land (ha.) 5097.08
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1418.57
(e)Settlements (ha.) 0
(f)Industrial (ha.) 4562.30
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Fallow Land, degraded , sand land veg 15661.18
    Total (ha.) 31482.6600
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.05624
(2.)Green belt0.03535
(3.)Othersopen plot,roads and storage area0.06910
Total (ha.) 0.16069
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaGIDC Ankleshwar0Unit is in Critically Polluted Area
(2.)NPA----0Not Applicable
(3.)ESZs---0Not Applicable
(4.)Wildlife Corridors----0Not Applicable
(5.)WLS---0Not Applicable
(6.)Corridors---0Not Applicable
(7.)ESAs---0Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forest---0Not Applicable
(2.)Archaeological Sites---0Not Applicable
(3.)Defence Installations---0Not Applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.16
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Already acquired by GIDC Ankleshwar
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 17
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 2
(e)No. of working days 365
(f)Total Manpower 24
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt100545.69645.69
(2.)Percentage of Total Project Area6.2133.9540.160000000000004
(3.)No. of Plants105565
(4.)Funds Allocated0300000300000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialProvide new employment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? Yes
(b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Show Cause Notice from GPCB
(c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Copy of Direction Issued
(d)Compliance status of the directions Complied
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. applied for NABET
(ii)Name of the EIA Consultant Jyoti Om Chemical Research Centre Pvt Ltd
(iii)Address K1 7705/2,3,4, GIDC , Ankleshwer
(iv)Mobile No. 9824150383
(v)Landline No. 0264622029
(vi)Email Id info@jyotiom.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 30 Dec 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThis is an expansion proposal accordingly, the PP shall submit the certified compliance report to the conditions of CTO from the SPCB. (S.No 9 of Form 2 has to revised and uploaded). PP has only uploaded the request letter to SPCB not the certified compliance report of CTO. Please submit this is mandatory requirement. 29 Sep 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKeshavbhai Savaliya
DesignationPartner
Name of Company (Applicant Name should not be given here)SHYAM DYE CHEM
AddressBunglow No. 19, Vaikunth Society GIDC, Ankleshwar
Print