Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Zawar Group of Underground Lead- Zinc Mines from 4.0 Million TPA to 4.8 Million TPA Ore Production and Beneficiation from 4.0 Million TPA to 4.8 Million TPA, located near village Zawar, Tehsil Girwa and Sarada, District Udaipur, Rajasthan (ML No.03/89, MLA 3620 Ha) under para 7(ii) (a) of EIA Notification, 2006.
(b)Name of the Company / Organisation HINDUSTAN ZINC LIMITED.
(c)Registered Address Yashad Bhawan, Udaipur-313004,,Udaipur,Rajasthan-313004
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant BS Rathore
(b)Designation (Owner/ Partner/ CEO) Director- Zawar SBU
(c)Address Yashad Bhawan, Udaipur-313004,,Girwa,Udaipur,Rajasthan-313004
(d)Pin code 313004
(e)E-mail hitendra.bhuptawat@vedanta.co.in
(f)STD Code. 294(f)Telephone No. 6604027
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity2(b) Mineral beneficiation
(b)Category A
(c)Proposal Number IA/RJ/MIN/165786/2020
(d)Master Proposal Number(Single Window) SW/165785/2020
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. ML No. - 03/89; R-323/08
(b)Pincode 313004
(c)Bounded Latitudes (North)
From
Degree 241245.4
Minutes
Second
From
Degree 242251.1
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 734022.82
Minutes
Second
From
Degree 734511.81
Minutes
Second
(e)Survey of India Topo Sheet No. 45 H/11, 45H/12 and 45 H/15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 420
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 4.60
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. F.No. IV/ENV/R/Mine-484/794/2008/814
(iv)Status of Compliance Partially Complied
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Oct 7 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)lead & zinc ore production4.00.84.8OthersMillion Tons Per AnnumRoad
(2.)Ore Beneficiation4.00.84.8OthersMillion Tons per AnnumRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Ore Beneficiation Plant4.0 Million Ton per Annum0.8 Million Ton per Annum4.8 Million Ton Per Annum
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 21 Mar 2018
(iv)Valid Upto 31 Dec 2022
(v)File No. F(CPM)/Udaipur(Sarada)/2(1)/2017-2018/10088-10090
(vi)Application No. 186816
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 430
(b) Funds Allocated for Environment Management (Capital) (in Crores) 64
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.25
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.9
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 6.0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 6
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)RoM6.0OthersMillion Tons per AnnumZawar Mine (Captive Mine)Road8 CaptiveCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 7
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 3 To 5
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. 21-4(267)/CGWA/WR/2008-2185;21-4(266)/CGWA/WR/2008
(f)Date of Issue 11 Dec 2013
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface140003.2Copy of Permission LetterPipelineOthersTidi Dam (captive)Nil17 Sep 197614000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)domestic450450STPReuse within the Plant & Recycling,Green Belt Renewal Plant450
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 450
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 450
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Solid Rock wasteOthersMining1219000Tons0RoadOthersbackfilling,tailing dam and surface leveling
(2.)Mineral rejectOthersMining2603950Tons0RoadOthersbackfilling and tailing dam
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube10.80.10.111.080
(2.)PM10Microgram per Meter Cube69.20.10.169.4100
(3.)Others(Specify)COMicrogram per Meter Cube9160.10.57916.582000
(4.)NOxMicrogram per Meter Cube21.30.11.022.480
(5.)PM2.5Microgram per Meter Cube43.30.10.143.560
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NilNil00PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 33000
(b)Source Captive power plant
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1 no. 6 MW with 24kVA auxillary
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 1537.91
(b)Private Land (ha.) 0
(c)Government Land (ha.) 1160.80
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 921.29
    Total Land (ha.) 3620
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 155.35
(b)Waste/Barren Land (ha.) 1160.80
(c)Grazing/ Community Land (ha.) 59.84
(d)Surface Water Bodies (ha.) 90.97
(e)Settlements (ha.) 99.75
(f)Industrial (ha.) 0
(g)Forest (ha.) 1537.91
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : plantation & others 515.38
    Total (ha.) 3620.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Othersmine & plant245.52
Total (ha.) 245.52
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Wildlife CorridorsNone0none in 10 km radius
(2.)WLSNone0none in 10 km radius
(3.)CorridorsNone0none in 10 km radius
(4.)ESAsNone0none in 10 km radius
(5.)ESZsNone0none in 10 km radius
(6.)Critically Polluted AreaNone0none in 10 km radius
(7.)NPANone0none in 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNone0none in 10 km radius
(2.)Archaeological SitesNone0none in 10 km radius
(3.)Forest25 reserve and protected forests0.7nearest P.F from Block 1
(4.)Otherswater bodiesAbout 16 Nadi & Talavs in study area0Tidi River passing through M.L. Area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 3620
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Complete
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Osprey,Indian Peafowl, White-rumped Vulture, Indian Leopard,Indian Pangolin, Crimson rose, Bengal Monitor Lizard
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 1845 Lac
(iii)Period of Implementation 5 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Tiri River
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Daiya Nadi
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 5.9
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 0
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt170.850170.85
(2.)No. of Plants37362555000428625
(3.)Funds Allocated0.32.753.05
(4.)Percentage of Total Project Area35035
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Socialdevelopment of surrounding area through CER & CSR activities
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 2
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)LeadMajor
(2.)ZincMajor
2.
Mine Capacity in ROM (Run of Mine) 6.0 million TPA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 584(4)(3)(1809)/2019-RCM-Ajm
(b)Date of Approval 17 Dec 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 3620
(f)Approved Capacity 4.8
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 108.146
(b)Mineable Reserves (Million Ton) 15.069
(c)Extractable Reserves(Million Ton) 15.069
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral A
(f)Stripping Ratio 0 : 0
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 0
(i)Mining Method Underground
(j)Life of Mine (Years) till lease period
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area Yes
(b)Beneficiation / Washing Technology Differential froth floatation
(c)Capacity 4.8
(d)Whether it is proposed to install crusher within the mining lease area Yes
(e)No. of crushers 3
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)1205 existing crusher
(2.)2317 existing crusher
(3.)3421 existing crusher
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 3620
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Existing lease since year 1950.
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 5178
(iii)Validity of the lease deed From : 01 Apr 1950 To : 31 Mar 2030
(iv)Date of Execution of Mining Lese 01 Apr 1950
(v)Reference Number p.12(26)/Udaaipur/Gp-2/90
(d)Whether Lease Deed Renewed ? Yes
     8.1.    Earlier Renewals:
S. No.Lease Details Date of Renewal Period Copy of Earlier Lease Letter No.Area Remarks
(1.)Renewal 13 Mar 1973 From : 01 Apr 1970 To : 29 Mar 1990 Copy of Earlier Leasep.12(26)/Udaaipur/Gp-2/90 5178
(2.)Renewal 20 Oct 1992 From : 30 Mar 1990 To : 29 Mar 2010 Copy of Earlier Leasep.12(26)/Udaaipur/Gp-2/90 3620
(3.)Renewal 23 Jan 2015 From : 30 Mar 2010 To : 31 Mar 2030 Copy of Earlier LeaseME/Udai/cc-3/P/Sarada/323/08/3856 3620
9.
OB (Over Burden) Management:
Details Not Applicable
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0
(b)Depth (in meter) 0
(c)Volume (in Million Cubic meter) 0
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 0
13.
Details of Transportation:
(a)In Pit/Underground to Surface Trolley wire locomotive & Skip hoisting, LPDT thro
(b)Surface to Siding/Loading Belt Conveyor and Truck
(c)Transportation / Conveyor Details LPDT through Decline, LPDT & Skip hoisting
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND284.290284.29
(2.)FOREST LAND1537.9101537.91
(3.)GRAZING LAND59.84059.84
(4.)WASTE LAND1529.0901529.09
(5.)SURFACE WATER BODIES90.97090.97
(6.)SETTLEMENTS99.75099.75
(7.)OTHERS(Specify)river sand18.15018.15
TOTAL362003620
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY0000
(2.)INTERNAL OB DUMPS0000
(3.)OtherForest Land, Settlement001687.661687.66
(4.)TOP SOIL STORAGE0000
(5.)BUILT UP AREA (COLONY/OFFICE)0000
(6.)EXTERNAL OB DUMPS0000
(7.)ROADS0000
(8.)GREEN BELT251.4300251.43
(9.)VIRGIN AREA090.971589.941680.91
TOTAL251.4390.973277.603620
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare)
(b)Internal Dump(in hectare)
(c)Quarry(in hectare)
(d)Safety Zone(in hectare)
(e)Final Void of (hectare) at a Depth of meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.)
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc)
(h)Total afforestation plant (in hectare)
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)19960008100000
(2.)20000007781000
(3.)200300750000851100101100
(4.)201840000004000000300000028320030
(5.)2002007400007477407740
(6.)2015150000015000001300000134985049850
(7.)19980008535500
(8.)2001007400006968000
(9.)19930008601380
(10.)19970009038500
(11.)200400800000938100138100
(12.)2008012000009350009443009300
(13.)201940000004000000400000032838320
(14.)19940007341020
(15.)19950007558700
(16.)19990008641500
(17.)2005012000008000008075007500
(18.)2006012000009400008120000
(19.)2007012000009400009016350
(20.)2009150000010946618640001020250160250
(21.)20101500000150000012750002405500
(22.)20111500000150000013750002041500
(23.)20121500000150000014000003046800
(24.)201315000001500000150000010036000
(25.)201415000001500000150000010560000
(26.)201640000004000000180000017700000
(27.)201740000004000000240000021761110
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/IA0026(Rev01)
(ii)Name of the EIA Consultant Gaurang Environmental Solutions Private Limited
(iii)Address 102, SNG, Shree Ratna Apartments, Near Tambi petrol pump, Jhotwara Road, Banipark, Jaipur
(iv)Mobile No. 9782074776
(v)Landline No. 0141402911
(vi)Email Id gaurangenviro@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 13 Oct 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBS Rathore
DesignationDirector- Zawar SBU
Name of Company (Applicant Name should not be given here)HINDUSTAN ZINC LIMITED.
AddressYashad Bhawan, Udaipur-313004
Print