1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Onshore Oil and Gas Development Drilling and Production Involving Onshore drilling of 179 wells, production facilities and laying of assorted oil & gas flowlines/delivery lines in District Tinsukia (Assam) | (b)Name of the Company / Organisation | OIL INDIA LIMITED | (c)Registered Address | OIL INDIA LIMITED
DULIAJAN
District : Dibrugarh ,,Dibrugarh,Assam-786602 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Ajit Chandra Haloi | (b)Designation (Owner/ Partner/ CEO) | CGM(HSE) | (c)Address | Safety & Environment Department , Oil India Limited,
Duliajan,,,Dibrugarh,Assam-786602 | (d)Pin code | 786602 | (e)E-mail | safety@oilindia.in | (f)STD Code. | 374(f)Telephone No. | 2800542 | (g)Fax No. | 03742801796 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(b) Offshore and onshore oil and gas exploration, development & production
| Minor Activity | 8(a) Building and Construction projects
| (b)Category | A | (c)Proposal Number | IA/AS/IND2/165606/2007 | (d)Master Proposal Number(Single Window) | SW/165470/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 3 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | N Hapjan Dhola - 2 | (b)Pincode | 786151 | (c)Bounded Latitudes (North) | | From | | Degree | 27.442856 | Minutes | | Second | | From | | Degree | 27.635214 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 95.333333 | Minutes | | Second | | From | | Degree | 95.533953 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 83M6, 83M7, 83M10, 83M11 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 144 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 5 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Assam | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/375/2016-IA II (I) | (c)Date of Issue of TOR | 08 Sep 2017 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 07 Aug 2020 | (c)Date of Issue of EC | 28 Dec 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 12 Mar 2020 | Distance of Public Hearing Venue from the Proposed Project : | 1 |
| Public/ Community Hall, Baghjan TE | State : | Assam | District : | Tinsukia | Tehsil : | Doom Dooma | Village : | Baghjan |
| 146 | • Pollution control- soil, air and noise pollution; vehicular pollution, management of wastes released from drill sites etc.
• Protection of DSNP and Maguri Beel areas from pollution
• Plantation in | Others | Additional Deputy Commissioner | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Shillong | (iii)Letter No. | RO-NE/E/IA/AS/MI/59/169-71 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jun 13 2016 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 179 wells and 9 production installations | 41 | 179 | 220 | Others | No of wells | Others | Well Drilling | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | 179 wells and 9 production installations | 41 | 179 | 220 | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 16 Oct 2019 | (iv)Valid Upto | 15 Sep 2020 | (v)File No. | S&E/E/20/1613 | (vi)Application No. | S&E/E/20/1613 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 3500 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 4.41 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 8.77 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 5.01 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 3.5 | (b)Existing quantity of raw material/fuel | 0 | (c)Total quantity of raw material/fuel | 3.5 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | diesel | 3.5 | Kilo Litre per Day | | Local supplier | Road | | 50 | Others | through supplier | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 04 Oct 2017 To 30 Dec 2017 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 74 | 25 | 72 | 60 | (2.) | NOx | | Micro Gram per Meter Cube | 29.6 | 12.2 | 27.97 | 80 | (3.) | Others | CO | Mili Gram per Meter Cube | 0.85 | 0.15 | 0.76 | 2 | (4.) | PM10 | | Micro Gram per Meter Cube | 136 | 52 | 134 | 100 | (5.) | SO2 | | Micro Gram per Meter Cube | 8.6 | 4.2 | 7.5 | 80 | |
14.2. No. of Ground Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Chlorides | | | mg/l | | 27 | 12 | 250 | 1000 | (2.) | TSS | | | Others | Not Analyzed | 0 | 0 | 0 | 0 | (3.) | Heavy Metals | | Total Chromium | mg/l | | 0.01 | 0.01 | 0.05 | 0.05 | (4.) | pH | | | Others | No Unit | 7.4 | 6.5 | 6.5 | 8.5 | (5.) | TDS | | | mg/l | | 114 | 40 | 500 | 2000 | (6.) | Total Hardness | | | mg/l | | 76 | 16 | 200 | 600 | (7.) | Fluoride | | | mg/l | | 0.1 | 0.1 | 1 | 1.5 | (8.) | Others | Magnesium | | mg/l | | 11 | 0.96 | 30 | 100 | |
14.3. No. of Surface Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 2 | 2 | A | (2.) | pH | | Others | No Unit | 7.17 | 6.65 | A | (3.) | DO | | mg/l | | 8.8 | 7.6 | A | (4.) | COD | | mg/l | | 12 | 4 | A | (5.) | Others | Total Coliform | Others | MPN/ 100ml | 170 | 23 | B | |
14.4. No. of Ambient Noise monitoring locations : 24 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 47.53 | 39.5 | 45 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 58.1 | 51.1 | 55 | |
14.5. No. of Soil Sample Monitored locations : 6 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | No Unit | 6.27 | 4.94 | (2.) | K(Potassium) | Milligram per Kilogram | | 115 | 13 | (3.) | P(Phosphorus) | Milligram per Kilogram | | 10 | 3 | (4.) | N(Nitrogen) | Milligram per Kilogram | | 347 | 224 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 85 | 23 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.68 To 4.5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 40 | 0 | Copy of Permission Letter | modeOthers | Well at site | Others | Bore well | 21-4/1186/AS/MIN/2020 | 08 Jul 2020 | 40 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic wastewater | 8 | 8 | Soak Pit | Others | Reused at Site | 8 | 0 | (2.) | Drilling and Wash wastewater | 13.8 | 15 | Effluent Treatment Plant | Others | Reused at Site | 13.8 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 21.8 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 21.8 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Drill Cuttings | Industrial Waste | | 836 | Tons | 0 | Others | Disposed at HDPE lined pits within site | Others | Disposed at HDPE lined pits within site | (2.) | Waste Drilling Mud | Industrial Waste | | 1920 | Tons | 0 | Others | Disposed at HDPE lined pits within site | Others | Disposed at HDPE lined pits within site | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 24.19 | 1.4 | 12.13 | 36.33 | 80 | (2.) | SO2 | | Microgram per Meter Cube | 6.18 | 1.42 | 0.43 | 6.62 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 89.5 | 1.4 | 0.06 | 89.57 | 100 | (4.) | PM2.5 | | Microgram per Meter Cube | 48 | 0 | 0 | 48.01 | 60 | (5.) | Others(Specify) | Total Hydrocarbon | Microgram per Meter Cube | 763.36 | 1.42 | 0.08 | 763.45 | 0 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG Set | Diesel | 7 | 0.3 | NOx | | 1.836 | (2.) | DG Set | Diesel | 7 | 0.3 | Others | Hydrocarbon | 0.004 | (3.) | DG Set | Diesel | 7 | 0.3 | PM10 | | 0.007 | (4.) | DG Set | Diesel | 7 | 0.3 | SO2 | | 0.039 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 1250 | (b)Source | Diesel Generator Set | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 1250 | (e)Stack Height (in m) | 7 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 600 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 600 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 7401 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 1471 | (e)Settlements (ha.) | 6620 | (f)Industrial (ha.) | 64 | (g)Forest (ha.) | 2121 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Tea Garden, Marshy Land, Road Network, Railway Tra | 21324 | Total (ha.) | 39001.0000 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Wells and production installation | 600 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESAs | None | 10 | No ESA within 10 km | (2.) | Wildlife Corridors | None | 10 | No wildlife corridors within 10 km | (3.) | Critically Polluted Area | None | 10 | No critically polluted area within 10 km | (4.) | Corridors | None | 10 | No corridors within 10 km | (5.) | WLS | Bherjan-Borajan-Padumoni | 1 | Wildlife clearance application for the wells and production facilities will be submitted | (6.) | NPA | Dibru Saikhowa National Park | 1 | Distance from nearest proposed well | (7.) | ESZs | Dibru Saikhowa National Park | 0.1 | Distance of nearest proposed well from Notified ecosensitive zone of Dibru Saikhowa National Park | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | None | 10 | No archaeological sites within 10 km | (2.) | Forest | | Dibru Saikhowa NP and Bherjan Borjan Padumoni WLS | 1 | Dibru Saikhowa NP and Bherjan Borjan Padumoni WLS located 1 km from nearest proposed well | (3.) | Defence Installations | | None | 10 | No major defense installations within 10 km | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | Yes | (i)Status of NBWL | NIL | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 600 | (c)Status of Land acquisition if not acquired | In process | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | 35 Schedule-1 species | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 1.21 crore | (iii)Period of Implementation | 7 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Maguri Motapung Wetlands within the Block | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Brahmaputra River | (ii)Direction of Water Bodies in Buffer Area | North West | (iii)Distance of Water Bodies in Buffer Area | 0.9 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 20 | (b)Permanent Employment-During Operation | 40 | (c)Temporary Employment- During Construction | 80 | (d)Temporary Employment- During Operation | 40 | (e)No. of working days | 120 | (f)Total Manpower | 180 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 0 | 15.75 | 15.75 | (2.) | Percentage of Total Project Area | 0 | 2.63 | 2.63 | (3.) | No. of Plants | 0 | 25200 | 25200 | (4.) | Funds Allocated | 0 | 15.75 | 15.75 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Contributing to Forest Departments habitat improvement program
Capacity building of forest department staffs
Awareness Generation Meetings at villages
Engaging a NGO for Identification of Hoolock Gibbon and Vulture Roosting sites.
Ecological survey in Maguri Beel area
Plantation at DSNP through Forest Department, at abandoned drill sites, along the pipeline routes, at Tea Gardens | (2.) | Social | • Development activities- improvement of infrastructure in schools, road repair, provision of ambulance, fund for hospital development, fund for college development, provision of streetlights; fund for flood protection
• Programs related to livelihood generation, health improvement as per OIL’s Corporate Environmental Responsibility (CER) programmes. | (3.) | Financial | Provision of more royalty to Assam Government and more cess to Govt. of India Energy
security for the country | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Industrial Projects - 3 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1618/RA 0055 | (ii)Name of the EIA Consultant | ERM India Pvt. Ltd. | (iii)Address | Building 10, Tower A, 4th Floor, DLF Cyber City Gurgaon 122002 | (iv)Mobile No. | 9810295449 | (v)Landline No. | 0124411703 | (vi)Email Id | sushil.handa@erm.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 3 | (ix)Validity of Accreditation | 26 Oct 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Reply to ADS is attached | 28 Oct 2020 | 2. | NA |
The Committee during deliberations noted that the project proponent has uploaded the certified compliance of the existing status of the EC conditions issued by the Ministry’s Regional Office vide letter dated 5th July, 2016. The certified report has very serious observations against the ongoing projects and reported serious non-compliance by the PP. It was observed by the regional office that the PP has started development and production of the wells without obtaining prior environmental clearance. The Committee after detailed deliberations desired for following additional information/inputs in respect of the following:
(i). Action taken report on non-complied points to be forwarded by the Ministry’s Regional Office.
(ii) Justification, if any, for start of development/production of wells without prior environmental clearance.
(iii) Details of existing NBWL permission and status of NBWL clearance for the proposed project.
(iv)Public hearing issues, response and detailed action plan
The proposal was therefor DEFERRED for the needful.
| 30 Sep 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Ajit Chandra Haloi | Designation | CGM(HSE) | Name of Company (Applicant Name should not be given here) | OIL INDIA LIMITED | Address | OIL INDIA LIMITED
DULIAJAN
District : Dibrugarh |
|