Project Name BBchemicals Company/Organisation Name B B CHEMICALS
Registered Address B-49, B-50, MIDC Area, Paithan, Dist. Aurangabad, Maharashtra Maharashtra 431107 Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant bhagwan Ramchandra Bangar
(b)Designation (Owner/ Partner/ CEO) Owner
(c)Address B-49, B-50, MIDC Area, Paithan, Dist. Aurangabad, Maharashtra,Aurangabad,Maharashtra-431107
(d)Pin code 431107
(e)E-mail bbchemicalsunit2@gmail.com
(f)Telephone No. 0
(g)Fax No. 0
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f)-API
(b)Minor Project/ActivityNIL
(c)Category A
(d)Proposal Number IA/MH/IND2/168670/2020
(e)Master Proposal Number(Single Window) SW/168669/2020
(f)EAC concerned (for category A Projects only) Industrial Projects - 3
(g)Project Type(New/Expansion/Modernization) Fresh EC
4.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
5.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(c)Reason -1
(d)Supporting Document Copy of Supporting Document

Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No The site is already in an existing Notified Industrial Area [MIDC] Maharashtra Industrial Development Corporation. Hence there will be no change in land use.
1.2 Clearance of existing land, vegetation and buildings? No There is no need of clearance of existing land
1.3 Creation of new land uses? No The said land is reserved for industrial projects by Govt. of Maharashtra.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Geo technical investigation report will be done
1.5 Construction works? Yes Construction works will be done systematically, with economy of materials and with environmental care
1.6 Demolition works? No No demolition works are required
1.7 Temporary sites used for construction works or housing of construction workers? No No housing for workers proposed, workers will come from nearby area.
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations No Above ground buildings are already existed which includes existing structures for Cooling towers, Plant areas, Storage sheds, product tank farm, etc. Hence no additional Above ground buildings, structures or earth works including linear structures, cut and fill or excavations is envisaged.
1.9 Underground works including mining or tunneling? No No underground works including mining or tunnelling is required
1.10 Reclamation works? No No reclamation work is required
1.11 Dredging? No No dredging is involved
1.12 Offshore structures? No Not Applicable
1.13 Production and manufacturing processes? Yes Detailed Manufacturing process in mentioned in Prefeasibility Report
1.14 Facilities for storage of goods or materials? Yes Separate storage area will be provided for finished goods and raw materials storage
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes During Constriction Existing toilet facilities will be sufficient for the construction workers and the domestic waste generated will be treated in soak pit followed by septic tank. During Operation Domestic waste generated during operation phase will be treated in Sewage treatment plant. Solid Waste Hazardous Waste- • ETP Sludge- 200 Kg/day • Solvent Distillation Residue - 848.88kg/Month • Evaporation Salts-2177 kg/day • Spent Carbon/ Hyflow-5.717 kg/day • Off Specification Prod
1.16 Facilities for long term housing of operational workers? No The operational workers will be employed from nearby area.
1.17 New road, rail or sea traffic during construction or operation? No Proposed project is located in industrial area [MIDC] Maharashtra Industrial Development Corporation, infrastructure facility is already available
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Proposed project is located in Notified Industrial Area . [MIDC] Maharashtra Industrial Development Corporation, infrastructure facility is already available.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No No closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements will be required
1.20 New or diverted transmission lines or pipelines? No No new or diverted transmission lines or pipelines will be laid.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No There will be no impoundment, damming, culverting, realignment or other changes to the hydrology of water courses or aquifers.
1.22 Stream crossings? No No stream crossing the site.
1.23 Abstraction or transfers of water from ground or surface waters? No Not applicable
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No There will be no change in the water bodies or the land surface affecting drainage or run-off.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Raw materials for construction activity such as cement, sand, steel, aggregate etc. shall be transported by road.
1.26 Long-term dismantling or decommissioning or restoration works? No No long- term dismantling or decommissioning or restoration works is envisaged from the proposed project.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not applicable
1.28 Influx of people to an area in either temporarily or permanently? No Not envisaged
1.29 Introduction of alien species? No Introduction of alien species is not envisaged.
1.30 Loss of native species or genetic diversity? No No such case is reported from the area so far.
1.31 Any other actions? No Not Applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The land is part of notified Industrial estate of Govt. Of Maharashtra.
2.2 Water (expected source & competing users) unit: KLD Yes Source of water will be from MIDC for Existing and proposed. Existing requirement is 4.0 CMD Additional requirement is 84.7 CMD. Total – 88.70 CMD.
2.3 Minerals (MT) No Not Applicable.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Construction material as available locally such as sand, reinforcement steel, structural steel, cement, metal etc will be used for construction purpose. The quantification of the materials will be done during detailed engineering stage.
2.5 Forests and timber (source – MT) No No forests and timber will be used during construction/ operation of the project activity.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Existing steam Boiler 1 -1 TPH-Fuel-Briquette- 200 Kg/Hr. Proposed Steam Boiler 2 - 1 TPH- Fuel- Briquette-200 Kg/Hr. Proposed Thermopak- 2.0 lac Kcal/hr- Fuel- LDO- 150 Lit./Day Existing DG Set-1 no. - 62.5 KVA-Fuel LDO- 1 KLD.
2.7 Any other natural resources (use appropriate standard units) No Not Applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Details are mentioned in pre-feasibility report for list of all hazardous chemicals used. Hazardous Chemicals used will be properly stored & handled as per MSIHC rule.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No No effect is envisaged
3.3 Affect the welfare of people e.g. by changing living conditions? No No harmful effects to human health or the environment are envisaged from the project. There will be positive impact in the area
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No No effect envisaged
3.5 Any other causes No Not applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not applicable
4.2 Municipal waste (domestic and or commercial wastes) Yes Commercial waste: Municipal Waste paper from administrative buildings, waste metals, canteen waste etc. Disposal method Waste paper and metal will be given to recyclers, and kitchen waste will be send to authorised agencies
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes ETP Sludge- 200 Kg/day • Solvent Distillation Residue - 848.88kg/Month • Evaporation Salts-2177 kg/day • Spent Carbon/ Hyflow-5.717 kg/day • Off Specification Products- 200 Kg/Month • Spent Oil/ Process Residue/ Waste-250 Kg/Month • Discarded containers and Drums Barrels- 100 nos/M Chemical sludge, Oil and grease skimming residues-300 kg/M
4.4 Other industrial process wastes Yes Non-Hazardous waste generated
4.5 Surplus product No There will be no surplus product
4.6 Sewage sludge or other sludge from effluent treatment Yes ETP sludge will be send to CHWSTDF
4.7 Construction or demolition wastes Yes Minimal quantity of debris, scraps, used cement bags; iron/steel scrap and cardboards waste could be generated during proposed construction activity.
4.8 Redundant machinery or equipment No There will be no redundant machinery or equipment
4.9 Contaminated soils or other materials No There will be no contamination of soil or any other material
4.10 Agricultural wastes No There will not be any agricultural waste
4.11 Other solid wastes No There will not be any other solid waste
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes The air pollution is mainly from emissions of air pollutants from the boiler stacks and DG set. DG SET will be used as a stand-by source of electricity. Cyclone dust collector is proposed to combat the emissions from the boilers before releasing into atmosphere through a stack. Very little emission from fugitive sources is also predicted.
5.2 Emissions from production processes Yes Emissions from processes are controlled by Scrubber and condensers provided to process vent.
5.3 Emissions from materials handling including storage or transport Yes Fugitive emissions from solvent storage & handling. Transportation of materials also
5.4 Emissions from construction activities including plant and equipment Yes Negligible - Emission from diesel operated vehicles, concrete mixers and excavators are anticipated. However, this equipment will be maintained properly to ensure minimum emissions and vehicles with PUC certificates will be used.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes All precautions to suppress dust such as water sprinkling. Odour from the handling of chemicals but it will be limited to the operational area.
5.6 Emissions from incineration of waste No There will be no waste incinerated on site
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No There will be no burning of waste in open air
5.8 Emissions from any other sources No There will be no emissions from any other source
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes The probable sources of noise shall be Boiler, centrifuge, cooling tower, compressor etc. Proper acoustic treatments would be provided to keep the ambient noise levels below the permissible limits as per CPCB standards. Expected noise levels in the section will be about 72 dB (A). All preventive measures such as regular O& M of pumps, motors, and compressors will be carried out and enclosures will be provided to control noise levels at source.
6.2 From industrial or similar processes Yes Noise generated is being maintained below standards
6.3 From construction or demolition Yes There will be Noise generated during construction activity. i. e. Crane, crusher from vehicles used for loading and unloading of material. However, this will be temporary in nature.Also, there will be no work during night.
6.4 From blasting or piling No Not Applicable
6.5 From construction or operational traffic Yes Noise during construction activities will be temporary & will be maintained within the prescribed noise standards
6.6 From lighting or cooling systems No No noise will be generated from lighting or cooling systems
6.7 From any other sources No There are no other sources of noise generation
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes There is no risk of contamination of land or water as handling will be on impervious surfaces. Any accidental spillages will be leading to ETP. Precaution will be taken while loading, unloading. MSDS will be followed. Training for workers will be given for handling of hazardous materials. PPE will be used.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No The proposed project is based on the concept of “Zero Effluent Discharge” hence no sewage or other effluent will be discharged outside the plant premises.
7.3 By deposition of pollutants emitted to air into the land or into water No The plant will be completely based on Zero Liquid Discharge thus; no risk of contamination because of release of pollutants into water is envisaged. The air emissions will be controlled by providing adequate pollution control equipment. However, continuous online measurement of stack emissions quality will be done to assure the level of emission within the prescribed limit
7.4 From any other sources No Not applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Likelihood of such an event is not seen till now and suitable measures will be adopted so that there will be no such risk in the coming future
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes These associated hazards can take place due to process upsets, leakages, equipment and hardware failures, loss of containment, human failures etc. For operation required safety precautions will be implemented. Adequate firefighting arrangement will be provided as per Factory Act. Safety wears and first aid will be provided wherever necessary. Hazardous chemicals will be properly stored & all the precautions will be taken according to MSDS. On site emergency plan will be prepared and follow
8.2 From any other causes No Not applicable
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No Proposed site falls under Seismic Zone II
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Infrastructure already available from MIDC. The demand for housing will go up due to recruitment of people
9.2 Lead to after-use of the site, which could have an impact on the environment No There will be no significant impact on environment
9.3 Set a precedent for later developments No The site is located in developed MIDC area
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Proposed industry is located in MIDC area, MIDC has also other industries, it may cause cumulative effect
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Not present within 15 km aerial distance from proposed project site
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Water Bodies: Jaikwadi Dam is 6.19 km away from the project site
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Yes Jayakwadi Bird Sanctuary reserved for the migratory birds, Gazette Notification S.O. 2202 (E) amended dated 12th July 2017]. MIDC is already existed before declaration of Eco Sensitive Zone
4 Inland, coastal, marine or underground waters Yes Inland water bodies: Jaikwadi dam at Paithan is 6.19 km
5 State, National boundaries No Not Applicable
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes Aurangabad- Paithan Road
7 Defence installations No There is no defence installation within 15 km radius of the project site
8 Densely populated or built-up area Yes Mudhalwadi- 0.37 km Pimpalwadi- 1.19 km
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes There are a few primary schools, dispensaries, small hospitals, places of worship, with 15 km from the project site
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes Jaikwadi dam located at Paithan which is 6.19 km away from the project site.
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No There is no critically polluted area in 10 km radius of the project site
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No The plant site falls in Seismic Zone- II as per IS : 1893 (Part-I) : 2002
Document to be attached
1. Upload a copy of PFR Uploaded a copy of PFR.
2. Upload a copy of EMP Uploaded a copy of EMP.
3. Upload Scanned copy of covering letter. Uploaded Scanned copy of covering letter..
4. Upload Additional attached if any(Single PDF) Uploaded Additional attached if any(Single PDF).
5. Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)29/10/2020(i) This is an expansion proposal accordingly, the PP shall submit the certified compliance report to the conditions of CTO from the SPCB. (ii) All old CTOs to be uploaded to verify the violation, if any done by PP. (iii) Details of earlier production capacity needs to be authenticated and uploaded to check the violation, if any. (iv) Based on the information submitted by PP it is Category B2 project, PP submitted this application at Central Level due to general condition. The Notification dated 27.03.2020 is only for API not intermediates. If the proposal is for API & Intermediate, please apply for TOR. Please check your proposal once again. (v) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be submitted. It is also mentioned that after acceptance the Proposal, proposal can not be revise. Therefore, PP/Consultant is requested to kindly do needful accordingly.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicantbhagwan Ramchandra Bangar
DesignationOwner
Name of Company (Applicant Name should not be given here)B B CHEMICALS
AddressB-49, B-50, MIDC Area, Paithan, Dist. Aurangabad, Maharashtra