1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Residential Complex M2K Victoria Gardens | (b)Name of the Company / Organisation | NEGOLICE INDIA LIMITED | (c)Registered Address | E-34, 2nd Floor, Connaught Circus, New Delhi,,Central,Delhi-110001 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | SatishPal Singh | (b)Designation (Owner/ Partner/ CEO) | VicePresident | (c)Address | E-34, 2nd Floor, Connaught Circus, New Delhi,,Pahar Ganj,Central,Delhi-110001 | (d)Pin code | 110001 | (e)E-mail | rajesh.kumar@m2kindia.com | (f)STD Code. | 11(f)Telephone No. | 48486000 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 8(b) Townships and Area Development projects.
| Minor Activity | 8(b) Townships and Area Development projects.
| (b)Category | B1 | Reason for Applying at Ministry | SEIAA | (c)Proposal Number | IA/DL/MIS/170497/2019 | (d)Master Proposal Number(Single Window) | SW/170495/2020 | (e)EAC concerned (for category A Projects only) | INFRA-2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Azadpur, Delhi | (b)Pincode | 110052 | (c)Bounded Latitudes (North) | | From | | Degree | 3177264.75 | Minutes | | Second | | From | | Degree | 3177476.81 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 712604.63 | Minutes | | Second | | From | | Degree | 712845.69 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | H43X2 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 220 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1.45 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Delhi | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | F. No. 21-99/2020-IA.III | (c)Date of Issue of TOR | 01 Jan 1900 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 26 Nov 2020 | (c)Date of Issue of EC | 13 Jan 2021 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | As per EIA Notification 2006 and its amendment, all building construction projects are exempted from public hearing | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Lucknow | (iii)Letter No. | 4-294/07/651 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Oct 23 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Total Plot are | 1.8372744 | 0 | 1.8372744 | Hectares(ha) | | Others | NA | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | No. of Apartments | 476 | 150 | 488 | - | (2.) | EWS Units | 270 | 155 | 287 | - | (3.) | No. of blocks | 7 | 1 | 8 | - | (4.) | Ground Coverage (m2) | 5504.02 | 586.84 | 6090.86 | | (5.) | FAR (Proposed in m2) | 57871.29 | 28939.93 | 86811.215 | - | (6.) | FAR ( Proposed for EWS in m2) | 8382.05 | 4639.632 | 13021.682 | | (7.) | Built-up Area (m2) | 100352.02 | 72503.59 | 172855.618 | - | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 13 Feb 2017 | (iv)Valid Upto | 30 Sep 2020 | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 85 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1.74 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.85 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.065 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | 0 | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | .. | 0 | Others | NA | - | Others | NA | 0 | MoU | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2019 To 31 Dec 2019 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 320 | 193.6 | 305.6 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 124.1 | 85.6 | 118.2 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 20.8 | 9.2 | 19.8 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 67.5 | 27.0 | 57.9 | 80 | (5.) | Others | CO | Mili Gram per Meter Cube | 2.0 | 0.8 | 1.7 | 2 | |
14.2. No. of Ground Water monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.5 | 7.1 | 6.5 | 8.5 | (2.) | Heavy Metals | | Selenium | mg/l | | 0.01 | 0.01 | 0.01 | 0.01 | (3.) | Total Hardness | | | mg/l | | 460 | 180 | 200 | 200 | (4.) | TSS | | | mg/l | | 12.0 | 8.4 | 0 | 0 | (5.) | Fluoride | | | mg/l | | 1.0 | 0.2 | 1.0 | 1.0 | (6.) | Chlorides | | | mg/l | | 350.0 | 80.0 | 250.0 | 250.0 | (7.) | TDS | | | mg/l | | 1204 | 219.3 | 500 | 500 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.2 | 6.8 | E | (2.) | BOD | | mg/l | | 24 | 12 | E | (3.) | Others | TSS | mg/l | | 110 | 14.8 | E | (4.) | DO | | mg/l | | 4.2 | 3.2 | E | (5.) | COD | | mg/l | | 176 | 32 | E | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 63.6 | 54.8 | 65 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 58.9 | 45.1 | 55 | |
14.5. No. of Soil Sample Monitored locations : 7 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | Electric Conductivity | Millisiemens per Centimetre | | 412.6 | 280.3 | (2.) | K(Potassium) | Milligram per Kilogram | | 61.2 | 32.6 | (3.) | N(Nitrogen) | Milligram per Kilogram | | 75.6 | 61.6 | (4.) | pH | | | 8.1 | 7.6 | (5.) | P(Phosphorus) | Milligram per Kilogram | | 15.2 | 12.2 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 16.32 To 2.23 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.32 To 17.1 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | DJB Supply | 306 | 1.0 | Copy of Permission Letter | Pipeline | | Others | pipeline | bill no. 12370310962 | 20 Aug 2020 | 310 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic,flushing,cooling,pool,filterbackwash | 382 | 460 | STP | Reuse within the Plant & Recycling,Green Belt Renewal Plant,Others | losses of 39 KLD | 178 | 204 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 382 | (b)Total Discharged Water (Kilolitre per Day) | 204 | (c)Total Reused Water (Kilolitre per Day) | 178 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Bio degradable waste | Municipal Solid Waste | | 313 | Tons | 0.9 | Road | | Others | Organic waste converter | (2.) | Plastic waste | Plastic Waste | | 104 | Tons | 1.0 | Road | | Authorized Recyclers | | (3.) | Non-biodegradable waste | Municipal Solid Waste | | 105 | Tons | 1.0 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 16.4 | 0.9 | 0.08 | 16.49 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 265.1 | 0.9 | 0.02 | 265.13 | 100 | (3.) | PM2.5 | | Microgram per Meter Cube | 100.1 | 0.9 | 0.01 | 100.12 | 60 | (4.) | NOx | | Microgram per Meter Cube | 48.9 | 0.9 | 0.02 | 48.93 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG set of 3(1 standby)x1500 kVA & 1x500 kVA | Low Sulphur diesel | 30 | 0.3 | Others | PM2.5 | 0.05 | (2.) | DG set of 3(1 standby)x1500 kVA & 1x500 kVA | Low Sulphur Diesel | 30 | 0.3 | SO2 | | 0.18 | (3.) | DG of 3(1 standby)x1500 kVA & 1x500 kVA | Low Sulphur diesel | 30 | 0.3 | NOx | | 0.28 | (4.) | DG set of capacity 3 (1standby)x1500 kVA & 500 kVA | Low Sulphur Diesel | 30 | 0.3 | PM10 | | 0.05 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2568.6 | (b)Source | Tata Power Delhi Distribution Limited | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 3x (1 standby)1500 kVA & 1x500 kVA | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 1.83727 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 1.83727 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 5085.64 | (b)Waste/Barren Land (ha.) | 84.30 | (c)Grazing/ Community Land (ha.) | 220.09 | (d)Surface Water Bodies (ha.) | 1026.28 | (e)Settlements (ha.) | 24228.53 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 1219.3 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : - | 0 | Total (ha.) | 31864.1400 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | plot area | 1.83727 | plot area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Wazirpur | 1.42 | SW direction from the project site | (2.) | WLS | None | 0 | NA | (3.) | Wildlife Corridors | None | 0 | NA | (4.) | ESZs | None | 0 | NA | (5.) | NPA | None | 0 | NA | (6.) | ESAs | None | 0 | NA | (7.) | Corridors | None | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | Indian Air Force Head Quarter | 10.88 | SSE direction from the project site | (2.) | Forest | | Northern Ridge Reserve Forest | 4.07 | SEE direction from the project site | (3.) | Archaeological Sites | | Salimgarh Fort | 8.1 | SEE direction from the project site | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 1.83 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Pavo cristatus | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Pond near Model Town | (ii)Direction of Water Bodies in Buffer Area | North East | (iii)Distance of Water Bodies in Buffer Area | 1.36 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 100 | (c)Temporary Employment- During Construction | 300 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 365 | (f)Total Manpower | 400 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 5472.18 | 776.57 | 6248.75 | (2.) | Percentage of Total Project Area | 29.78 | 4.23 | 34.010000000000005 | (3.) | No. of Plants | 579 | 30 | 609 | (4.) | Funds Allocated | 290 | 10 | 300 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Employment will be generated | (2.) | Financial | Revenue will be generated | (3.) | Environmental | Plantation of trees all around the project periphery including avenue plantation will be carried out | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-2 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 235 | (b)Total No. of Flats to be Build | 775 | (c)No. of Buildings | 8 | (d)Total plot area (sqm) | 18372.744 | (e)Total built up area (sqm) | 172855.618 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 0 | (b)Capacity | 0 | (c)No. of Recharge Pits | 3 | (d)Capacity | 168 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 1804 | |
|
5. | Energy Saving Measures: | (a)Source/Mode | LED/Solar | (b)Percentage | 1 | (c)Quantity | 25.686 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | Rev 04, 10th November. 2020 at S.No-120.) | (ii)Name of the EIA Consultant | Perfact Enviro Solutions Pvt. Ltd. | (iii)Address | 5th Floor, NN Mall, Sector 3, Rohini, New Delhi, 110085 | (iv)Mobile No. | 9818362330 | (v)Landline No. | 0114928136 | (vi)Email Id | info@perfactgroup.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-2 | (ix)Validity of Accreditation | 03 Dec 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Upon examination of your application, following points needs to be address with relevant documents;
(i) Please submit with valid accreditation certificate of EIA consultant as being found to be expired on 08.09.2020.
(ii) Entries under s.no. 9 (c) of form-2 in the field titled existing configuration may be rectified by providing the data w.r.t. actual construction that has been completed as on date.
(iii) Vetting of non compliance/partially compliance as given in report of Regional Office dated 20.01.2020 against the Action Taken Report of project proponent is required for disposal of show cause notice for further consideration of application. | 11 Sep 2020 | 2. | NA | The correction have been made as per the instruction received | 11 Sep 2020 | 3. | NA | Consideration of application is subject to compliance of TOR’s condition no.15, which was issued on 06.08.2020. Please resubmit application upon fulfillment of the condition. | 05 Oct 2020 | 4. | NA | The correction have been made as per the instruction received | 26 Nov 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | SatishPal Singh | Designation | VicePresident | Name of Company (Applicant Name should not be given here) | NEGOLICE INDIA LIMITED | Address | E-34, 2nd Floor, Connaught Circus, New Delhi |
|