Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Synthetic Organic Manufacturing Plant at Additional Patalganga MIDC, Plot No. E-127, Tal.- Khalapur, Dist.- Raigad, Maharashtra by “SMT Organic Chemicals Pvt. Ltd.”
(b)Name of the Company / Organisation SMT ORGANICS CHEMICAL PRIVATE LIMITED
(c)Registered Address A-204, Amar Gian Complex, LBS Marg Khopat,Thane West,Thane,Maharashtra-400601
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ashok Saraf
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Plot No. E-127, Additional Patalganga MIDC,Taluka Khalapur Dist. Raigad,Khalapur,Raigad,Maharashtra-410220
(d)Pin code 410220
(e)E-mail smtorganics@gmail.com
(f)STD Code. 22(f)Telephone No. 41128000
(g)Fax No. 21720036
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/IND2/53584/2016
(d)Master Proposal Number(Single Window) SW/167822/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. E-127, Additional Patalganga MIDC, Tal. Khalapur,
(b)Pincode 410220
(c)Bounded Latitudes (North)
From
Degree 18.854501
Minutes
Second
From
Degree 18.855331
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.162466
Minutes
Second
From
Degree 73.162702
Minutes
Second
(e)Survey of India Topo Sheet No. 47F1, 47F5
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 30
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.95
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraRaigadKhalapur
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11011/145/2016- IA II(I)
(b)Date of Apply of TOR 09 May 2016
(c)Date of Issue of TOR / Standard ToR 11 May 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason The project is in MIDC Area
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Plot Area3997.00sq.m.
(2.)Explosive Yard389.75sq.m.
(3.)Total Built up area1266.30sq.m.
(4.)Green Belt Area (33% of Total Plot Area)1320.00sq.m.
(5.)Net Plot Area3607.25sq.m.
(6.)Parking Area384.79sq.m.
(7.)Open Area636.16sq.m.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Formaldehyde (37% to 55% Concentration) and36000Tons per AnnumRoad
(2.)Phenol Formaldehyde Liquid resin86747Tons per AnnumRoad
(3.)Phenol Formaldehyde Powder resin43374Tons per AnnumRoad
(4.)Urea Formaldehyde and Melamine Formaldehyde Liquid Resin31304Tons per AnnumRoad
(5.)Urea Formaldehyde and Melamine Formaldehyde Powder Resin15652Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 Aug 2020
(iv)Valid Upto 31 Jul 2021
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 15.5
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.43
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.31
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.22
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 360187
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 360187
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Urea23882Tons per AnnumLocal MarketRoad40 Open MarketCopy of Linkage
(2.)MF resin liquid31304Tons per AnnumPipe linePipe Conveyor40 Open MarketCopy of Linkage
(3.)Methanol45010Tons per AnnumLocal MarketRoad40 Open MarketCopy of Linkage
(4.)Caustic Soda14659Tons per AnnumLocal MarketRoad40 Open MarketCopy of Linkage
(5.)Formic Acid6Tons per AnnumLocal MarketRoad40 Open MarketCopy of Linkage
(6.)Phenol18390Tons per AnnumLocal MarketRoad40 Open MarketCopy of Linkage
(7.)Formaldehyde72000Tons per AnnumPipe line from Formaldehyde plantPipe Conveyor40 Fuel Supply AgreementCopy of Linkage
(8.)Melamine25043Tons per AnnumLocal MarketRoad40 Open MarketCopy of Linkage
(9.)UF resin liquid31304Tons per AnnumPipe linePipe Conveyor40 Open MarketCopy of Linkage
(10.)Phenol Formaldehyde Resin98589Tons per AnnumLocal MarketRoad40 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2019 To 31 Dec 2019
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube55.731.946.3100
(2.)NOxMicro Gram per Meter Cube23.59.418.580
(3.)PM2.5Micro Gram per Meter Cube22.810.719.660
(4.)SO2Micro Gram per Meter Cube20.25.715.180
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l59.1339.422501000
(2.)Total Hardnessmg/l188.15116.09200600
(3.)pHNA7.617.248.58.5
(4.)TSSmg/l005002000
(5.)TDSmg/l4852805002000
(6.)Fluoridemg/l0011.5
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l4.94.3A
(2.)pHNA7.487.42E
(3.)BODmg/l74B
(4.)CODmg/l3117E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))53.650.275
(2.)Leq(Night)A-weighted decibels(dB(A))48.63970
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.278.03
(2.)N(Nitrogen)Kilogram per hectare127.2100.88
(3.)P(Phosphorus)Kilogram per hectare16.18.75
(4.)Electric ConductivityMillisiemens per Centimetre901.4648.5
(5.)K(Potassium)Kilogram per hectare172.1150.7
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMIDC Supply3051Copy of Permission LetterPipelineOthersMIDC Water SupplyNA01 Aug 2020305
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial Waste Water17.8518ETP cum STP followed by MEE to achieve ZLDReuse within the Plant & Recycling,Green Belt Renewal Plant17.85
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 17.85
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 17.85
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Spent Oil/ Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.36Kilolitre5RoadAuthorized Recyclers
(2.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)600Tons27RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Wastes/ Residue containing oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2.4Tons5RoadAuthorized Recyclers
(4.)Spent ResinHazardous Waste (as per Hazardous and Other Waste Management rules 2016)36Kilolitre5RoadAuthorized Recyclers
(5.)Old CatalystsIndustrial Waste0.6Tons0RoadCo-Processing
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube22.80.10.0022.960
(2.)NOxMicrogram per Meter Cube23.50.10.5824.0980
(3.)PM10Microgram per Meter Cube49.50.10.0049.6100
(4.)SO2Microgram per Meter Cube20.20.10.4320.6480
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)5 TPH BoilerFurnace Oil480.6PM100.00078
(2.)DG Set (1000 kVA)Diesel100.3PM101.09
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1112.5
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1000 kVA
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.3997
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.3997
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 3450
(b)Waste/Barren Land (ha.) 1820
(c)Grazing/ Community Land (ha.) 6770
(d)Surface Water Bodies (ha.) 370
(e)Settlements (ha.) 7490
(f)Industrial (ha.) 0
(g)Forest (ha.) 11500
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 31400.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area1266.3
(2.)Green belt1320
(3.)OthersRoad, Parking, Explosive Yard, etc.1410.7
Total (ha.) 3997
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSKarnala Bird Sanctuary2.3Project is located at 2.3 km from Karnala Bird Sanctuary
(2.)NPANA0NA
(3.)ESAsNA0NA
(4.)Critically Polluted AreaNA0NA
(5.)ESZsNA0NA
(6.)CorridorsNA0NA
(7.)Wildlife CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0NA
(2.)ForestProtected Forest2.3Project is located at 2.3 km from Karnala Bird Sanctuary
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.39
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not Applicable as land is already in possession
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Leopard, Monitor Lizard, Indian Python, Indian Peacock and Mouse Deer.
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 10 lakh
(iii)Period of Implementation 2 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 20
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 70
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.14
(b)Percentage of Total Project Area 35.03
(c)No. of Plants to be Planted 213
(d)Funds Allocated for Plantation 2000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThe proposed project is expected to yield a positive impact on the surrounding environment. It will help in sustainable development of this area including further development of physical Infrastructural facilities. It will recharge the groundwater by rain-harvesting, the road structure will be repaired, massive greening drive will improve the aesthetics and generally the land prices will go up. The road connectivity will get improved due to the industry. This improved physical infrastructure wil
(2.)SocialProject will definitely open an avenue for the young generation of our nation by generating employment to more than 50 local rural persons in construction phase and around 20 local persons in operation phase. Company will be hiring the local residents nearby project site for employment, as per their competency. This will create employment to these people and thereby will improve their living standard. The proposed project is already located in MIDC area so area development will be as per MIDC, w
(3.)FinancialThe industry is established in the rural region of the state. The establishment of industry will provide direct and indirect employment. Major part of these labors will be mainly from local villagers who are expected to engage themselves both in agriculture and project activities. This will enhance their income and lead to overall economic growth of the area. It helps to sustain the development of this area including further development of physical infrastructural facilities.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA 0075
(ii)Name of the EIA Consultant MITCON Consultancy & Engineering Services Ltd.
(iii)Address Environment Management and Engineering Division, Agriculture College Campus, Shivajinagar, Pune 411005.
(iv)Mobile No. 9665043400
(v)Landline No. 0206628940
(vi)Email Id eme@mitconindia.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 22 Sep 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. Details of NBWL Clearance has not mentioned in the Form 2 as the WLS is 2.3 km from proposed Unit. 2. Details of plant facility as per Form-2 of S. No. 7not uploaded, Request to upload the same in Form 2 w.r.t. industrial Estate document. 3. Details of documents related to PH exemption as per Form-2 of S. No. 8 not mentioned, Request to upload the same in Form 2. 4. 5. PP in form 2 (S.No. 26) has not adequately mentioned the details of Land acquisition. Everything mentioned Zero. Please provide the details of land and usage. 6. PP in form 2 (S.No. 27) has not adequately mentioned the details of R&R. Everything mentioned NA. 7. Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2) 8. PP submitted very less incremental value for PM10 & PM2.5 &SOx., please check. Air Quality Impact Prediction mentioned (18.1 of form 2) is inadequate kindly check and correct it accordingly. 9. It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. 29 Sep 2020
2.NAThe correction have been made as per the instruction received 08 Oct 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAshok Saraf
DesignationDirector
Name of Company (Applicant Name should not be given here)SMT ORGANICS CHEMICAL PRIVATE LIMITED
AddressA-204, Amar Gian Complex, LBS Marg Khopat
Print