Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Recreational Park Bharat Vandana Park
(b)Name of the Company / Organisation Delhi Development authority
(c)Registered Address vikas sadan, barapullah road,new delhi,South West,Delhi-110023
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant poonam dewan
(b)Designation (Owner/ Partner/ CEO) AC
(c)Address vikas sadan barapullah road,new delhi,Vasant Vihar,South West,Delhi-110023
(d)Pin code 110023
(e)E-mail bharatvandana01@gmail.com
(f)STD Code. 120(f)Telephone No. 4352889
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(b) Townships and Area Development projects.
Minor Activity8(b) Townships and Area Development projects.
(b)Category B1
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/DL/NCP/168943/2020
(d)Master Proposal Number(Single Window) SW/168929/2020
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Sector-20 dwarka South West Delhi
(b)Pincode 110075
(c)Bounded Latitudes (North)
From
Degree 283435.84
Minutes
Second
From
Degree 28344.94
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 77313.15
Minutes
Second
From
Degree 77327.87
Minutes
Second
(e)Survey of India Topo Sheet No. 2SOI
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 257
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 21-5/2020-IA-III
(c)Date of Apply of TOR 01 Jan 2020
(d)Date of Issue of TOR / Standard ToR 19 Feb 2020
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Building construction project
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Landscape Area of the project3,97,307 sqmRecreational Park" Bharat Vandana Park"
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Built Up Area13310.5OtherssqmRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 530
(b) Funds Allocated for Environment Management (Capital) (in Crores) 5.66
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 5.3
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.062
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 100
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 100
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.).0Otherscum-Road1 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2019 To 10 Mar 2020
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube2583926.560
(2.)NOxMicro Gram per Meter Cube64.323.89.680
(3.)PM10Micro Gram per Meter Cube4286952.5100
(4.)SO2Micro Gram per Meter Cube23.48.26.380
(5.)OthersCOMili Gram per Meter Cube3.620.820.44.0
    14.2.     No. of Ground Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Heavy MetalsCoppermg/l0.010.010.051.5
(2.)TSSmg/l5204802000
(3.)OthersIronmg/l0.050.050.30
(4.)TDSmg/l2572125002000
(5.)pHOthers-7.626.488.50
(6.)Total Hardnessmg/l150126300600
(7.)Chloridesmg/l23192501000
(8.)Fluoridemg/l0.10.11.01.5
(9.)OthersNitratesmg/l2.82.2450
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHOthers-7.427.38E
(2.)BODmg/l22E
(3.)CODmg/l108E
(4.)DOmg/l7.77.5E
    14.4.     No. of Ambient Noise monitoring locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))6254.240
(2.)Leq(Day)A-weighted decibels(dB(A))8566.450
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.087.69
(2.)K(Potassium)Kilogram per hectare316256
(3.)N(Nitrogen)Kilogram per hectare426328
(4.)Electric ConductivityOthersdS/m0.430.28
(5.)P(Phosphorus)Kilogram per hectare24.318.6
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.4 To 53.17
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.69 To 54.02
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersDelhi Jal Board7805Copy of Permission LetterPipelineOthersDelhi Jal BoardDJB/SE(SDW)III/2018-19-9225 Jun 201950
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic waste water726800STPOthersTreatment, sotrage and disposal facility7260
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 726
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 726
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Municipal Solid WasteMunicipal Solid Waste2782Tons0RoadCo-Processing
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube124.010.212960
(2.)NOxMicrogram per Meter Cube44.810.0749.880
(3.)SO2Microgram per Meter Cube16.712.321.780
(4.)PM10Microgram per Meter Cube24510.07250100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Set 380kVADiesel60.33SO20.013
(2.)DG Set 380kVADiesel60.33PM100.0033
(3.)DG Set 380kVADiesel60.33PM100.00033
(4.)DG Set 380kVADiesel60.33NOx0.1
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2550
(b)Source BSES Rajdhani Power Limited
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) DG Set - 4*380 kVA
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 80.9371
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 80.9371
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 3685.72
(b)Waste/Barren Land (ha.) 2268.56
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 373.725
(e)Settlements (ha.) 18317.5
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Airport-1870.29Ha. Veg.- 4280.44Ha. Agri.Fallowlla 10293.74
    Total (ha.) 34939.2450
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt39.73Landscape Area
Total (ha.) 39.73
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNo0*
(2.)ESZsNo0*
(3.)CorridorsNo0*
(4.)Wildlife CorridorsNo0*
(5.)NPANo0*
(6.)Critically Polluted AreaSapwal2.21*
(7.)ESAsNo0*
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesTomb of Sultan Ghari8*
(2.)Defence InstallationsDelhi Gate10*
(3.)ForestRajokari RF9*
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 71.79
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired No
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Nazafgarh Drain
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 2.18
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 150
(d)Temporary Employment- During Operation 300
(e)No. of working days 6
(f)Total Manpower 600
32.
Green Belt in Ha:
(a)Total Area of Green Belt 39.73
(b)Percentage of Total Project Area 49.09
(c)No. of Plants to be Planted 10000
(d)Funds Allocated for Plantation 1.32
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialRecreational Park , Entertainment
(2.)EnvironmentalSTP RWH Greenbelt lakes Solar Panel,
(3.)FinancialBharat Vandana Park
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 15
(b)Total No. of Flats to be Build 4
(c)No. of Buildings 9
(d)Total plot area (sqm) 809371.28
(e)Total built up area (sqm) 13310.5
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 30
(d)Capacity 3500
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 2400
5.
Energy Saving Measures:
(a)Source/Mode Solar Power
(b)Percentage 10
(c)Quantity 225
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area No
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1518/IA0017
(ii)Name of the EIA Consultant M/s Amaltas Enviro Industrial Consultants
(iii)Address B-1/1244,Vasant Kunj, New Delhi-110070
(iv)Mobile No. 9810085736
(v)Landline No. 0120435288
(vi)Email Id mervyn.atmos@gmail.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 27 Dec 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NApl attach documents related to site location e.g. plot no., khasra no etc. which is not indicted in the form. 09 Sep 2020
2.NAThe correction have been made as per the instruction received 10 Sep 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicantpoonam dewan
DesignationAC
Name of Company (Applicant Name should not be given here)Delhi Development authority
Addressvikas sadan, barapullah road