Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Existing Airport at Hisar (Development of Phase II)
(b)Name of the Company / Organisation DEPARTMENT OF CIVIL AVIATION, HARYANA
(c)Registered Address 3rd Floo, 30 Bay Building, Sec-17 B, Chandigarh,,Chandigarh,Chandigarh-160017
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant M S Duhan
(b)Designation (Owner/ Partner/ CEO) Consultant (Planning)
(c)Address 3rd Floor, 30 Bay Building, Sec-17 B, Chandigarh,,Chandigarh,Chandigarh,Chandigarh-160017
(d)Pin code 160017
(e)E-mail dptcivilaviation123@gmail.com
(f)STD Code. 172(f)Telephone No. 2701344
(g)Fax No. 01722709174
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(a) Air ports
Minor Activity
(b)Category A
(c)Proposal Number IA/HR/MIS/170656/1965
(d)Master Proposal Number(Single Window) SW/170653/2020
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Hisar
(b)Pincode 125001
(c)Bounded Latitudes (North)
From
Degree 3227752.0
Minutes
Second
From
Degree 3233354.0
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 565682.0
Minutes
Second
From
Degree 574400.0
Minutes
Second
(e)Survey of India Topo Sheet No. 44o/11,12,15,16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 216
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 15
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Haryana
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 10-31/2019-IA-III
(c)Date of Issue of TOR 01 Feb 1965
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 01 Sep 2020
(c)Date of Issue of EC 23 Nov 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :10 May 2020
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :10 Jun 2020
Distance of Public Hearing Venue from the Proposed Project :0
Within Existing Airport (Hisar)
State :Haryana
District :Hisar
Tehsil :Hisar
Village :Hisar
65Queries were related to the Employment Generation, CER activities, Diversion of of Dhansu & Barwala Road and Diversion of Rana Minor.OthersAdditional District Commissioner
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. HSPCB/HR/2020/672
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jul 3 2020 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Plot Area72.842840.862913.7000000000003Hectares(ha)OthersNot Applicable
(2.)Passenger035000003500000OthersPer YearOthersAir
(3.)Cargo Handling02000020000Tons per Annum(TPA)OthersAir
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Built-Up Area of Terminal Building & services12567.59 Sqm77432.41 Sqm90,000 SqmNew Building Proposed
(2.)Aerodrome Reference Code (ARC)B4E4E
(3.)Runway Dimension1220 m x 45 m3000 m x 60 m (with 7.5 m shoulders either side)3000 m x 60 m (with 7.5 m shoulders either side)
(4.)Passenger Peak Hour1009001000PAX
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 07 Dec 2019
(iv)Valid Upto 31 Mar 2022
(v)File No. HSPCB/Consent/:329986719HISCTO7039555
(vi)Application No. 7039555
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 946
(b) Funds Allocated for Environment Management (Capital) (in Crores) 39.995
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.74
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.7229
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1069500
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 1069500
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Aggregate870000OthersMTIndigenousRoad100 Open MarketCopy of Linkage
(2.)Sand110000OthersMTIndigenousRoad100 Open MarketCopy of Linkage
(3.)Bitumen14500OthersMTIndigenousRoad100 Open MarketCopy of Linkage
(4.)Steel45000OthersMTIndigenousRoad100 Open MarketCopy of Linkage
(5.)cement30000OthersMTIndigenousRoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube14258128100
(2.)NOxMicro Gram per Meter Cube29.514.329.480
(3.)SO2Micro Gram per Meter Cube15.26.913.980
(4.)PM2.5Micro Gram per Meter Cube53.623.249.760
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.717.356.58.5
(2.)Total Hardnessmg/l880246200600
(3.)TDSmg/l24844655002000
(4.)Fluoridemg/l0.80.411.5
(5.)TSSmg/l0000
(6.)Heavy MetalsZincmg/l0.930.27515
(7.)Chloridesmg/l424.81002501000
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l2.82.8B
(2.)CODmg/l2020A
(3.)pHNA7.487.48A
(4.)DOmg/l6.96.9A
    14.4.     No. of Ambient Noise monitoring locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))41.938.240-60
(2.)Leq(Day)A-weighted decibels(dB(A))53.550.350-65
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Kilogram per hectare212109
(2.)pH8.127.78
(3.)P(Phosphorus)Kilogram per hectare19.410.6
(4.)N(Nitrogen)Kilogram per hectare296168
(5.)Electric ConductivityOthersµmhos/cm428335
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.53 To 19.25
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.43 To 18.30
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface4180.1Copy of Permission LetterPipelineOthersPipeline10285-86/HR/OHD08 Nov 2019550
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic & Flushing465550STPReuse within the Plant & Recycling,Green Belt Renewal Plant,Others23 KLD Losses4650
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 465
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 465
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Recyclable WasteMunicipal Solid Waste1321.3Tons30RoadAuthorized Recyclers
(2.)Compostable WasteMunicipal Solid Waste560.64Tons0OthersInhouse TreatmentOthersOWC
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube38.50.1038.5160
(2.)NOxMicrogram per Meter Cube26.30.126.452.7180
(3.)SO2Microgram per Meter Cube13.80.1013.8180
(4.)PM10Microgram per Meter Cube830.11.2184.22100
(5.)Others(Specify)COMicrogram per Meter Cube6600.144.57052000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Sets (5x750 KVA)HSD120.4NOx0.075 g/s
(2.)DG Sets (5x750 KVA)HSD120.4PM100.016 g/s
(3.)DG Sets (5x750 KVA)HSD120.4SO20.0143 g/s
(4.)DG Sets (3x500 KVA)HSD120.35PM100.013 g/s
(5.)DG Sets (3x500 KVA)HSD120.35NOx0.063 g/s
(6.)DG Sets (3x500 KVA)HSD120.35SO20.119 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 10000
(b)Source Dakshin Haryana Bijli Vitran Nigam
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 5x750 KVA & 3x500 KVA
(e)Stack Height (in m) 12
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 4.71
(b)Private Land (ha.) 0
(c)Government Land (ha.) 2908.99
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 2913.7
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 43374
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 157
(e)Settlements (ha.) 6249
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Vegetation Land including Forest & Open Scrub 8243
    Total (ha.) 58023.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersPlot Area2913.7Airport Land
Total (ha.) 2913.7
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNone0None
(2.)Wildlife CorridorsNone0None
(3.)NPANone0None
(4.)ESZsNone0None
(5.)Critically Polluted AreaNone0None
(6.)WLSNone0None
(7.)ESAsNone0None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestBir Hisar PF0.01East Direction
(2.)Archaeological SitesNone0None
(3.)Defence InstallationsHisar Cant.7.5SE Direction
(4.)OthersForest Area within SiteHisar to Barwala & Hisar to Dhansu Road0Within Site (4.71 Ha forest land)
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 3658
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1699.6
(b)Land yet to be acquired(Ha) 1214.1
(c)Status of Land acquisition if not acquired Partially completed
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Pavo cristatus
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Rana Minor
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Blue Bird Lake
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 0.05
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 500
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 3640
(e)No. of working days 365
(f)Total Manpower 4140
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt0107.22107.22
(2.)Percentage of Total Project Area03.73.7
(3.)No. of Plants03800038000
(4.)Funds Allocated0200000000200000000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalProject will reduce the share of private vehicle on the roads thereby reducing GHG generation from vehicles
(2.)SocialEmployment Generation & • Up liftmen of nearby area
(3.)FinancialRevenue Generation & Increase in GDP of country
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 35
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 2
(d)Total plot area (sqm) 29137000
(e)Total built up area (sqm) 90000
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 1
(b)Capacity 10000
(c)No. of Recharge Pits 60
(d)Capacity 32
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 250
5.
Energy Saving Measures:
(a)Source/Mode Solar and LED
(b)Percentage 20
(c)Quantity 2000
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area None
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA070
(ii)Name of the EIA Consultant EQMS India Pvt. Ltd.
(iii)Address 304-305, 3rd Floor, Plot No. 16, Rishabh Corporate Tower, Community Centre, Karkardooma, Delhi
(iv)Mobile No. 9810297612
(v)Landline No. 0114227008
(vi)Email Id eqms@eqmsindia.org
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 31 Oct 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantM S Duhan
DesignationConsultant (Planning)
Name of Company (Applicant Name should not be given here)DEPARTMENT OF CIVIL AVIATION, HARYANA
Address3rd Floo, 30 Bay Building, Sec-17 B, Chandigarh
Print