1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Sugar Factory capacity from 7500 to 13,200 TCD, Distillery capacity from 45 to 145 KLPD (RS/ENA/Ethanol) and establishment of 24 MW Co-generation Power Plant at Yeshwantnagar, Tal. Karad, Dist. Satara by Sahyadri Sahakari Sakhar Karkhana Ltd | (b)Name of the Company / Organisation | SAHYADRI SAHAKARI SAKHAR KARKHANA LTD | (c)Registered Address | Yeshwantnagar, Taluka Karad, District Satara.,,Satara,Maharashtra-415115 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Abasaheb Jotiram Patil | (b)Designation (Owner/ Partner/ CEO) | MD | (c)Address | Sahyadri SSK Ltd, Yeshwantnagar, Taluka Karad, District Satara,,Karad,Satara,Maharashtra-415115 | (d)Pin code | 415115 | (e)E-mail | bssubbarao@yahoo.com | (f)STD Code. | 2164(f)Telephone No. | 661500 | (g)Fax No. | 02164661566 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(g) Distilleries 5(j) Sugar Industry
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/MH/IND2/168892/2018 | (d)Master Proposal Number(Single Window) | SW/168891/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 3 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Yeshwantnagar-1 to 53, 54B, 55, 64 to 84, 86, 89 t | (b)Pincode | 415115 | (c)Bounded Latitudes (North) | | From | | Degree | 17.3563 | Minutes | | Second | | From | | Degree | 17.3685 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 74.1589 | Minutes | | Second | | From | | Degree | 74.1708 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | E43O3, E43O7 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 600 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 3 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/114/2018-IA-II(I) | (b)Date of Apply of TOR | 26 Mar 2018 | (c)Date of Issue of TOR / Standard ToR | 04 May 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 15 Jun 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Sahyadri Sahakari Sakhar Karkhana Limited | State : | Maharashtra | District : | Satara | Tehsil : | Karad | Village : | Yeshwantnagar |
| 130 | The people in the surrounding area are in favor of the expansion project as the industry is taking due care in maintaining the clean environment by adopting necessary pollution control measures. The m | District Magistrate | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Sugarcane crushing capacity | 13200 TCD | Expansion from 7500 TCD to 13200 TCD | (2.) | Cogeneration Power | 24 MW | | (3.) | Distillery (RS/ENA/Ethanol) | 145 KLPD | Expansion from 45 to 145 KLPD | (4.) | TG Set | 5 MW | Connected to 35 TPH Incinerator Boiler | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Distillery (RS/ENA/Ethanol) | 145 | Kilo Litre per Day | | Road | | (2.) | Cogeneration Power | 24 | Mega Watt(MW) | | Others | Grids | (3.) | Sugarcane Crushing Capacity | 13200 | Tons Crushed per Day | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 11 Nov 2019 | (iv)Valid Upto | 31 Jul 2020 | (v)File No. | 0000077742/CR-19110003777 | (vi)Application No. | UAN- 0000077742 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 300 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 54.90 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 2.25 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 5.10 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 2376000 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 2376000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Lime | 3375 | Tons per Annum | | Open Market | Road | | 30 | Open Market | | Copy of Linkage | (2.) | Molasses | 149400 | Tons per Annum | | Captive and Open Market | Road,Others | Pipe Conveyor | 0 | Captive | | Copy of Linkage | (3.) | Bagasse | 675504 | Tons per Annum | | Captive | Conveyor Belt | | 0 | Captive | | Copy of Linkage | (4.) | Sugar cane | 2376000 | Tons per Annum | | Local Farmers | Road | | 50 | Open Market | | Copy of Linkage | (5.) | Coal | 19800 | Tons per Annum | | Open Market | Road | | 100 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2019 To 29 Feb 2020 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 49.4 | 25.2 | 48.1 | 60 | (2.) | PM10 | | Micro Gram per Meter Cube | 72.2 | 35.9 | 71.8 | 100 | (3.) | NOx | | Micro Gram per Meter Cube | 39 | 13 | 38.5 | 80 | (4.) | SO2 | | Micro Gram per Meter Cube | 41 | 11.4 | 39.8 | 80 | (5.) | Others | CO | Mili Gram per Meter Cube | 1.4 | 0.1 | 1.4 | 4 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.78 | 7.22 | 6.5 | 8.5 | (2.) | TSS | | | mg/l | | 0 | 0 | 0 | 5 | (3.) | Chlorides | | | mg/l | | 117 | 20 | 250 | 1000 | (4.) | Fluoride | | | mg/l | | 0.38 | 0.16 | 1 | 1.5 | (5.) | TDS | | | mg/l | | 830 | 342 | 500 | 2000 | (6.) | Total Hardness | | | mg/l | | 642 | 275 | 200 | 600 | (7.) | Heavy Metals | | lead | mg/l | | 0 | 0 | 0.01 | 0.01 | |
14.3. No. of Surface Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.92 | 7.15 | A | (2.) | DO | | mg/l | | 7.15 | 6.4 | A | (3.) | BOD | | mg/l | | 3 | 3 | A | (4.) | COD | | mg/l | | 44 | 8 | A | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 52.9 | 39.2 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 63.5 | 43.8 | 75 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 291 | 158 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 0.35 | 0.13 | (3.) | K(Potassium) | Kilogram per hectare | | 840 | 479 | (4.) | P(Phosphorus) | Kilogram per hectare | | 77 | 29 | (5.) | pH | | | 8.40 | 6.9 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 30 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 508 | 3 | Copy of Permission Letter | Pipeline | | Jack Well | | 2245/2016 | 13 May 2016 | 2003.03 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Process Effluent (Sugar and Cogeneration) | 545 | 2000 | Primary and Secondary Treatment | Others | On land for irrigation | 0 | 545 | (2.) | Spraypond Overflow | 1320 | 2000 | Primary and Secondary Treatment | Others | On land for irrigation | 0 | 1320 | (3.) | Process Effluent (100 KLPD Distillery) | 200 | 250 | Concentration and Incineration | Others | Zero Liquid Discharge | 200 | 0 | (4.) | Sugar Condensate | 2640 | 3000 | Primary, Secondary and Tertiary Treatment | Reuse within the Plant & Recycling | | 2640 | | (5.) | Process Effluent (45 KLPD Distillery) | 270 | 300 | Composting | Others | Zero Liquid Discharge | 270 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 4975 | (b)Total Discharged Water (Kilolitre per Day) | 1865 | (c)Total Reused Water (Kilolitre per Day) | 3110 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Fly Ash | Fly Ash | | 9540 | Tons | 0 | Road | | Others | Sold to brick manufacturers/ composting | (2.) | Pressmud | Industrial Waste | | 72000 | Tons | 0 | Road | | Others | Used in composting along with the spentwash | (3.) | Ash from incinerator boiler | Industrial Waste | | 14865 | Tons | 0 | Road | | Others | Sold as potash rich manure to farmers | (4.) | ETP Sludge | Industrial Waste | | 100 | Tons | 0 | Road | | Others | Treated in composting | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 41 | 0.32 | 14.28 | 55.29 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 72.2 | 0.77 | 0.11 | 72.32 | 100 | (3.) | PM2.5 | | Microgram per Meter Cube | 49.4 | 0.26 | 0.15 | 49.56 | 60 | (4.) | NOx | | Microgram per Meter Cube | 39 | 0.26 | 2.25 | 41.26 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 1*35 TPH Incinerator Boiler | Coal/Bagasse + Conc. Spentwash | 80 | 4 | PM10 | | 3.24 | (2.) | 2*120 TPH Boiler | Bagasse | 80 | 4 | PM10 | | 3.20 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 17000 | (b)Source | Captive (24 MW Cogeneration power plant) | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 2*160 KVA, 1*625 KVA | (e)Stack Height (in m) | 6.5 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 97.88 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 97.88 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 18726 | (b)Waste/Barren Land (ha.) | 11666 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 790 | (e)Settlements (ha.) | 5201 | (f)Industrial (ha.) | 100 | (g)Forest (ha.) | 3517 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 40000.0000 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Safety Zone | | 28.25 | Area under roads and parking | (2.) | Others | Vacant Land | 28.27685 | | (3.) | Built Up Area | | 9.05214 | Builtup area | (4.) | Green belt | | 32.3010 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Not Applicable | 0 | No critically polluted area within 10 Km radius of the factory site | (2.) | ESAs | Not Applicable | 0 | No ESAs within 10 Km radius of the factory site | (3.) | ESZs | Not Applicable | 0 | No ESZs within 10 Km radius of the factory site | (4.) | Corridors | Not Applicable | 0 | No corridors within 10 Km radius of the factory site | (5.) | Wildlife Corridors | Not Applicable | 0 | No wildlife corridors within 10 Km radius of the factory site | (6.) | WLS | Not Applicable | 0 | No WLS within 10 Km radius of the factory site | (7.) | NPA | Not Applicable | 0 | No NPA within 10 Km radius of the factory site | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | Not Applicable | 0 | No Defence installations within 10 Km radius of the factory site | (2.) | Forest | | Reserved Forest | 1 | Reserved Forest Area is at a distance of 1 Km to the project site | (3.) | Archaeological Sites | | Not Applicable | 0 | No Archaeological Sites within 10 Km radius of the factory site | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | The industry has its own land of 97.88 Ha, which i | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 100000 | (iii)Period of Implementation | 5 | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | Yes | (i)Uploaded copy of approval | Copy of approval | (ii)Letter No. | 2019-20/519 | (iii)Date of issue | 18 Aug 2020 | (iv)Recommendation | Forwarded to Chief Wildlife Warden, Nagpur | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Krishna River | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 5 | (b)Permanent Employment-During Operation | 150 | (c)Temporary Employment- During Construction | 20 | (d)Temporary Employment- During Operation | 25 | (e)No. of working days | 330 | (f)Total Manpower | 200 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 32.30 | (b)Percentage of Total Project Area | 33.00 | (c)No. of Plants to be Planted | 48450 | (d)Funds Allocated for Plantation | 4845000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | The blending of ethanol with petrol would considerably reduce the consumption of crude oils | (2.) | Social | Project will create direct & indirect employment opportunities within the surrounding region. With the implementation of the proposed project, the socio-economic status of the local people will improve | (3.) | Financial | The industry will provide RS/ENA/Ethanol which will earn and save foreign exchange in blending with petrol | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Industrial Projects - 3 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | QCI/NABET/EIA/1922/SA0159 | (ii)Name of the EIA Consultant | Dr. Subbarao's Environment Center | (iii)Address | Arundhati, Opp. Sahayognagar, MSEB Road, Vishrambag, Sangli | (iv)Mobile No. | 9372109522 | (v)Landline No. | 0233230185 | (vi)Email Id | bssubbarao@yahoo.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 3 | (ix)Validity of Accreditation | 22 Jun 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | 1. This is an expansion proposal accordingly, the PP shall submit the certified compliance report to the conditions of CTO/EC from the SPCB/ RO MoEFCC. (S.No 9 of Form 2 has to revised and uploaded).
2. Documents related to Public hearing proceedings which has forwarded by the Member Secretary, SPCB to the MoEFCC along with complete public hearing/consultation documents, needs to be uploaded. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (S.no. 7.1)
3. Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2. Kindly upload the action plan in S.No. 7.1 of Form 2 alongwith other requisite details.
4. PP in form 2 (S.No. 27) has not adequately mentioned the details of R&R. Everything mentioned NA.
5. Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2). PP mentioned Not Applicable.
6. It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. | 29 Sep 2020 | 2. | Eds Reply Letter | The correction have been made as per the instruction received | 20 Oct 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Abasaheb Jotiram Patil | Designation | MD | Name of Company (Applicant Name should not be given here) | SAHYADRI SAHAKARI SAKHAR KARKHANA LTD | Address | Yeshwantnagar, Taluka Karad, District Satara. |
|