Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Rosso Laminate LLP
(b)Name of the Company / Organisation ROSSO LAMINATE LLP
(c)Registered Address Survey no. 55 Paiki 1,/Paiki 2, 55 Paiki 3, Opposite to Ashwamegh hotel, NH-8A, At. Timbadi, Morbi-363642, Gujarat.,,Morbi,Gujarat-363642
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rajeshbhai Becharbhai Boda
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address Survey no. 55 Paiki 1/Paiki 2, 55 Paiki 3, Opposite Ashwamegh Hotel, NH-8A, At. - Timbadi, Morbi 363642, Gujarat,,Morbi,Morbi,Gujarat-363642
(d)Pin code 363642
(e)E-mail rossolaminatellp@gmail.com
(f)STD Code. 79(f)Telephone No. 27450694
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/109912/2019
(d)Master Proposal Number(Single Window) SW/170674/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey No: 55 Paiki 1/Paiki 2, 55 Paiki 3, Opposit
(b)Pincode 363642
(c)Bounded Latitudes (North)
From
Degree 22.876194
Minutes
Second
From
Degree 22.877694
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 70.849908
Minutes
Second
From
Degree 70.850522
Minutes
Second
(e)Survey of India Topo Sheet No. F42K13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 45
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3.39
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratMorbiMorbi
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/221/2019-IA-II(I)
(b)Date of Apply of TOR 22 Jul 2019
(c)Date of Issue of TOR / Standard ToR 26 Aug 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :08 Jul 2020
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :10 Aug 2020
Distance of Public Hearing Venue from the Proposed Project :0
Project site
State :Gujarat
District :Morbi
Tehsil :Morbi
Village :Timbadi
50Will there adverse effect of smoke emitting from stack on nearby people and agriculture? What will be the benefits in nearby villages due to proposed project? What precautions will be taken for woDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Steam Boiler3 TPH1 quantity
(2.)M. F. /U. F. Reaction vessel3 KL2 quantity
(3.)P. F. Reaction vessel8.5 KL1 quantity
(4.)Cooling Tower200 TR & 100 TR2 Quantity
(5.)D. G. Set500 kVA1 quantity
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Phenol Formaldehyde Resin200OthersMT/MRoad,Rail
(2.)Melamine Formaldehyde Resin100OthersMT/MRoad,Rail
(3.)Urea Formaldehyde Resin200OthersMT/MRoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 0.85
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.3328
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.017
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.4524
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 512.63
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 512.63
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Phenol92.21OthersMT/MLocal Traders/SuppliersRoad100 Open MarketCopy of Linkage
(2.)Caustic Flakes2.55OthersMT/MLocal Traders/SuppliersRoad100 Open MarketCopy of Linkage
(3.)Melamine40OthersMT/MLocal Traders/SuppliersRoad100 Open MarketCopy of Linkage
(4.)Acetic acid1OthersMT/MLocal Traders/SuppliersRoad100 Open MarketMT/MCopy of Linkage
(5.)Formaldehyde (37%)297.87OthersMT/MLocal Traders/SuppliersRoad100 Open MarketCopy of Linkage
(6.)Urea79OthersMT/MLocal Traders/SuppliersRoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 11 Oct 2019 To 01 Jan 2020
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube75.362.0775.08100
(2.)SO2Micro Gram per Meter Cube17.5710.317.1180
(3.)PM2.5Micro Gram per Meter Cube44.5037.744.4760
(4.)NOxMicro Gram per Meter Cube31.9323.7731.5180
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.666.976.58.5
(2.)TSSmg/l762400
(3.)TDSmg/l48409685002000
(4.)Total Hardnessmg/l1147392200600
(5.)OthersECOthersµS7123142400
(6.)OthersBicarbonatemg/l35020000
(7.)OthersPhosphorus as PO4-3mg/l7.8000
(8.)OthersColorOtherscu00515
(9.)OthersSulphate as SO4mg/l281.381.4200400
(10.)OthersOdourNA0000
(11.)Heavy MetalsBoronmg/l000.50.5
(12.)OthersCarbonatemg/l0000
(13.)OthersFeacel ColiformOthersMPN0000
(14.)OthersTurbidityOthersNTU0.510.0711
(15.)OthersBicarbonatemg/l35020000
(16.)OthersSodium as Namg/l1121600
(17.)OthersTotal ColiformOthersMPN0000
(18.)Fluoridemg/l0.32001.5
(19.)OthersAmmonical Nitrogenmg/l3.250.9800
(20.)OthersTemperatureOthersdegree centigrate3729.500
(21.)OthersDissolved Oxygenmg/l5.12.900
(22.)OthersCalcium Hardnessmg/l45013200
(23.)Chloridesmg/l647.2171.22501000
(24.)OthersMagnesium Hardnessmg/l83625000
(25.)OthersNitrate as NO3mg/l6.842.89450
(26.)OthersPotassium as Kmg/l45300
(27.)OthersPhenolmg/l0000
(28.)OthersPhosphate as Pmg/l2.6000
(29.)OthersTSmg/l4908101600
(30.)OthersCODmg/l451200
(31.)OthersBODmg/l143.800
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA9.57.5E
(2.)DOmg/l3.81.7E
(3.)OthersTemperatureOthers°C3729.5E
(4.)OthersTurbidityOthersNTU2.540.08E
(5.)OthersAmmonical Nitrogenmg/l3.90.7E
(6.)OthersSulphate as SO4mg/l149.530.3E
(7.)OthersCODmg/l6120E
(8.)OthersMagnesium hardnessmg/l451197E
(9.)OthersBicarbonatemg/l22581E
(10.)OthersPhosphate as PO4-3mg/l35.730E
(11.)OthersTSSmg/l6832E
(12.)BODmg/l18.26.1E
(13.)OthersECOthersµS2200353E
(14.)OthersNitrate as NO3mg/l3.240E
(15.)OthersBoron as Bmg/l00E
(16.)OthersTDSmg/l1496240E
(17.)OthersTotal ColiformOthersMPN840E
(18.)OthersChloride as Clmg/l162116E
(19.)OthersSodium as Namg/l749E
(20.)CODmg/l6120E
(21.)OthersPotassium as Kmg/l111E
(22.)OthersTSmg/l1560272E
(23.)OthersCalcium hardnessmg/l10858.8E
(24.)OthersFluoride as Fmg/l1.30E
(25.)OthersPhosphate as PO4-3mg/l1.170E
(26.)OthersNitrite as No2mg/l0.60E
(27.)OthersColorOtherscu00E
(28.)OthersTotal Hardness as CaCO3mg/l411.8294.1E
(29.)OthersCalcium as Camg/l43.223.6E
(30.)OthersCarbonatemg/l7527E
(31.)OthersPhenolmg/l00E
(32.)OthersFeacel ColiformOthersMPN00E
(33.)OthersOdourOthersAgreeable00E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))68.945.775
(2.)Leq(Night)A-weighted decibels(dB(A))66.536.470
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.137.12
(2.)N(Nitrogen)Percent24.317.68
(3.)P(Phosphorus)Milligram per Kilogram3.620.81
(4.)K(Potassium)Othersmg/gm4.190.66
(5.)Electric ConductivityMillisiemens per Centimetre798231
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 13.65 To 2.36
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 12.38 To 3.51
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater17.550Copy of Permission LetterPipelineTube Well21-4/5634/GJ/IND/202008 Jan 202059.15
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic0.41Septic tank/spak pitOthersSeptic tank/soak pit0.40
(2.)Industrial7.037.5ETP followed by evaporator and condenserOthersZero liquid discharge7.0300
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 7.43
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 7.43
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used oilIndustrial Waste0.03Tons100RoadOthersReuse or send to recycler
(2.)Discarded containers/drumsIndustrial Waste4.65Tons100RoadOtherssale to recycler
(3.)ETP sludgeIndustrial Waste14.04Tons72RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Evaporation residueIndustrial Waste7.05Tons72RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube87.246.480.0887.5100
(2.)PM2.5Microgram per Meter Cube51.906.480.085260
(3.)SO2Microgram per Meter Cube25.9900.0526.180
(4.)NOxMicrogram per Meter Cube38.496.480.0138.680
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Steam Boilercoal/Bio-coal300.5PM105.36
(2.)Steam BoilerCoal/Bio-caol300.5NOx1.11
(3.)D.G. setHigh speed diesel oil300.5PM100.00011
(4.)D.G.SetH.S.D.300.5SO20.0008
(5.)steam boilercoal/bio-coal300.5SO20.22
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 315.5
(b)Source Paschim Gujarat Vij Company Limited (PGVCL), Morbi
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 500 kVA
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1.4569
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1.4569
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 23578
(b)Waste/Barren Land (ha.) 2833
(c)Grazing/ Community Land (ha.) 711
(d)Surface Water Bodies (ha.) 1184
(e)Settlements (ha.) 1843
(f)Industrial (ha.) 1159
(g)Forest (ha.) 73
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Others Water logged 37
    Total (ha.) 31418.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area0.5865
(2.)Green belt0.4807
(3.)OthersOpen area/road area0.3897
Total (ha.) 1.4569
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNot applicable0Not applicable
(2.)WLSNot applicable0Not applicable
(3.)ESAsNot applicable0Not applicable
(4.)ESZsNot applicable0Not applicable
(5.)NPANot applicable0Not applicable
(6.)CorridorsNot applicable0Not applicable
(7.)Wildlife CorridorsNot applicable0Not applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNot applicable0Not applicable
(2.)Archaeological SitesNot applicable0Not applicable
(3.)Defence InstallationsNot applicable0Not applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.46
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Peafowl
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Yes
(iii)Period of Implementation 5 Years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Macchu River – 3.39 km in SWS direction
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 30
(f)Total Manpower 10
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.48
(b)Percentage of Total Project Area 32.95
(c)No. of Plants to be Planted 584
(d)Funds Allocated for Plantation 361000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Social• Improvement in local amenities facilities • Local people will get employment directly or indirectly • Improvement in road link facilities • Improvement in local civilization • Awareness in local educated people for new technology.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/SA0142 (Rev.01)
(ii)Name of the EIA Consultant T. R. ASSOCIATES
(iii)Address T. R. Associates, A-401, S.G.Business Hub, Between Bhagwat Vidhyapith & Gota Over Bridge, Near Umiya Campus, S.G.Highway, Ahmedabad - 380060
(iv)Mobile No. 9825371099
(v)Landline No. 9825371099
(vi)Email Id adm.trassociates@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 09 Oct 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRajeshbhai Becharbhai Boda
DesignationPartner
Name of Company (Applicant Name should not be given here)ROSSO LAMINATE LLP
AddressSurvey no. 55 Paiki 1,/Paiki 2, 55 Paiki 3, Opposite to Ashwamegh hotel, NH-8A, At. Timbadi, Morbi-363642, Gujarat.