1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Sugar Factory capacity from 7500 to 13,200 TCD, Distillery capacity from 45 to 145 KLPD (RS/ENA/Ethanol) and establishment of 24 MW Co-generation Power Plant at Yeshwantnagar, Tal. Karad, Dist. Satara by Sahyadri Sahakari Sakhar Karkhana Ltd
(b)Name of the Company / Organisation SAHYADRI SAHAKARI SAKHAR KARKHANA LTD
(c)Registered Address Yeshwantnagar, Taluka Karad, District Satara.,,Satara,Maharashtra-415115
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Abasaheb Jotiram Patil
(b)Designation (Owner/ Partner/ CEO) MD
(c)Address Sahyadri SSK Ltd, Yeshwantnagar, Taluka Karad, District Satara,,Karad,Satara,Maharashtra-415115
(d)Pin code 415115
(e)E-mail bssubbarao@yahoo.com
(f)STD Code. 2164(f)Telephone No. 661500
(g)Fax No. 02164661566
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
5(j) Sugar Industry
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/IND2/168892/2018
(d)Master Proposal Number(Single Window) SW/168891/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Yeshwantnagar-1 to 53, 54B, 55, 64 to 84, 86, 89 t
(b)Pincode 415115
(c)Bounded Latitudes (North)
From
Degree 17.3563
Minutes
Second
From
Degree 17.3685
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 74.1589
Minutes
Second
From
Degree 74.1708
Minutes
Second
(e)Survey of India Topo Sheet No. E43O3, E43O7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 600
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/114/2018-IA-II(I)
(b)Date of Apply of TOR 26 Mar 2018
(c)Date of Issue of TOR / Standard ToR 04 May 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :15 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :15 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :0
Sahyadri Sahakari Sakhar Karkhana Limited
State :Maharashtra
District :Satara
Tehsil :Karad
Village :Yeshwantnagar
130The people in the surrounding area are in favor of the expansion project as the industry is taking due care in maintaining the clean environment by adopting necessary pollution control measures. The mDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Sugarcane crushing capacity13200 TCDExpansion from 7500 TCD to 13200 TCD
(2.)Cogeneration Power24 MW
(3.)Distillery (RS/ENA/Ethanol)145 KLPDExpansion from 45 to 145 KLPD
(4.)TG Set5 MWConnected to 35 TPH Incinerator Boiler
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Distillery (RS/ENA/Ethanol)145Kilo Litre per DayRoad
(2.)Cogeneration Power24Mega Watt(MW)OthersGrids
(3.)Sugarcane Crushing Capacity13200Tons Crushed per DayRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 11 Nov 2019
(iv)Valid Upto 31 Jul 2020
(v)File No. 0000077742/CR-19110003777
(vi)Application No. UAN- 0000077742
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 300
(b) Funds Allocated for Environment Management (Capital) (in Crores) 54.90
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.25
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 5.10
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 2376000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 2376000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Lime3375Tons per AnnumOpen MarketRoad30 Open MarketCopy of Linkage
(2.)Molasses149400Tons per AnnumCaptive and Open MarketRoad,OthersPipe Conveyor0 CaptiveCopy of Linkage
(3.)Bagasse675504Tons per AnnumCaptiveConveyor Belt0 CaptiveCopy of Linkage
(4.)Sugar cane2376000Tons per AnnumLocal FarmersRoad50 Open MarketCopy of Linkage
(5.)Coal19800Tons per AnnumOpen MarketRoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2019 To 29 Feb 2020
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube49.425.248.160
(2.)PM10Micro Gram per Meter Cube72.235.971.8100
(3.)NOxMicro Gram per Meter Cube391338.580
(4.)SO2Micro Gram per Meter Cube4111.439.880
(5.)OthersCOMili Gram per Meter Cube1.40.11.44
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.787.226.58.5
(2.)TSSmg/l0005
(3.)Chloridesmg/l117202501000
(4.)Fluoridemg/l0.380.1611.5
(5.)TDSmg/l8303425002000
(6.)Total Hardnessmg/l642275200600
(7.)Heavy Metalsleadmg/l000.010.01
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.927.15A
(2.)DOmg/l7.156.4A
(3.)BODmg/l33A
(4.)CODmg/l448A
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))52.939.270
(2.)Leq(Day)A-weighted decibels(dB(A))63.543.875
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare291158
(2.)Electric ConductivityMillisiemens per Centimetre0.350.13
(3.)K(Potassium)Kilogram per hectare840479
(4.)P(Phosphorus)Kilogram per hectare7729
(5.)pH8.406.9
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 30
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface5083Copy of Permission LetterPipelineJack Well2245/201613 May 20162003.03
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Process Effluent (Sugar and Cogeneration)5452000Primary and Secondary TreatmentOthersOn land for irrigation0545
(2.)Spraypond Overflow13202000Primary and Secondary TreatmentOthersOn land for irrigation01320
(3.)Process Effluent (100 KLPD Distillery)200250Concentration and IncinerationOthersZero Liquid Discharge2000
(4.)Sugar Condensate26403000Primary, Secondary and Tertiary TreatmentReuse within the Plant & Recycling2640
(5.)Process Effluent (45 KLPD Distillery)270300CompostingOthersZero Liquid Discharge2700
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 4975
(b)Total Discharged Water (Kilolitre per Day) 1865
(c)Total Reused Water (Kilolitre per Day) 3110
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Fly AshFly Ash9540Tons0RoadOthersSold to brick manufacturers/ composting
(2.)PressmudIndustrial Waste72000Tons0RoadOthersUsed in composting along with the spentwash
(3.)Ash from incinerator boilerIndustrial Waste14865Tons0RoadOthersSold as potash rich manure to farmers
(4.)ETP SludgeIndustrial Waste100Tons0RoadOthersTreated in composting
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube410.3214.2855.2980
(2.)PM10Microgram per Meter Cube72.20.770.1172.32100
(3.)PM2.5Microgram per Meter Cube49.40.260.1549.5660
(4.)NOxMicrogram per Meter Cube390.262.2541.2680
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)1*35 TPH Incinerator BoilerCoal/Bagasse + Conc. Spentwash804PM103.24
(2.)2*120 TPH BoilerBagasse804PM103.20
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 17000
(b)Source Captive (24 MW Cogeneration power plant)
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2*160 KVA, 1*625 KVA
(e)Stack Height (in m) 6.5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 97.88
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 97.88
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 18726
(b)Waste/Barren Land (ha.) 11666
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 790
(e)Settlements (ha.) 5201
(f)Industrial (ha.) 100
(g)Forest (ha.) 3517
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 40000.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Safety Zone28.25Area under roads and parking
(2.)OthersVacant Land28.27685
(3.)Built Up Area9.05214Builtup area
(4.)Green belt32.3010
Total (ha.) 97.87999
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNot Applicable0No critically polluted area within 10 Km radius of the factory site
(2.)ESAsNot Applicable0No ESAs within 10 Km radius of the factory site
(3.)ESZsNot Applicable0No ESZs within 10 Km radius of the factory site
(4.)CorridorsNot Applicable0No corridors within 10 Km radius of the factory site
(5.)Wildlife CorridorsNot Applicable0No wildlife corridors within 10 Km radius of the factory site
(6.)WLSNot Applicable0No WLS within 10 Km radius of the factory site
(7.)NPANot Applicable0No NPA within 10 Km radius of the factory site
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNot Applicable0No Defence installations within 10 Km radius of the factory site
(2.)ForestReserved Forest1Reserved Forest Area is at a distance of 1 Km to the project site
(3.)Archaeological SitesNot Applicable0No Archaeological Sites within 10 Km radius of the factory site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired The industry has its own land of 97.88 Ha, which i
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 100000
(iii)Period of Implementation 5
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. 2019-20/519
(iii)Date of issue 18 Aug 2020
(iv)Recommendation Forwarded to Chief Wildlife Warden, Nagpur
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Krishna River
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 150
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 25
(e)No. of working days 330
(f)Total Manpower 200
32.
Green Belt in Ha:
(a)Total Area of Green Belt 32.30
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 48450
(d)Funds Allocated for Plantation 4845000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThe blending of ethanol with petrol would considerably reduce the consumption of crude oils
(2.)SocialProject will create direct & indirect employment opportunities within the surrounding region. With the implementation of the proposed project, the socio-economic status of the local people will improve
(3.)FinancialThe industry will provide RS/ENA/Ethanol which will earn and save foreign exchange in blending with petrol
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/EIA/1922/SA0159
(ii)Name of the EIA Consultant Dr. Subbarao's Environment Center
(iii)Address Arundhati, Opp. Sahayognagar, MSEB Road, Vishrambag, Sangli
(iv)Mobile No. 9372109522
(v)Landline No. 0233230185
(vi)Email Id bssubbarao@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 22 Jun 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. This is an expansion proposal accordingly, the PP shall submit the certified compliance report to the conditions of CTO/EC from the SPCB/ RO MoEFCC. (S.No 9 of Form 2 has to revised and uploaded). 2. Documents related to Public hearing proceedings which has forwarded by the Member Secretary, SPCB to the MoEFCC along with complete public hearing/consultation documents, needs to be uploaded. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (S.no. 7.1) 3. Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2. Kindly upload the action plan in S.No. 7.1 of Form 2 alongwith other requisite details. 4. PP in form 2 (S.No. 27) has not adequately mentioned the details of R&R. Everything mentioned NA. 5. Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2). PP mentioned Not Applicable. 6. It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. 29 Sep 2020
2. Eds Reply LetterThe correction have been made as per the instruction received 20 Oct 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAbasaheb Jotiram Patil
DesignationMD
Name of Company (Applicant Name should not be given here)SAHYADRI SAHAKARI SAKHAR KARKHANA LTD
AddressYeshwantnagar, Taluka Karad, District Satara.
Print