Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M Chemicals
(b)Name of the Company / Organisation M. CHEMICALS
(c)Registered Address Plot No. 807, Sachin GIDC, Surat, Gujarat,,Surat,Gujarat-394221
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Kayyum Khan
(b)Designation (Owner/ Partner/ CEO) GM
(c)Address Plot No. 807, Sachin GIDC, Surat, Gujarat,,Chorasi,Surat,Gujarat-934221
(d)Pin code 934221
(e)E-mail mchemical123@gmail.com
(f)STD Code. 261(f)Telephone No. 2786130
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/170059/2020
(d)Master Proposal Number(Single Window) SW/170051/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 807, Near Kheteshwar Hotel, Sachin GIDC,
(b)Pincode 394230
(c)Bounded Latitudes (North)
From
Degree 21
Minutes
Second
From
Degree 21
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72
Minutes
Second
From
Degree 72
Minutes
Second
(e)Survey of India Topo Sheet No. F43M16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 13
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.8
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number IA-J-11011/137/2020-IA-II(I)
(c)Date of Issue of TOR 24 Jul 2020
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 29 Aug 2020
(c)Date of Issue of EC 01 Dec 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project site is located in Notified Industrial Area (Sachin GIDC)
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. GPCB/CCA-SRT-1104(2)/ID-33282
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 26 2020 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)15. Bronners Acid OR04040OthersMT/MonthRoad,Rail
(2.)18. Sulpho C Acid OR04040OthersMT/MonthRoad,Rail
(3.)3. R-Salt OR04040OthersMT/MonthRoad,Rail
(4.)6. Aniline 2,5 DSA OR04040OthersMT/MonthRoad,Rail
(5.)17. Schaffer's Acid OR04040OthersMT/MonthRoad,Rail
(6.)2. R-Salt OR04040OthersMT/MonthRoad,Rail
(7.)5. Aniline 2,4 DSA OR04040OthersMT/MonthRoad,Rail
(8.)7. Para Nitro Chloro Benzoyl Sulphonic Acid OR04040OthersMT/MonthRoad,Rail
(9.)8. Para Cresidine Ortho Sulphonic Acid OR04040OthersMT/MonthRoad,Rail
(10.)4. Amido G Acid OR04040OthersMT/MonthRoad,Rail
(11.)9. Sulfo Gamma Acid OR04040OthersMT/MonthRoad,Rail
(12.)10. 1,6 Cleave Acid OR04040OthersMT/MonthRoad,Rail
(13.)11. 4 Sulpho Anthranilic Acid OR04040OthersMT/MonthRoad,Rail
(14.)12. 4 Sulpho Hydrazone OR04040OthersMT/MonthRoad,Rail
(15.)14. Benzedine 2,2 Disulphonic Acid OR04040OthersMT/MonthRoad,Rail
(16.)1. 6 Nitro, 1-Diazo, 2-Napthol, 4-Sulphonic Acid10010OthersMT/MonthRoad,Rail
(17.)13. 6 Acetyl OAPSA OR04040OthersMT/MonthRoad,Rail
(18.)16. EMAMSA OR04040OthersMT/MonthRoad,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Synthetic Organic Chemicals104050Dyes & Dyes Intermediates
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 26 Jun 2020
(iv)Valid Upto 31 Mar 2026
(v)File No. GPCB/CCA-SRT-1104(2)/ID-33282
(vi)Application No. 175956
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2.5
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.52
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.1025
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.803
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 40
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 40
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)B – Napthol352.8Tons per AnnumPayal ChemicalsRoad,Rail25 Open MarketCopy of Linkage
(2.)Caustic lye470.4Tons per AnnumSBN Trading Co.Road,Rail35 Open MarketCopy of Linkage
(3.)Sulphuric Acid (35%)720Tons per AnnumSBN Trading Co.Road35 Open MarketCopy of Linkage
(4.)Sodium bisulphite8Tons per AnnumPayal ChemicalsRoad25 Open MarketCopy of Linkage
(5.)Oleum-23%444Tons per AnnumSBN Trading Co.Road35 Open MarketCopy of Linkage
(6.)Oleum 65 %408Tons per AnnumSBN Trading Co.Road35 Open MarketCopy of Linkage
(7.)Potassium Chloride336Tons per AnnumTexaco PharmaceuticalRoad75 Open MarketCopy of Linkage
(8.)G Salt384Tons per AnnumCaptiveOtherscaptive0 CaptiveCopy of Linkage
(9.)Soda Ash216Tons per AnnumSindhuja TradersRoad65 Open MarketCopy of Linkage
(10.)Nitric Acid163.2Tons per AnnumNiken ChemicalsRoad55 Open MarketCopy of Linkage
(11.)Sodium Sulphate192Tons per AnnumSuper ChemRoad32 Open MarketCopy of Linkage
(12.)Metanilic acid384Tons per AnnumApurva ChemicalsRoad35 Open MarketCopy of Linkage
(13.)Para Creidine240Tons per AnnumSupreet ChemicalsRoad10 Open MarketCopy of Linkage
(14.)HCl433.7Tons per AnnumSBN Trading Co.Road35 Open MarketCopy of Linkage
(15.)4 Sulfo Anthralinic Acid345Tons per AnnumPayal ChemicalsRoad25 Open MarketCopy of Linkage
(16.)Sodium Hydroxide63Tons per AnnumNiken ChemicalsRoad55 Open MarketCopy of Linkage
(17.)OAP191Tons per AnnumMahavir Chem TechRoad65 Open MarketCopy of Linkage
(18.)EBA434.9Tons per AnnumPayal ChemicalsRoad25 Open MarketCopy of Linkage
(19.)Activated Carbon9.6Tons per AnnumVip ChemRoad75 Open MarketCopy of Linkage
(20.)Liq. Ammonia288Tons per AnnumTexchemRoad75 Open MarketCopy of Linkage
(21.)CO2 gas308.5Tons per AnnumPayal ChemicalsRoad25 Open MarketCopy of Linkage
(22.)Dilute Sulfuric Acid192Tons per AnnumSBN Trading Co.Road35 Open MarketCopy of Linkage
(23.)Neta Napthanol388.8Tons per AnnumPayal ChemicalsRoad25 Open MarketCopy of Linkage
(24.)ONT230.4Tons per AnnumMahavir Chem TechRoad65 Open MarketCopy of Linkage
(25.)Sodium bisulphite72Tons per AnnumMahavir Chem TechRoad65 Open MarketCopy of Linkage
(26.)Sodium Sulfite162.2Tons per AnnumNiken ChemicalsRoad55 Open MarketCopy of Linkage
(27.)KCL Salt408Tons per AnnumTexchemRoad75 Open MarketCopy of Linkage
(28.)Ammonia gas52.8Tons per AnnumTexchemRoad75 Open MarketCopy of Linkage
(29.)Naphthalene275.5Tons per AnnumPayal ChemicalsRoad25 Open MarketCopy of Linkage
(30.)Lime stone48Tons per AnnumTexchemRoad75 Open MarketCopy of Linkage
(31.)Salt84Tons per AnnumTexchemRoad75 Open MarketCopy of Linkage
(32.)Sulfanilic Acid312Tons per AnnumNiken ChemicalsRoad55 Open MarketCopy of Linkage
(33.)Sodium Nitrate263.3Tons per AnnumNew Super ChemRoad2 Open MarketCopy of Linkage
(34.)Sulfuric Acid624.4Tons per AnnumSBN Trading Co.Road35 Open MarketCopy of Linkage
(35.)Benzaldehyde166.7Tons per AnnumCarron IndustriesRoad3 Open MarketCopy of Linkage
(36.)ONCB240Tons per AnnumMahavir Chem TechRoad65 Open MarketCopy of Linkage
(37.)Iron50.9Tons per AnnumTexchemRoad75 Open MarketCopy of Linkage
(38.)C Acid395Tons per AnnumArcata Trade LinkRoad35 Open MarketCopy of Linkage
(39.)Benzidine268.3Tons per AnnumPayal ChemicalsRoad25 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube58.220.151.0180
(2.)PM2.5Micro Gram per Meter Cube98.120.762.4560
(3.)OthersCOMili Gram per Meter Cube0.910.190.882
(4.)PM10Micro Gram per Meter Cube120.740.4115.06100
(5.)SO2Micro Gram per Meter Cube56.111.349.1180
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l0011.5
(2.)OthersColourOthersHazen41.712.8515
(3.)Chloridesmg/l664502501000
(4.)TDSmg/l20685535002000
(5.)TSSmg/l0000
(6.)pHNA8.187.446.58.5
(7.)Total Hardnessmg/l910110200600
(8.)Heavy MetalsZincmg/l00515
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l1816.1A
(2.)OthersColourOthersHazen41485A
(3.)CODmg/l57020.1A
(4.)pHNA8.477.31A
(5.)DOmg/l3.61.8A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.143.155
(2.)Leq(Night)A-weighted decibels(dB(A))42.231.545
    14.5.     No. of Soil Sample Monitored locations : 7
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.728.11
(2.)Electric ConductivityMillisiemens per Centimetre1.90.37
(3.)N(Nitrogen)Milliequivalents per 100 Gram00
(4.)P(Phosphorus)Milliequivalents per 100 Gram00
(5.)K(Potassium)Milligram per Kilogram281122
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 4 To 6
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 6
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersNotified Area Authority (Sachin GIDC)23.51Copy of Permission LetterPipelineOthersGIDC Pipelines2020/Water Application/0128 Aug 202023.5
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial Wastewater-155Discharge to CETP after Primary TreatmentOthersDischarged to CETP05
(2.)Industrial Wastewater-25.56Send to MEE plant followed by bilogical and RO plantOthersreused within plant premises5.50
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 10.5
(b)Total Discharged Water (Kilolitre per Day) 5
(c)Total Reused Water (Kilolitre per Day) 5.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.17Kilolitre1RoadAuthorized Recyclers
(2.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)23.5Tons75RoadSanitary Landfills
(3.)Discarded Barrels/ContainersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2Tons1RoadAuthorized Recyclers
(4.)Spent carbonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)16.8Tons75RoadCo-Processing
(5.)MEE SaltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)35Tons75RoadSanitary Landfills
(6.)Spent AcidHazardous Waste (as per Hazardous and Other Waste Management rules 2016)192Tons10RoadOthersAuthorized end User
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube99.70.20.1199.82100
(2.)SO2Microgram per Meter Cube40.80.100.341.180
(3.)NOxMicrogram per Meter Cube35.90.20.1336.0480
(4.)PM2.5Microgram per Meter Cube52.20.20.0552.2660
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Set (75 KVA)LDO110.1OthersPM, SOx, NOx0.1
(2.)Reaction Vessel-120.15OthersSOx, NOx0.3
(3.)Stand By Boiler (0.5 MT/Hr)Natural Gas150.2OthersPM, SOx, NOx0.1
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 200
(b)Source Dakshin Gujarat Vij Company Limited
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 75 KVA
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0.165
    Total Land (ha.) 0.165
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 10180.44
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 3068.31
(e)Settlements (ha.) 0
(f)Industrial (ha.) 1581
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : open scrub, railways, plantation etc. 16281.51
    Total (ha.) 31111.2600
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.034Manufacturing Plan
(2.)Green belt0.0186Green Belt Area
(3.)Othersraw material st, finished storage, ETP, etc.0.1124Admin, ETP Security, raw material, haz. etc
Total (ha.) 0.165
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaSachin GIDC0Project site is located in CP Area
(2.)NPANo NPA area0No NPA in study area
(3.)WLSNo WLS area0No WLS in study area
(4.)ESAsNo ESAs Area0No ESAs in study area
(5.)ESZsNo ESZs area0No ESZs in study area
(6.)CorridorsNo corridor0No corridors in study area
(7.)Wildlife CorridorsNo wildlife corridors0No wild life corridors in study area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNo archaeological sites0No archaeological sites in study area
(2.)Defence Installationsno defense installation0no defense installation in study area
(3.)ForestNo forest area0No forest area in study area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.16
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Land possession documents are available
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Mindhola River
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 5.1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 30
(c)Temporary Employment- During Construction 10
(d)Temporary Employment- During Operation 10
(e)No. of working days 25
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt186680866
(2.)Percentage of Total Project Area11.241.252.400000000000006
(3.)No. of Plants20100120
(4.)Funds Allocated01717
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialProposed expansion project will generate employments to the local areas/villages.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0122
(ii)Name of the EIA Consultant ENPRO Enviro Tech and Engineers Pvt. Ltd.
(iii)Address 306, Royal Park, Near Deepa Complex, Adajan Road, Surat - 395 009, Gujarat, INDIA
(iv)Mobile No. 8160483760
(v)Landline No. 0261278613
(vi)Email Id enpro.eia@enpro.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 12 Jan 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKayyum Khan
DesignationGM
Name of Company (Applicant Name should not be given here)M. CHEMICALS
AddressPlot No. 807, Sachin GIDC, Surat, Gujarat
Print