Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Onshore Oil & Gas development drilling and production in KHAGORIJAN OIL & GAS FIELD in Dibrugarh & Tinsukia District under Tinsukia PML, Tinsukia Extension PML and Chabua PML
(b)Name of the Company / Organisation OIL INDIA LIMITED
(c)Registered Address OIL INDIA LIMITED DULIAJAN District : Dibrugarh ,,Dibrugarh,Assam-786602
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ajit Chandra Haloi
(b)Designation (Owner/ Partner/ CEO) CGM(HSE)
(c)Address Safety & Environment Department , Oil India Limited, Duliajan,,,Dibrugarh,Assam-786602
(d)Pin code 786602
(e)E-mail safety@oilindia.in
(f)STD Code. 374(f)Telephone No. 2800542
(g)Fax No. 03742801796
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(b) Offshore and onshore oil and gas exploration, development & production
Minor Activity8(a) Building and Construction projects
(b)Category A
(c)Proposal Number IA/AS/IND2/72322/2018
(d)Master Proposal Number(Single Window) SW/167701/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Tinsukia and Dibrugarh districts
(b)Pincode 786184
(c)Bounded Latitudes (North)
From
Degree 27.480469
Minutes
Second
From
Degree 27.588382
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 94.96664
Minutes
Second
From
Degree 95.349955
Minutes
Second
(e)Survey of India Topo Sheet No. 83I14, 83I15, 83M2, 83M3, 83M6, 83M7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 136
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Assam
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)AssamTinsukiaTinsukia
(2.)AssamDibrugarhChabua
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/35/2018-IA-II(I)
(b)Date of Apply of TOR 22 Jan 2018
(c)Date of Issue of TOR / Standard ToR 11 Mar 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :10 Feb 2020
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :12 Mar 2020
Distance of Public Hearing Venue from the Proposed Project :11
Public/Community Hall Baghjan TE, Baghjan
State :Assam
District :Tinsukia
Tehsil :Doom Dooma
Village :Baghjan Gaon
145• Pollution control- soil, air and noise pollution; vehicular pollution, management of wastes released from drill sites etc. • Protection of DSNP and Maguri Beel areas from pollution • Plantation inOthersAdditional Deputy Commissioner
(2.)
Date of Advertisement :05 Aug 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :05 Sep 2019
Distance of Public Hearing Venue from the Proposed Project :12
Tengakhat Public Hall
State :Assam
District :Dibrugarh
Tehsil :Tengakhat
Village :Tengakhat
59Pollution control - air and noise pollution from drill sites etc. ? Development activities - improvement of infrastructure in schools ? Hired vehicle drivers do rash driving and there is safety concOthersAdditional Deputy Commissioner
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Wells and production installations54 wells and 2 production installation
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)54 wells and 2 production installations54OthersNo of wellsOtherswell drilling
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1988.62
(b) Funds Allocated for Environment Management (Capital) (in Crores) 5.71
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 9.98
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.922
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 3.5
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 3.5
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Diesel3.5Kilo Litre per DayLocal supplierRoad50 OthersThrough supplierCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 04 Oct 2017 To 30 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube13432125.54100
(2.)OthersCOMili Gram per Meter Cube0.880.120.682
(3.)SO2Micro Gram per Meter Cube9.604.208.5080
(4.)NOxMicro Gram per Meter Cube28.7010.2027.5280
(5.)PM2.5Micro Gram per Meter Cube741965.960
    14.2.     No. of Ground Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSOthersNot Analyzed0000
(2.)Chloridesmg/l71352501000
(3.)Fluoridemg/l0.10.111.5
(4.)OthersIronmg/l0.30.050.30.3
(5.)Total Hardnessmg/l6331200600
(6.)pHOthersNo Unit6.756.186.58.5
(7.)TDSmg/l160565002000
(8.)Heavy MetalsTotal Chromiummg/l0.010.010.050.05
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)OthersTotal ColiformOthersMPN/100 ml231.8A
(2.)DOmg/l7.86A
(3.)pHOthersNo Unit7.016.39C
(4.)CODmg/l164B
(5.)BODmg/l32B
    14.4.     No. of Ambient Noise monitoring locations : 14
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))44.64045
(2.)Leq(Day)A-weighted decibels(dB(A))54.952.955
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersno unit6.274.02
(2.)P(Phosphorus)Milligram per Kilogram353
(3.)K(Potassium)Milligram per Kilogram15622
(4.)Electric ConductivityMillisiemens per Centimetre26649
(5.)N(Nitrogen)Milligram per Kilogram437230
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.16 To 4.23
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.14 To 5.69
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater400Copy of Permission LettermodeOthersWell at siteTube Well21-4/1188/AS/MIN/202013 Jul 202040
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Wastewater88Septic tank and soak pitOthersSoak Pit08
(2.)Drilling and Wash wastewater13.815Effluent Treatment PlantOthersZero Discharge13.80
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 21.8
(b)Total Discharged Water (Kilolitre per Day) 8
(c)Total Reused Water (Kilolitre per Day) 13.8
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Drill CuttingsIndustrial Waste880Tons0OthersDisposed at HDPE lined pits within siteOthersDisposed at HDPE lined pits within site
(2.)Waste Drilling MudIndustrial Waste1920Tons0OthersDisposed at HDPE lined pits within siteOthersDisposed at HDPE lined pits within site
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube480048.0160
(2.)NOxMicrogram per Meter Cube241.4112.3536.3680
(3.)Others(Specify)Total HydrocarbonMicrogram per Meter Cube1129.61.380.081129.690
(4.)PM10Microgram per Meter Cube891.450.0689.07100
(5.)SO2Microgram per Meter Cube6.191.40.446.6480
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetDiesel70.3SO20.039
(2.)DG SetDiesel70.3PM100.007
(3.)DG SetDiesel70.3NOx1.836
(4.)DG SetDiesel70.3OthersHydrocarbon0.004
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2500
(b)Source Diesel Generator sets
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) one additional 1250 KVA
(e)Stack Height (in m) 7
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 176
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 176
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 8067
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 10850
(e)Settlements (ha.) 7951
(f)Industrial (ha.) 242
(g)Forest (ha.) 923
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Defence Installations, Railway Tracks, Road Networ 12489
    Total (ha.) 40522.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersWells and production installations176
Total (ha.) 176
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSBherjan Borjan Podumoni WLS1.2Distance is measured from nearest well (well 22) to Podumoni segment of BBP WLS
(2.)Wildlife CorridorsNone10No wildlife corridors within 10 km
(3.)Critically Polluted AreaNone10No critically polluted area within 10 km
(4.)CorridorsNone10No corridors within 10 km
(5.)ESZsESZ of Dibru Saikhowa National Park1Distance is measured from nearest well (well 16)
(6.)NPADibru Saikhowa National Park1.9Distance is measured from nearest well (well 16)
(7.)ESAsNone10No ESA within 10 km
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone10No archaeological sites within 10 km
(2.)ForestNone10No wells in forest land
(3.)Defence InstallationsStrategic Defence installations0No wells located in defense installations
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? Yes
(i)Status of NBWL NIL
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 176
(c)Status of Land acquisition if not acquired In process
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species 35 Schedule-1 species
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 51 lakhs
(iii)Period of Implementation 7 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Brahmaputra River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 0.30
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 20
(b)Permanent Employment-During Operation 40
(c)Temporary Employment- During Construction 80
(d)Temporary Employment- During Operation 40
(e)No. of working days 120
(f)Total Manpower 180
32.
Green Belt in Ha:
(a)Total Area of Green Belt 3.5
(b)Percentage of Total Project Area 1.99
(c)No. of Plants to be Planted 2800
(d)Funds Allocated for Plantation 3.5
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialProvision of employment and business opportunity to local people; Development of infrastructure (roads, schools etc.) in the area; development of health infrastructure. Provision of fund to district authorities for flood protection etc.
(2.)EnvironmentalProvision of funds to forest department for habitat improvement and plantation; Plantation in tea garden and community lands
(3.)FinancialProvision of more royalty to Assam Government and more cess to Govt. of India; Energy security for the country
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0177
(ii)Name of the EIA Consultant ERM India Pvt. Ltd.
(iii)Address Building 10, Tower A, 4th Floor, DLF Cyber City Gurgaon 122002
(iv)Mobile No. 9830094463
(v)Landline No. 0124417030
(vi)Email Id debanjan.bandyopadhyay@erm.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 30 Oct 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. Please upload complete Public hearing report(PH) conducted at Bhogpara Block along with the copy of dully signed (PH report) and forwarded by Pollution Control Board. 02 Sep 2020
2.NAThe correction have been made as per the instruction received 07 Oct 2020
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterReply to ADS attached 04 Jan 2021
2.NA

 

The Committee noted that the well locations are falling in the Bherjan-Borajan-Padumoni Wild Life Sanctuary. Further, 18 wells are falling within in 10 KM of ESZ of the sanctuary. It was also noted that the wells/blocks are within 10 km of the National Park. The Committee is of opinion that Forest Clearance/ Wild Life Clearance/ ESZ Clearance should be obtained from the concerned regulatory authority. The Committee was of the view that, if any blow out/leakage, happens as that happened in Baghjan, it shall lead to disastrous effect on the environment, people and associated biodiversity. The Committee has also observed that the soil quality of the region is degraded and is reported to be acidic due to drilling activities and contamination of ground water. The Committee was of the considered view that the project proponent needs to submit a detailed report on the impact of Baghjan blow out in the study area, proposed action plan for remediation, and the proposed safety and emergency action plan.

The Committee after detailed deliberations, desired for following information/inputs in respect of the following:

  (i).        Details of court cases along with current status.

 (ii).        Detailed safety and Emergency contingency plan.

(iii).        Status of recommendations from the Standing Committee of NBWL.

(iv).        Details on the assessment of Biodiversity of the area, as suggested by the Hon’ble Supreme court of India.

 (v).        Soil and ground water quality assessment to understand the impact of drilling activities in the region, if any.

(vi).        Details of impact of Baghjan blow out in the study area.

(vii).        Damage assessment of the blow out, action plan for remediation.

 

The proposal was accordingly deferred for the needful.

29 Nov 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAjit Chandra Haloi
DesignationCGM(HSE)
Name of Company (Applicant Name should not be given here)OIL INDIA LIMITED
AddressOIL INDIA LIMITED DULIAJAN District : Dibrugarh