|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M Chemicals | (b)Name of the Company / Organisation | M. CHEMICALS | (c)Registered Address | Plot No. 807, Sachin GIDC, Surat, Gujarat,,Surat,Gujarat-394221 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Kayyum Khan | (b)Designation (Owner/ Partner/ CEO) | GM | (c)Address | Plot No. 807, Sachin GIDC, Surat, Gujarat,,Chorasi,Surat,Gujarat-934221 | (d)Pin code | 934221 | (e)E-mail | mchemical123@gmail.com | (f)STD Code. | 261(f)Telephone No. | 2786130 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/170059/2020 | (d)Master Proposal Number(Single Window) | SW/170051/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 3 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot No. 807, Near Kheteshwar Hotel, Sachin GIDC, | (b)Pincode | 394230 | (c)Bounded Latitudes (North) | | From | | Degree | 21 | Minutes | | Second | | From | | Degree | 21 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72 | Minutes | | Second | | From | | Degree | 72 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43M16 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 13 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.8 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | IA-J-11011/137/2020-IA-II(I) | (c)Date of Issue of TOR | 24 Jul 2020 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 29 Aug 2020 | (c)Date of Issue of EC | 01 Dec 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Project site is located in Notified Industrial Area (Sachin GIDC) | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | SPCB | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | | (iii)Letter No. | GPCB/CCA-SRT-1104(2)/ID-33282 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jun 26 2020 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 15. Bronners Acid OR | 0 | 40 | 40 | Others | MT/Month | Road,Rail | | (2.) | 18. Sulpho C Acid OR | 0 | 40 | 40 | Others | MT/Month | Road,Rail | | (3.) | 3. R-Salt OR | 0 | 40 | 40 | Others | MT/Month | Road,Rail | | (4.) | 6. Aniline 2,5 DSA OR | 0 | 40 | 40 | Others | MT/Month | Road,Rail | | (5.) | 17. Schaffer's Acid OR | 0 | 40 | 40 | Others | MT/Month | Road,Rail | | (6.) | 2. R-Salt OR | 0 | 40 | 40 | Others | MT/Month | Road,Rail | | (7.) | 5. Aniline 2,4 DSA OR | 0 | 40 | 40 | Others | MT/Month | Road,Rail | | (8.) | 7. Para Nitro Chloro Benzoyl Sulphonic Acid OR | 0 | 40 | 40 | Others | MT/Month | Road,Rail | | (9.) | 8. Para Cresidine Ortho Sulphonic Acid OR | 0 | 40 | 40 | Others | MT/Month | Road,Rail | | (10.) | 4. Amido G Acid OR | 0 | 40 | 40 | Others | MT/Month | Road,Rail | | (11.) | 9. Sulfo Gamma Acid OR | 0 | 40 | 40 | Others | MT/Month | Road,Rail | | (12.) | 10. 1,6 Cleave Acid OR | 0 | 40 | 40 | Others | MT/Month | Road,Rail | | (13.) | 11. 4 Sulpho Anthranilic Acid OR | 0 | 40 | 40 | Others | MT/Month | Road,Rail | | (14.) | 12. 4 Sulpho Hydrazone OR | 0 | 40 | 40 | Others | MT/Month | Road,Rail | | (15.) | 14. Benzedine 2,2 Disulphonic Acid OR | 0 | 40 | 40 | Others | MT/Month | Road,Rail | | (16.) | 1. 6 Nitro, 1-Diazo, 2-Napthol, 4-Sulphonic Acid | 10 | 0 | 10 | Others | MT/Month | Road,Rail | | (17.) | 13. 6 Acetyl OAPSA OR | 0 | 40 | 40 | Others | MT/Month | Road,Rail | | (18.) | 16. EMAMSA OR | 0 | 40 | 40 | Others | MT/Month | Road,Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Synthetic Organic Chemicals | 10 | 40 | 50 | Dyes & Dyes Intermediates | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 26 Jun 2020 | (iv)Valid Upto | 31 Mar 2026 | (v)File No. | GPCB/CCA-SRT-1104(2)/ID-33282 | (vi)Application No. | 175956 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 2.5 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.52 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.1025 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.803 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 40 | (b)Existing quantity of raw material/fuel | 0 | (c)Total quantity of raw material/fuel | 40 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | B – Napthol | 352.8 | Tons per Annum | | Payal Chemicals | Road,Rail | | 25 | Open Market | | Copy of Linkage | (2.) | Caustic lye | 470.4 | Tons per Annum | | SBN Trading Co. | Road,Rail | | 35 | Open Market | | Copy of Linkage | (3.) | Sulphuric Acid (35%) | 720 | Tons per Annum | | SBN Trading Co. | Road | | 35 | Open Market | | Copy of Linkage | (4.) | Sodium bisulphite | 8 | Tons per Annum | | Payal Chemicals | Road | | 25 | Open Market | | Copy of Linkage | (5.) | Oleum-23% | 444 | Tons per Annum | | SBN Trading Co. | Road | | 35 | Open Market | | Copy of Linkage | (6.) | Oleum 65 % | 408 | Tons per Annum | | SBN Trading Co. | Road | | 35 | Open Market | | Copy of Linkage | (7.) | Potassium Chloride | 336 | Tons per Annum | | Texaco Pharmaceutical | Road | | 75 | Open Market | | Copy of Linkage | (8.) | G Salt | 384 | Tons per Annum | | Captive | Others | captive | 0 | Captive | | Copy of Linkage | (9.) | Soda Ash | 216 | Tons per Annum | | Sindhuja Traders | Road | | 65 | Open Market | | Copy of Linkage | (10.) | Nitric Acid | 163.2 | Tons per Annum | | Niken Chemicals | Road | | 55 | Open Market | | Copy of Linkage | (11.) | Sodium Sulphate | 192 | Tons per Annum | | Super Chem | Road | | 32 | Open Market | | Copy of Linkage | (12.) | Metanilic acid | 384 | Tons per Annum | | Apurva Chemicals | Road | | 35 | Open Market | | Copy of Linkage | (13.) | Para Creidine | 240 | Tons per Annum | | Supreet Chemicals | Road | | 10 | Open Market | | Copy of Linkage | (14.) | HCl | 433.7 | Tons per Annum | | SBN Trading Co. | Road | | 35 | Open Market | | Copy of Linkage | (15.) | 4 Sulfo Anthralinic Acid | 345 | Tons per Annum | | Payal Chemicals | Road | | 25 | Open Market | | Copy of Linkage | (16.) | Sodium Hydroxide | 63 | Tons per Annum | | Niken Chemicals | Road | | 55 | Open Market | | Copy of Linkage | (17.) | OAP | 191 | Tons per Annum | | Mahavir Chem Tech | Road | | 65 | Open Market | | Copy of Linkage | (18.) | EBA | 434.9 | Tons per Annum | | Payal Chemicals | Road | | 25 | Open Market | | Copy of Linkage | (19.) | Activated Carbon | 9.6 | Tons per Annum | | Vip Chem | Road | | 75 | Open Market | | Copy of Linkage | (20.) | Liq. Ammonia | 288 | Tons per Annum | | Texchem | Road | | 75 | Open Market | | Copy of Linkage | (21.) | CO2 gas | 308.5 | Tons per Annum | | Payal Chemicals | Road | | 25 | Open Market | | Copy of Linkage | (22.) | Dilute Sulfuric Acid | 192 | Tons per Annum | | SBN Trading Co. | Road | | 35 | Open Market | | Copy of Linkage | (23.) | Neta Napthanol | 388.8 | Tons per Annum | | Payal Chemicals | Road | | 25 | Open Market | | Copy of Linkage | (24.) | ONT | 230.4 | Tons per Annum | | Mahavir Chem Tech | Road | | 65 | Open Market | | Copy of Linkage | (25.) | Sodium bisulphite | 72 | Tons per Annum | | Mahavir Chem Tech | Road | | 65 | Open Market | | Copy of Linkage | (26.) | Sodium Sulfite | 162.2 | Tons per Annum | | Niken Chemicals | Road | | 55 | Open Market | | Copy of Linkage | (27.) | KCL Salt | 408 | Tons per Annum | | Texchem | Road | | 75 | Open Market | | Copy of Linkage | (28.) | Ammonia gas | 52.8 | Tons per Annum | | Texchem | Road | | 75 | Open Market | | Copy of Linkage | (29.) | Naphthalene | 275.5 | Tons per Annum | | Payal Chemicals | Road | | 25 | Open Market | | Copy of Linkage | (30.) | Lime stone | 48 | Tons per Annum | | Texchem | Road | | 75 | Open Market | | Copy of Linkage | (31.) | Salt | 84 | Tons per Annum | | Texchem | Road | | 75 | Open Market | | Copy of Linkage | (32.) | Sulfanilic Acid | 312 | Tons per Annum | | Niken Chemicals | Road | | 55 | Open Market | | Copy of Linkage | (33.) | Sodium Nitrate | 263.3 | Tons per Annum | | New Super Chem | Road | | 2 | Open Market | | Copy of Linkage | (34.) | Sulfuric Acid | 624.4 | Tons per Annum | | SBN Trading Co. | Road | | 35 | Open Market | | Copy of Linkage | (35.) | Benzaldehyde | 166.7 | Tons per Annum | | Carron Industries | Road | | 3 | Open Market | | Copy of Linkage | (36.) | ONCB | 240 | Tons per Annum | | Mahavir Chem Tech | Road | | 65 | Open Market | | Copy of Linkage | (37.) | Iron | 50.9 | Tons per Annum | | Texchem | Road | | 75 | Open Market | | Copy of Linkage | (38.) | C Acid | 395 | Tons per Annum | | Arcata Trade Link | Road | | 35 | Open Market | | Copy of Linkage | (39.) | Benzidine | 268.3 | Tons per Annum | | Payal Chemicals | Road | | 25 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2019 To 31 May 2019 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 58.2 | 20.1 | 51.01 | 80 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 98.1 | 20.7 | 62.45 | 60 | (3.) | Others | CO | Mili Gram per Meter Cube | 0.91 | 0.19 | 0.88 | 2 | (4.) | PM10 | | Micro Gram per Meter Cube | 120.7 | 40.4 | 115.06 | 100 | (5.) | SO2 | | Micro Gram per Meter Cube | 56.1 | 11.3 | 49.11 | 80 | |
14.2. No. of Ground Water monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Fluoride | | | mg/l | | 0 | 0 | 1 | 1.5 | (2.) | Others | Colour | | Others | Hazen | 41.7 | 12.8 | 5 | 15 | (3.) | Chlorides | | | mg/l | | 664 | 50 | 250 | 1000 | (4.) | TDS | | | mg/l | | 2068 | 553 | 500 | 2000 | (5.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (6.) | pH | | | NA | | 8.18 | 7.44 | 6.5 | 8.5 | (7.) | Total Hardness | | | mg/l | | 910 | 110 | 200 | 600 | (8.) | Heavy Metals | | Zinc | mg/l | | 0 | 0 | 5 | 15 | |
14.3. No. of Surface Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 181 | 6.1 | A | (2.) | Others | Colour | Others | Hazen | 414 | 85 | A | (3.) | COD | | mg/l | | 570 | 20.1 | A | (4.) | pH | | NA | | 8.47 | 7.31 | A | (5.) | DO | | mg/l | | 3.6 | 1.8 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 54.1 | 43.1 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 42.2 | 31.5 | 45 | |
14.5. No. of Soil Sample Monitored locations : 7 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.72 | 8.11 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 1.9 | 0.37 | (3.) | N(Nitrogen) | Milliequivalents per 100 Gram | | 0 | 0 | (4.) | P(Phosphorus) | Milliequivalents per 100 Gram | | 0 | 0 | (5.) | K(Potassium) | Milligram per Kilogram | | 281 | 122 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 4 To 6 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 6 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Notified Area Authority (Sachin GIDC) | 23.5 | 1 | Copy of Permission Letter | Pipeline | | Others | GIDC Pipelines | 2020/Water Application/01 | 28 Aug 2020 | 23.5 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial Wastewater-1 | 5 | 5 | Discharge to CETP after Primary Treatment | Others | Discharged to CETP | 0 | 5 | (2.) | Industrial Wastewater-2 | 5.5 | 6 | Send to MEE plant followed by bilogical and RO plant | Others | reused within plant premises | 5.5 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 10.5 | (b)Total Discharged Water (Kilolitre per Day) | 5 | (c)Total Reused Water (Kilolitre per Day) | 5.5 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.17 | Kilolitre | 1 | Road | | Authorized Recyclers | | (2.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 23.5 | Tons | 75 | Road | | Sanitary Landfills | | (3.) | Discarded Barrels/Containers | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2 | Tons | 1 | Road | | Authorized Recyclers | | (4.) | Spent carbon | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 16.8 | Tons | 75 | Road | | Co-Processing | | (5.) | MEE Salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 35 | Tons | 75 | Road | | Sanitary Landfills | | (6.) | Spent Acid | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 192 | Tons | 10 | Road | | Others | Authorized end User | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 99.7 | 0.2 | 0.11 | 99.82 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 40.8 | 0.10 | 0.3 | 41.1 | 80 | (3.) | NOx | | Microgram per Meter Cube | 35.9 | 0.2 | 0.13 | 36.04 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 52.2 | 0.2 | 0.05 | 52.26 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG Set (75 KVA) | LDO | 11 | 0.1 | Others | PM, SOx, NOx | 0.1 | (2.) | Reaction Vessel | - | 12 | 0.15 | Others | SOx, NOx | 0.3 | (3.) | Stand By Boiler (0.5 MT/Hr) | Natural Gas | 15 | 0.2 | Others | PM, SOx, NOx | 0.1 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 200 | (b)Source | Dakshin Gujarat Vij Company Limited | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 75 KVA | (e)Stack Height (in m) | 11 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0.165 | Total Land (ha.) | 0.165 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 10180.44 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 3068.31 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 1581 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : open scrub, railways, plantation etc. | 16281.51 | Total (ha.) | 31111.2600 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0.034 | Manufacturing Plan | (2.) | Green belt | | 0.0186 | Green Belt Area | (3.) | Others | raw material st, finished storage, ETP, etc. | 0.1124 | Admin, ETP Security, raw material, haz. etc | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Sachin GIDC | 0 | Project site is located in CP Area | (2.) | NPA | No NPA area | 0 | No NPA in study area | (3.) | WLS | No WLS area | 0 | No WLS in study area | (4.) | ESAs | No ESAs Area | 0 | No ESAs in study area | (5.) | ESZs | No ESZs area | 0 | No ESZs in study area | (6.) | Corridors | No corridor | 0 | No corridors in study area | (7.) | Wildlife Corridors | No wildlife corridors | 0 | No wild life corridors in study area | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | No archaeological sites | 0 | No archaeological sites in study area | (2.) | Defence Installations | | no defense installation | 0 | no defense installation in study area | (3.) | Forest | | No forest area | 0 | No forest area in study area | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.16 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Land possession documents are available | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | | (b)No. of Households | | (c)No. of PDFs (Project Displaced Families) | | (d)No. of PAFs (Project Affected Families) | | (e)Funds Allocated for R&R(in INR) (in Lacs) | | (f)Status of R&R | NA | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Mindhola River | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 5.1 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 30 | (c)Temporary Employment- During Construction | 10 | (d)Temporary Employment- During Operation | 10 | (e)No. of working days | 25 | (f)Total Manpower | 50 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 186 | 680 | 866 | (2.) | Percentage of Total Project Area | 11.2 | 41.2 | 52.400000000000006 | (3.) | No. of Plants | 20 | 100 | 120 | (4.) | Funds Allocated | 0 | 17 | 17 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Proposed expansion project will generate employments to the local areas/villages. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Industrial Projects - 3 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1922/RA 0122 | (ii)Name of the EIA Consultant | ENPRO Enviro Tech and Engineers Pvt. Ltd. | (iii)Address | 306, Royal Park, Near Deepa Complex, Adajan Road, Surat - 395 009, Gujarat, INDIA | (iv)Mobile No. | 8160483760 | (v)Landline No. | 0261278613 | (vi)Email Id | enpro.eia@enpro.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 3 | (ix)Validity of Accreditation | 12 Jan 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Kayyum Khan | Designation | GM | Name of Company (Applicant Name should not be given here) | M. CHEMICALS | Address | Plot No. 807, Sachin GIDC, Surat, Gujarat |
|